Renewable Energy Advantage
How many solar installs has Renewable Energy Advantage done in California, and which license number is on its installs?
Renewable Energy Advantage has 423 residential solar installs interconnected in California, active in the records from 2013 through 2026 (May 22, 2013 to Aug 28, 2026), most of them in Orange County (169), Los Angeles County (157) and San Luis Obispo County (31). CSLB lists license 982201 (RENEWABLE ENERGY ADVANTAGE INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Mar 31, 2027.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 423
- Last 24 months
- 60
- Total capacity
- 3,578.9 kW DC
- Median system size
- 7.6 kW DC
- With battery storage
- 24.7% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 69.5% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
- Third-party owned
- 1.4% of 418 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 49 installs, latest Aug 28, 2026
- Ownership types recorded
- PPA 5, prepaid lease 1
- Median battery size
- 13.5 kWh (93 installs list a capacity)
- First install
- May 22, 2013
- Latest install
- Aug 28, 2026
- Counties
- 10
- Utilities
- SCE 345, SDGE 43, PGE 35
- CSLB license
- 982201
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2013 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2013 | 2 | 0 |
| 2014 | 2 | 0 |
| 2015 | 21 | 0 |
| 2016 | 29 | 0 |
| 2017 | 48 | 0 |
| 2018 | 61 | 5 |
| 2019 | 48 | 5 |
| 2020 | 29 | 5 |
| 2021 | 23 | 4 |
| 2022 | 30 | 10 |
| 2023 | 45 | 18 |
| 2024 | 31 | 11 |
| 2025 | 25 | 13 |
| 2026 (through Aug 31, 2026) | 29 | 23 |
The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
49 of its 423 interconnected installs (11.6% of the 423 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 77.1% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 28, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 80 | 18.9% | not counted |
| NEM 2.0 | 294 | 69.5% | 57 (21.8%) |
| Net Billing Tariff | 49 | 11.6% | 37 (77.1%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.
Leases, PPAs and third-party owners
On 6 of Renewable Energy Advantage’s installs the utility recorded a third-party ownership type: PPA 5, lease 0, prepaid lease 1, other 0. No residential system in the file lists a third-party owner name that matches Renewable Energy Advantage exactly.
| Third-party owner named on its installs | Installs |
|---|---|
| Spruce | 4 |
| HDM | 1 |
| Renewable Energy Adv | 1 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 60 of Renewable Energy Advantage’s 60 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (26, 43.3%) used modules recorded as Silfab.
In the last 24 months, 60 of Renewable Energy Advantage’s 60 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (30, 50.0%) used inverters recorded as Enphase.
In the last 24 months, 38 of Renewable Energy Advantage’s 60 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (30, 78.9%) used batteries recorded as Tesla.
89 of 94 battery-paired PG&E and SCE installs (94.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Silfab | 26 | 109 |
| Hyundai | 14 | not in top list | |
| Canadian Solar | 5 | 32 | |
| United Renewable Energy | 4 | not in top list | |
| JA Solar | 3 | not in top list | |
| Inverter maker | Enphase | 30 | 121 |
| Tesla | 26 | 28 | |
| SolarEdge | 3 | 188 | |
| Sol-Ark | 2 | not in top list | |
| Battery maker | Tesla | 30 | 31 |
| Enphase | 7 | 36 | |
| Lithion Battery Inc. | 1 | not in top list |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 413 of 423 installs, inverters on 423. See the methodology and the equipment index.
SGIP battery storage projects
The SGIP report names Renewable Energy Advantage as developer on 64 battery storage projects and as installer on 63 (63 name it as both), 64 projects in all with 2,134 kWh of storage. 28 have the status Paid, with $107,275 in current incentive allocations. Applications were received from Jun 7, 2017 to Dec 17, 2025.
By status
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 28 | 352 | $107,275 |
| Reserved | 7 | 772 | $146,439 |
| Pending Reservation | 1 | 40 | $9,900 |
| Cancelled | 25 | 932 | $246,271 |
| RRF Rejected | 3 | 38 | $5,589 |
By budget category
| Budget category | Projects | Storage kWh | Current incentive | Paid projects | Paid: current incentive |
|---|---|---|---|---|---|
| Small Residential Storage | 46 | 511 | $113,591 | 24 | $55,417 |
| Large-Scale Storage | 12 | 1,520 | $331,069 | 2 | $13,034 |
| Equity Resiliency | 3 | 65 | $65,224 | 2 | $38,824 |
| Not stated | 3 | 38 | $5,589 | 0 | $0 |
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 982201 | RENEWABLE ENERGY ADVANTAGE INC (Corporation) | CLEAR | C-10 Electrical Contractor | Mar 21, 2013 | Mar 31, 2027 | 409 |
License numbers are the ones the utilities recorded on the interconnection applications (413 of 423 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 982201. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Local solar permits naming its license
Solar permits in city and county open data that list Renewable Energy Advantage’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.
| Permit data | License | 2020 | Total |
|---|---|---|---|
| unincorporated San Diego County | 982201 | 1 | 1 |
Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.
Other names reported under the same license
- RENEWABLE ENERGY: 40 installs, license 982201
Counties
| County | Installs |
|---|---|
| Orange | 169 |
| Los Angeles | 157 |
| San Luis Obispo | 31 |
| Riverside | 21 |
| San Diego | 18 |
| San Bernardino | 12 |
| Ventura | 8 |
| Kern | 3 |
| Santa Barbara | 3 |
| Monterey | 1 |
Top cities
| City | Installs |
|---|---|
| Orange | 20 |
| Rancho Palos Verdes | 19 |
| Newport Beach | 16 |
| Manhattan Beach | 14 |
| Long Beach | 13 |
| Hermosa Beach | 12 |
| Laguna Niguel | 12 |
| Costa Mesa | 11 |
| Santa Ana | 11 |
| Yorba Linda | 11 |
| Arroyo Grande | 10 |
| Redondo Beach | 9 |
| Torrance | 9 |
| Corona del Mar | 8 |
| Irvine | 8 |
Names as recorded by the utilities
The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| RENEWABLE ENERGY ADVANTAGE INC | 272 |
| Renewable Energy Advantage | 110 |
| Renewable Energy Advantage, Inc. | 35 |
| renewable energy advantage | 2 |
| renewable Energy Advantage | 2 |
| Renewable Energy Advantage, Inc | 2 |
Common questions
Where does Renewable Energy Advantage install solar?
Its installs are spread across 10 counties. The most are in Orange County (169 installs), followed by Los Angeles County (157).
How often does Renewable Energy Advantage install batteries with solar?
24.7% of its interconnected solar installs include battery storage across all years, and 69.5% in the last 24 months (41 of 59). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.
How many Renewable Energy Advantage installs are under NEM 3.0 (the Net Billing Tariff)?
49 of its 423 interconnected installs (11.6% of the 423 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 77.1% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
- Self-Generation Incentive Program (SGIP) program administrators: Real-Time Public Report of SGIP applications (selfgenca.com)
Records last pulled Nov 16, 2026. Every entry links to the original public record.