Solar installers in Chino Hills, California
Most installs here are in San Bernardino County.
Who installs the most solar in Chino Hills?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Chino Hills are Sunrun (349), Tesla Energy Operations (formerly SolarCity) (100) and SolarMax Renewable Energy Provider, Inc (25). They account for 474 of the 764 residential solar installs interconnected there in that window.
In all, 4,832 homes in Chino Hills have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 114 installers with installs in this window. 12 installs in the window were self-installed or had no installer recorded.
Most installs, all time
| 1 | Tesla Energy Operations (formerly SolarCity) | 859 | 859 |
| 2 | Sunrun | 825 | 825 |
| 3 | SunPower | 206 | 206 |
| 4 | SolarMax Renewable Energy Provider, Inc | 140 | 140 |
| 5 | FREEDOM FOREVER LLC | 103 | 103 |
| 6 | SUN BEES GROUPS INC DBA TRUE POWER SOLAR | 84 | 84 |
| 7 | Solar Optimum Inc. | 69 | 69 |
| 8 | Verengo | 68 | 68 |
| 9 | Horizon Solar Power | 62 | 62 |
| 10 | American Solar | 57 | 57 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 582 | 88 |
| 2023 | 713 | 133 |
| 2024 | 256 | 178 |
| 2025 | 441 | 320 |
| 2026 (through Aug 31, 2026) | 254 | 195 |
Under the Net Billing Tariff (NEM 3.0)
910 of the 4,832 residential solar installs in Chino Hills (18.8% of the 4,832 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 74.9% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Chino Hills
| 1 | Sunrun | 402 | 250 | 62.2% |
| 2 | Tesla Energy Operations (formerly SolarCity) | 121 | 113 | 93.4% |
| 3 | FREEDOM FOREVER LLC | 28 | 28 | 100.0% |
| 4 | BRIGHT OPS | 23 | 22 | 95.7% |
| 5 | SolarMax Renewable Energy Provider, Inc | 22 | 22 | 100.0% |
| 6 | SunPower | 21 | 15 | 71.4% |
| 7 | LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC | 18 | 17 | 94.4% |
| 8 | Solar Optimum Inc. | 15 | 14 | 93.3% |
| 9 | SOLEN ENERGY CONSTRUCTION CORPORATION | 12 | 12 | 100.0% |
| 10 | Powur PBC (Powur Home) | 11 | 11 | 100.0% |
| 11 | CLEAN-POWER2N | 9 | 9 | 100.0% |
| 12 | V3 Electric | 9 | 8 | 88.9% |
| 13 | AXIA SOLAR CORP | 8 | 5 | 62.5% |
| 14 | BETTER EARTH ELECTRIC INC | 8 | 7 | 87.5% |
| 15 | ORANGE COUNTY CONTRACTING SERVICES | 8 | 8 | 100.0% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Equipment recorded
In the last 24 months, 763 of Chino Hills’ 764 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (355, 46.5%) used modules recorded as Qcells.
In the last 24 months, 764 of Chino Hills’ 764 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (344, 45.0%) used inverters recorded as Tesla.
In the last 24 months, 547 of Chino Hills’ 764 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (405, 74.0%) used batteries recorded as Tesla.
986 of 1,032 battery-paired PG&E and SCE installs (95.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 355 | 1,081 |
| LONGi | 82 | 246 | |
| JA Solar | 70 | 215 | |
| Silfab | 45 | not in top list | |
| REC | 38 | 241 | |
| Inverter maker | Tesla | 344 | 447 |
| Enphase | 275 | 1,556 | |
| SolarEdge | 125 | 1,374 | |
| Qcells | 14 | not in top list | |
| Delta Electronics | 13 | 114 | |
| Battery maker | Tesla | 405 | 660 |
| SolarEdge | 58 | 100 | |
| Enphase | 57 | 96 | |
| FranklinWH | 7 | 8 | |
| SolaX Power Network Technology (Zhe jiang) Co., Ltd. | 7 | 7 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 3,961 of 4,832 installs, inverters on 4,830. See the methodology and the equipment index.
ZIP codes in Chino Hills
ZIP codes with their own page where the utilities recorded Chino Hills on at least 10% of the ZIP’s installs, through Aug 31, 2026.
| 91709 | 4,821 | 4,829 | 763 |
SGIP battery storage projects in Chino Hills
The SGIP report lists 235 battery storage projects with the city Chino Hills, 119 with the status Paid ($2,066,335 in current incentive allocations, 5,789 kWh).
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 119 | 5,789 | $2,066,335 |
| Reserved | 47 | 703 | $1,052,846 |
| Pending Reservation | 15 | 214 | $388,577 |
| Waitlist | 9 | 124 | $268,781 |
| Cancelled | 43 | 855 | $669,475 |
| RRF Rejected | 2 | 27 | $2,456 |
Installers named on the most SGIP storage projects in Chino Hills
| Installer | Projects | Paid |
|---|---|---|
| SolarMax Renewable Energy Provider, Inc | 46 | 18 |
| Sunrun | 23 | 12 |
| Tesla Energy Operations (formerly SolarCity) | 23 | 23 |
| Tesla | 16 | 16 |
| Solar Optimum Inc. | 13 | 7 |
| SunPower | 12 | 7 |
| Semper Solaris Construction Inc | 11 | 10 |
| CLEAN-POWER2N | 10 | 3 |
| SUNLUX | 6 | 6 |
| OXFORD INTELLIGENT ENERGY CO LTD | 4 | 0 |
37 of the 235 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
SolarAPP+ automated permitting
Chino Hills is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, MPU, MBD. The list gives no start date.
Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.
At a glance
- Residential solar installs
- 4,832
- Last 24 months
- 764
- Capacity
- 36.1 MW DC
- Median system size
- 6.8 kW DC
- With battery storage
- 21.4% all time; 74.3% last 24 months
- Third-party owned
- 36.5% where reported
- Ownership types recorded
- PPA 1,101, lease 441, prepaid lease 9, other 99
- Median battery size
- 13.5 kWh
- Earliest install in data
- Mar 9, 1999
Common questions
How many homes in Chino Hills have solar?
4,832 residential solar systems in Chino Hills were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 764 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Chino Hills?
114 installer names have at least one install interconnected in Chino Hills in the last 24 months, and 561 appear in the full record.
How common are batteries with new solar in Chino Hills?
21.4% of the solar installs interconnected in Chino Hills include battery storage across all years, and 74.3% in the last 24 months (568 of 764).
How many solar installs in Chino Hills are under NEM 3.0?
910 of the 4,832 residential solar installs in Chino Hills (18.8% of the 4,832 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 74.9% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.