Denali Development Group, Inc.

How many solar installs has Denali Development Group, Inc. done in California, and which license number is on its installs?

Denali Development Group, Inc. has 137 residential solar installs interconnected in California, active in the records from 2009 through 2026 (Sep 21, 2009 to Aug 3, 2026), most of them in Orange County (63), San Bernardino County (38) and Los Angeles County (31). CSLB lists license 806493 (MAVERICK CONSTRUCTION) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Apr 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
137
Last 24 months
64
Total capacity
860.1 kW DC
Median system size
5.7 kW DC
With battery storage
21.2% all time; 29.7% last 24 months
Third-party owned
0.0% of 137 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
64 installs, latest Aug 3, 2026
Ownership types recorded
none recorded
Median battery size
15 kWh (29 installs list a capacity)
First install
Sep 21, 2009
Latest install
Aug 3, 2026
Counties
4
Utilities
SCE 137
CSLB license
806493

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2009 to 2026

YearInstalls interconnectedWith battery storage
200920
201010
201100
201200
201300
201400
201560
2016170
201700
201860
201931
202020
202130
202271
2023175
2024489
2025169
2026 (through Aug 31, 2026)94

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

64 of its 137 interconnected installs (46.7% of the 137 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 31.3% of those include battery storage. The latest Net Billing Tariff install was approved Aug 3, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.02619.0%not counted
NEM 2.04734.3%9 (19.1%)
Net Billing Tariff6446.7%20 (31.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Denali Development Group, Inc.’s installs. No residential system in the file lists a third-party owner name that matches Denali Development Group, Inc. exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 63 of Denali Development Group, Inc.’s 64 installs name a module maker in the “Generator Manufacturer” fields, and most of those (41, 65.1%) used modules recorded as Hyundai.

In the last 24 months, 64 of Denali Development Group, Inc.’s 64 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (50, 78.1%) used inverters recorded as Enphase.

In the last 24 months, 16 of Denali Development Group, Inc.’s 64 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (4, 25.0%) used batteries recorded as Enphase.

25 of 29 battery-paired PG&E and SCE installs (86.2%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHyundai4141
REC1635
Solaria413
Qcells2not in top list
Savant Power System2not in top list
Inverter makerEnphase5094
PointGuard Energy Inc.55
Generac2not in top list
Savant System2not in top list
SolarEdge211
Battery makerEnphase49
Tesla45
Generac36
PointGuard33
PointGuard Energy Inc.22

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 129 of 137 installs, inverters on 137. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
806493MAVERICK CONSTRUCTION (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorApr 11, 2002Apr 30, 2028118

License numbers are the ones the utilities recorded on the interconnection applications (118 of 137 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 806493. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Orange63
San Bernardino38
Los Angeles31
Riverside5

Top cities

CityInstalls
Ontario37
Long Beach20
Newport Beach16
Huntington Beach10
Corona del Mar5
Laguna Beach5
Los Alamitos5
Costa Mesa3
Rancho Palos Verdes3
Cypress2
Fountain Valley2
Fullerton2
Irvine2
Laguna Niguel2
Orange2

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
DENALI DEVELOPMENT GROUP INC DBA MAVERICK CONSTRUCTION98
Denali Development Group, Inc.23
DENALI DEVELOPMENT GROUP INC13
Denali Development Group, Inc2
DENALI DEVELOPMENT GROUP, INC.1

Common questions

Where does Denali Development Group, Inc. install solar?

Its installs are spread across 4 counties. The most are in Orange County (63 installs), followed by San Bernardino County (38).

How often does Denali Development Group, Inc. install batteries with solar?

21.2% of its interconnected solar installs include battery storage across all years, and 29.7% in the last 24 months (19 of 64).

How many Denali Development Group, Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

64 of its 137 interconnected installs (46.7% of the 137 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 31.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.