FREEDOM FOREVER SOUTHERN CALIFORNIA LLC
How many solar installs has FREEDOM FOREVER SOUTHERN CALIFORNIA LLC done in California, and which license number is on its installs?
FREEDOM FOREVER SOUTHERN CALIFORNIA LLC has 1,048 residential solar installs interconnected in California, active in the records from 2024 through 2026 (Oct 4, 2024 to Apr 25, 2026), most of them in Los Angeles County (301), San Bernardino County (240) and Riverside County (210). The license number recorded on most of its installs, 1124448, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 1,048
- Last 24 months
- 1,048
- Total capacity
- 8,706.8 kW DC
- Median system size
- 7.5 kW DC
- With battery storage
- 96.4% all time; 96.4% last 24 months
- Third-party owned
- 79.3% of 1,048 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 1,043 installs, latest Apr 25, 2026
- Ownership types recorded
- PPA 379, lease 450, prepaid lease 2
- Median battery size
- 13.5 kWh (1,007 installs list a capacity)
- First install
- Oct 4, 2024
- Latest install
- Apr 25, 2026
- Counties
- 11
- Utilities
- SCE 1,029, PGE 19
- CSLB license
- 1124448
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2024 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2024 | 214 | 194 |
| 2025 | 819 | 801 |
| 2026 (through Aug 31, 2026) | 15 | 15 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
1,043 of its 1,048 interconnected installs (99.5% of the 1,048 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 96.4% of those include battery storage. The latest Net Billing Tariff install was approved Apr 25, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 0 | 0.0% | not counted |
| NEM 2.0 | 5 | 0.5% | 5 (100.0%) |
| Net Billing Tariff | 1,043 | 99.5% | 1,005 (96.4%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
On 831 of FREEDOM FOREVER SOUTHERN CALIFORNIA LLC’s installs the utility recorded a third-party ownership type: PPA 379, lease 450, prepaid lease 2, other 0. No residential system in the file lists a third-party owner name that matches FREEDOM FOREVER SOUTHERN CALIFORNIA LLC exactly.
| Third-party owner named on its installs | Installs |
|---|---|
| Enfin | 556 |
| Goodleap | 92 |
| Everbright | 85 |
| Sunrun | 84 |
| Sunnova | 7 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 1,018 of FREEDOM FOREVER SOUTHERN CALIFORNIA LLC’s 1,048 installs name a module maker in the “Generator Manufacturer” fields, and most of those (692, 68.0%) used modules recorded as Qcells.
In the last 24 months, 1,048 of FREEDOM FOREVER SOUTHERN CALIFORNIA LLC’s 1,048 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (573, 54.7%) used inverters recorded as SolarEdge.
In the last 24 months, 1,007 of FREEDOM FOREVER SOUTHERN CALIFORNIA LLC’s 1,048 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (496, 49.3%) used batteries recorded as SolarEdge.
1,007 of 1,010 battery-paired PG&E and SCE installs (99.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 692 | 692 |
| Trina Solar | 108 | 108 | |
| Canadian Solar | 90 | 90 | |
| JinkoSolar | 88 | 88 | |
| JA Solar | 36 | 36 | |
| Inverter maker | SolarEdge | 573 | 573 |
| Tesla | 392 | 392 | |
| Enphase | 174 | 174 | |
| SunPower | 15 | 15 | |
| ABB | 11 | 11 | |
| Battery maker | SolarEdge | 496 | 496 |
| Tesla | 418 | 418 | |
| Enphase | 87 | 87 | |
| Powerwall 3 | 3 | 3 | |
| LG | 1 | 1 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 1,018 of 1,048 installs, inverters on 1,048. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 1124448 | Not found in the CSLB License Master file pulled Nov 4, 2026 | 1,048 | ||||
License numbers are the ones the utilities recorded on the interconnection applications (1,048 of 1,048 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
Local solar permits naming its license
Solar permits in city and county open data that list FREEDOM FOREVER SOUTHERN CALIFORNIA LLC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.
| Permit data | License | 2024 | 2025 | 2026 | Total |
|---|---|---|---|---|---|
| unincorporated San Diego County | 1124448 | 14 | 129 | 48 | 191 |
Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.
Other names reported under the same license
- FREEDOM FOREVER LLC: 36,681 installs, license 1124448
- Freedom Solar Co: 6,035 installs, license 1124448
Counties
| County | Installs |
|---|---|
| Los Angeles | 301 |
| San Bernardino | 240 |
| Riverside | 210 |
| Orange | 166 |
| Tulare | 51 |
| Ventura | 34 |
| Santa Barbara | 19 |
| Kern | 16 |
| Kings | 9 |
| Humboldt | 1 |
| Mono | 1 |
Top cities
| City | Installs |
|---|---|
| Lancaster | 32 |
| Victorville | 32 |
| Palmdale | 31 |
| Fontana | 29 |
| Ontario | 23 |
| Corona | 21 |
| Hemet | 20 |
| Visalia | 20 |
| Hesperia | 19 |
| San Bernardino | 19 |
| Moreno Valley | 16 |
| Murrieta | 16 |
| Santa Ana | 16 |
| Huntington Beach | 15 |
| Rancho Santa Margarita | 15 |
Names as recorded by the utilities
The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| FREEDOM FOREVER SOUTHERN CALIFORNIA LLC | 1,048 |
Common questions
Where does FREEDOM FOREVER SOUTHERN CALIFORNIA LLC install solar?
Its installs are spread across 11 counties. The most are in Los Angeles County (301 installs), followed by San Bernardino County (240).
How often does FREEDOM FOREVER SOUTHERN CALIFORNIA LLC install batteries with solar?
96.4% of its interconnected solar installs include battery storage across all years, and 96.4% in the last 24 months (1,010 of 1,048).
How many FREEDOM FOREVER SOUTHERN CALIFORNIA LLC installs are under NEM 3.0 (the Net Billing Tariff)?
1,043 of its 1,048 interconnected installs (99.5% of the 1,048 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 96.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors