Solar installers in Ontario, California
Most installs here are in San Bernardino County.
Who installs the most solar in Ontario?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Ontario are SunPower (486), Sunrun (480) and GAF Energy (440). They account for 1,406 of the 2,717 residential solar installs interconnected there in that window.
In all, 13,504 homes in Ontario have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 138 installers with installs in this window. 21 installs in the window were self-installed or had no installer recorded.
| 1 | SunPower | 486 | 3,485 |
| 2 | Sunrun | 480 | 1,323 |
| 3 | GAF Energy | 440 | 440 |
| 4 | Complete Solar | 226 | 283 |
| 5 | SUNNOVA ENERGY CORPORATION | 179 | 1,100 |
| 6 | SOLARA HOME ENERGY LLC | 77 | 77 |
| 7 | V3 Electric | 77 | 186 |
| 8 | BRIGHT OPS | 74 | 108 |
| 9 | B P I | 66 | 66 |
| 10 | MARS BUILDER SOLUTIONS | 47 | 47 |
| 11 | Denali Development Group, Inc. | 37 | 37 |
| 12 | BRYTON POWER LLC | 36 | 44 |
| 13 | FREEDOM FOREVER LLC | 36 | 219 |
| 14 | GRID Alternatives | 36 | 193 |
| 15 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 26 | 254 |
| 16 | FREEDOM FOREVER SOUTHERN CALIFORNIA LLC | 23 | 23 |
| 17 | LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC | 19 | 35 |
| 18 | SolarMax Renewable Energy Provider, Inc | 19 | 120 |
| 19 | SOUTH WEST BUILDERS | 17 | 30 |
| 20 | LUXOR ENERGY INC | 11 | 16 |
| 21 | PORTICADE ENERGY LLC | 11 | 11 |
| 22 | BETTER EARTH ELECTRIC INC | 10 | 80 |
| 23 | ORANGE COUNTY CONTRACTING SERVICES | 10 | 14 |
| 24 | Powur PBC (Powur Home) | 10 | 72 |
| 25 | Current Home | 9 | 68 |
Most installs, all time
| 1 | SunPower | 3,485 | 3,485 |
| 2 | Sunrun | 1,323 | 1,323 |
| 3 | SUNNOVA ENERGY CORPORATION | 1,100 | 1,100 |
| 4 | SunStreet Energy Group LLC | 714 | 714 |
| 5 | Tesla Energy Operations (formerly SolarCity) | 676 | 676 |
| 6 | Vivint Solar Developer, LLC | 614 | 614 |
| 7 | GAF Energy | 440 | 440 |
| 8 | Complete Solar | 283 | 283 |
| 9 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 254 | 254 |
| 10 | Bright Planet Solar | 229 | 229 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 1,853 | 55 |
| 2023 | 2,048 | 140 |
| 2024 | 1,627 | 563 |
| 2025 | 1,204 | 599 |
| 2026 (through Aug 31, 2026) | 1,000 | 683 |
Under the Net Billing Tariff (NEM 3.0)
3,158 of the 13,504 residential solar installs in Ontario (23.4% of the 13,504 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 58.8% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Ontario
| 1 | Sunrun | 538 | 373 | 69.3% |
| 2 | GAF Energy | 440 | 440 | 100.0% |
| 3 | SunPower | 423 | 15 | 3.5% |
| 4 | SUNNOVA ENERGY CORPORATION | 333 | 215 | 64.6% |
| 5 | Complete Solar | 215 | 23 | 10.7% |
| 6 | BRIGHT OPS | 108 | 95 | 88.0% |
| 7 | V3 Electric | 99 | 98 | 99.0% |
| 8 | GRID Alternatives | 78 | 13 | 16.7% |
| 9 | SOLARA HOME ENERGY LLC | 77 | 17 | 22.1% |
| 10 | Bright Planet Solar | 60 | 22 | 36.7% |
| 11 | FREEDOM FOREVER LLC | 54 | 52 | 96.3% |
| 12 | MARS BUILDER SOLUTIONS | 47 | 13 | 27.7% |
| 13 | BRYTON POWER LLC | 44 | 40 | 90.9% |
| 14 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 40 | 37 | 92.5% |
| 15 | Denali Development Group, Inc. | 37 | 0 | 0.0% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Equipment recorded
In the last 24 months, 2,706 of Ontario’s 2,717 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1,718, 63.5%) used modules recorded as Qcells.
In the last 24 months, 2,717 of Ontario’s 2,717 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1,850, 68.1%) used inverters recorded as Enphase.
In the last 24 months, 1,530 of Ontario’s 2,717 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (651, 42.5%) used batteries recorded as Tesla.
2,103 of 2,137 battery-paired PG&E and SCE installs (98.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 1,718 | 4,104 |
| LONGi | 274 | 713 | |
| JA Solar | 205 | 768 | |
| Canadian Solar | 110 | 612 | |
| Hyundai | 80 | 272 | |
| Inverter maker | Enphase | 1,850 | 5,884 |
| Tesla | 519 | 759 | |
| SolarEdge | 322 | 3,717 | |
| Solis (Ginlong) | 69 | not in top list | |
| SunPower | 26 | 1,768 | |
| Battery maker | Tesla | 651 | 830 |
| FranklinWH | 449 | 459 | |
| Enphase | 293 | 404 | |
| SolarEdge | 118 | 235 | |
| LG | 4 | 123 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 12,407 of 13,504 installs, inverters on 13,504. See the methodology and the equipment index.
ZIP codes in Ontario
ZIP codes with their own page where the utilities recorded Ontario on at least 10% of the ZIP’s installs, through Aug 31, 2026.
SGIP battery storage projects in Ontario
The SGIP report lists 224 battery storage projects with the city Ontario, 91 with the status Paid ($3,959,075 in current incentive allocations, 7,258 kWh).
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 91 | 7,258 | $3,959,075 |
| PBI in Process | 5 | 4,673 | $2,524,127 |
| Reserved | 23 | 9,667 | $1,626,642 |
| Pending Reservation | 7 | 3,803 | $693,795 |
| Waitlist | 21 | 297 | $486,899 |
| Cancelled | 70 | 29,718 | $11,564,510 |
| RRF Rejected | 7 | 72 | $11,726 |
Installers named on the most SGIP storage projects in Ontario
67 of the 224 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
At a glance
- Residential solar installs
- 13,504
- Last 24 months
- 2,717
- Capacity
- 70.5 MW DC
- Median system size
- 4.1 kW DC
- With battery storage
- 15.8% all time; 56.9% last 24 months
- Third-party owned
- 50.4% where reported
- Ownership types recorded
- PPA 4,528, lease 1,840, prepaid lease 13, other 164
- Median battery size
- 13.5 kWh
- Earliest install in data
- Jun 25, 2002
Common questions
How many homes in Ontario have solar?
13,504 residential solar systems in Ontario were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 2,717 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Ontario?
138 installer names have at least one install interconnected in Ontario in the last 24 months, and 581 appear in the full record.
How common are batteries with new solar in Ontario?
15.8% of the solar installs interconnected in Ontario include battery storage across all years, and 56.9% in the last 24 months (1,547 of 2,717).
How many solar installs in Ontario are under NEM 3.0?
3,158 of the 13,504 residential solar installs in Ontario (23.4% of the 13,504 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 58.8% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.