Solar installers in Fullerton, California
Most installs here are in Orange County.
Who installs the most solar in Fullerton?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Fullerton are Sunrun (171), GAF Energy (53) and Tesla Energy Operations (formerly SolarCity) (53). They account for 277 of the 769 residential solar installs interconnected there in that window.
In all, 5,566 homes in Fullerton have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 142 installers with installs in this window. 26 installs in the window were self-installed or had no installer recorded.
Most installs, all time
| 1 | Tesla Energy Operations (formerly SolarCity) | 690 | 690 |
| 2 | Sunrun | 576 | 576 |
| 3 | FREEDOM FOREVER LLC | 136 | 136 |
| 4 | SunPower | 130 | 130 |
| 5 | Vivint Solar Developer, LLC | 110 | 110 |
| 6 | Bright Planet Solar | 100 | 100 |
| 7 | PetersenDean | 97 | 97 |
| 8 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 91 | 91 |
| 9 | Verengo | 90 | 90 |
| 10 | SolarMax Renewable Energy Provider, Inc | 84 | 84 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 676 | 82 |
| 2023 | 848 | 118 |
| 2024 | 390 | 251 |
| 2025 | 320 | 289 |
| 2026 (through Aug 31, 2026) | 318 | 294 |
Under the Net Billing Tariff (NEM 3.0)
925 of the 5,566 residential solar installs in Fullerton (16.6% of the 5,566 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 87.6% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Fullerton
| 1 | Sunrun | 220 | 219 | 99.5% |
| 2 | Tesla Energy Operations (formerly SolarCity) | 62 | 59 | 95.2% |
| 3 | GAF Energy | 54 | 52 | 96.3% |
| 4 | ORANGE COUNTY CONTRACTING SERVICES | 43 | 41 | 95.3% |
| 5 | BRIGHT OPS | 42 | 38 | 90.5% |
| 6 | FREEDOM FOREVER LLC | 35 | 34 | 97.1% |
| 7 | ELIONE ENERGY INC | 20 | 18 | 90.0% |
| 8 | INFINITY SOLAR | 20 | 17 | 85.0% |
| 9 | LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC | 18 | 17 | 94.4% |
| 10 | KBC ENERGY GROUP INC | 16 | 12 | 75.0% |
| 11 | Solar Optimum Inc. | 13 | 12 | 92.3% |
| 12 | AMECO SOLAR LLC | 12 | 11 | 91.7% |
| 13 | BETTER EARTH ELECTRIC INC | 11 | 11 | 100.0% |
| 14 | SOUTH WEST BUILDERS | 10 | 7 | 70.0% |
| 15 | SWSS ELECTRICAL | 10 | 9 | 90.0% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Equipment recorded
In the last 24 months, 761 of Fullerton’s 769 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (284, 37.3%) used modules recorded as Qcells.
In the last 24 months, 769 of Fullerton’s 769 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (370, 48.1%) used inverters recorded as Tesla.
In the last 24 months, 669 of Fullerton’s 769 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (440, 65.8%) used batteries recorded as Tesla.
1,160 of 1,201 battery-paired PG&E and SCE installs (96.6%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 284 | 1,149 |
| LONGi | 111 | 301 | |
| REC | 70 | 367 | |
| Silfab | 65 | not in top list | |
| JA Solar | 55 | 172 | |
| Inverter maker | Tesla | 370 | 473 |
| Enphase | 259 | 1,858 | |
| SolarEdge | 136 | 1,779 | |
| ABB | 11 | 343 | |
| Qcells | 11 | not in top list | |
| Battery maker | Tesla | 440 | 658 |
| Enphase | 92 | 172 | |
| FranklinWH | 68 | 69 | |
| SolarEdge | 54 | 70 | |
| LG | 4 | 152 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 4,608 of 5,566 installs, inverters on 5,565. See the methodology and the equipment index.
ZIP codes in Fullerton
ZIP codes with their own page where the utilities recorded Fullerton on at least 10% of the ZIP’s installs, through Aug 31, 2026.
SGIP battery storage projects in Fullerton
The SGIP report lists 239 battery storage projects with the city Fullerton, 127 with the status Paid ($1,011,642 in current incentive allocations, 3,004 kWh).
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 127 | 3,004 | $1,011,642 |
| Reserved | 38 | 1,282 | $1,397,801 |
| Pending Reservation | 12 | 1,136 | $7,119,566 |
| Waitlist | 5 | 69 | $139,637 |
| Cancelled | 55 | 10,581 | $5,598,664 |
| RRF Rejected | 2 | 18 | $2,709 |
Installers named on the most SGIP storage projects in Fullerton
44 of the 239 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
SolarAPP+ automated permitting
Fullerton is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, MPU, MBD. The list gives no start date.
Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.
At a glance
- Residential solar installs
- 5,566
- Last 24 months
- 769
- Capacity
- 40.8 MW DC
- Median system size
- 6.7 kW DC
- With battery storage
- 21.6% all time; 89.5% last 24 months
- Third-party owned
- 33.0% where reported
- Ownership types recorded
- PPA 1,294, lease 343, prepaid lease 9, other 66
- Median battery size
- 13.5 kWh
- Earliest install in data
- Mar 8, 2002
Common questions
How many homes in Fullerton have solar?
5,566 residential solar systems in Fullerton were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 769 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Fullerton?
142 installer names have at least one install interconnected in Fullerton in the last 24 months, and 694 appear in the full record.
How common are batteries with new solar in Fullerton?
21.6% of the solar installs interconnected in Fullerton include battery storage across all years, and 89.5% in the last 24 months (688 of 769).
How many solar installs in Fullerton are under NEM 3.0?
925 of the 5,566 residential solar installs in Fullerton (16.6% of the 5,566 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 87.6% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.