How many solar installs has ELIONE ENERGY INC done in California, and which license number is on its installs?

ELIONE ENERGY INC has 514 residential solar installs interconnected in California, active in the records from 2021 through 2026 (Mar 19, 2021 to Aug 17, 2026), most of them in Orange County (265), Los Angeles County (175) and San Bernardino County (45). CSLB lists license 1073542 (ELIONE ENERGY INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-20, expires Feb 28, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
514
Last 24 months
106
Total capacity
4,661.4 kW DC
Median system size
8.8 kW DC
With battery storage
23.0% all time; 84.9% last 24 months
Third-party owned
0.0% of 514 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
134 installs, latest Aug 14, 2026
Ownership types recorded
none recorded
Median battery size
13.5 kWh (118 installs list a capacity)
First install
Mar 19, 2021
Latest install
Aug 17, 2026
Counties
6
Utilities
SCE 512, PGE 2
CSLB license
1073542

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
2021521
20221491
20231624
20246036
20254939
2026 (through Aug 31, 2026)4237

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

134 of its 514 interconnected installs (26.1% of the 514 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 83.6% of those include battery storage. The latest Net Billing Tariff install was approved Aug 14, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.038073.9%6 (1.6%)
Net Billing Tariff13426.1%112 (83.6%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on ELIONE ENERGY INC’s installs. No residential system in the file lists a third-party owner name that matches ELIONE ENERGY INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 106 of ELIONE ENERGY INC’s 106 installs name a module maker in the “Generator Manufacturer” fields, and most of those (86, 81.1%) used modules recorded as Qcells.

In the last 24 months, 106 of ELIONE ENERGY INC’s 106 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (55, 51.9%) used inverters recorded as Tesla.

In the last 24 months, 87 of ELIONE ENERGY INC’s 106 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (57, 65.5%) used batteries recorded as Tesla.

115 of 118 battery-paired PG&E and SCE installs (97.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells86464
Hyundai1717
LG14
Panasonic11
Zhejiang Sunpro Power Technology11
Inverter makerTesla5567
Enphase48218
Qcells2not in top list
SolarEdge2166
Battery makerTesla5757
Enphase2451
LG66

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 487 of 514 installs, inverters on 514. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names ELIONE ENERGY INC as developer on 38 battery storage projects and as installer on 38 (38 name it as both), 38 projects in all with 500 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Jul 9, 2025 to Jul 29, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Reserved38500$844,603

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Residential Solar and Storage Equity - AB 209 Non-POU38500$844,6030$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1073542ELIONE ENERGY INC (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning ContractorFeb 23, 2021Feb 28, 2027514

License numbers are the ones the utilities recorded on the interconnection applications (514 of 514 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1073542. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Orange265
Los Angeles175
San Bernardino45
Riverside25
Kern2
Ventura2

Top cities

CityInstalls
Fullerton78
Buena Park38
Irvine31
Cypress27
Cerritos25
La Mirada23
La Habra18
La Palma15
Brea14
Chino Hills14
Torrance14
Yorba Linda12
Corona10
Whittier9
La Crescenta7

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ELIONE ENERGY INC514

Common questions

Where does ELIONE ENERGY INC install solar?

Its installs are spread across 6 counties. The most are in Orange County (265 installs), followed by Los Angeles County (175).

How often does ELIONE ENERGY INC install batteries with solar?

23.0% of its interconnected solar installs include battery storage across all years, and 84.9% in the last 24 months (90 of 106).

How many ELIONE ENERGY INC installs are under NEM 3.0 (the Net Billing Tariff)?

134 of its 514 interconnected installs (26.1% of the 514 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 83.6% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.