SOLEN ENERGY CONSTRUCTION CORPORATION

How many solar installs has SOLEN ENERGY CONSTRUCTION CORPORATION done in California, and which license number is on its installs?

SOLEN ENERGY CONSTRUCTION CORPORATION has 233 residential solar installs interconnected in California, active in the records from 2024 through 2026 (Jan 30, 2024 to Aug 25, 2026), most of them in Los Angeles County (106), San Bernardino County (49) and Orange County (38). CSLB lists license 1111581 (SOLEN ENERGY UPGRADE CONSTRUCTION) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Oct 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
233
Last 24 months
230
Total capacity
2,159.4 kW DC
Median system size
8.2 kW DC
With battery storage
93.5% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 93.9% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
65.2% of 233 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
231 installs, latest Aug 25, 2026
Ownership types recorded
PPA 129, lease 4, prepaid lease 1, other 18
Median battery size
13.5 kWh (217 installs list a capacity)
First install
Jan 30, 2024
Latest install
Aug 25, 2026
Counties
6
Utilities
SCE 232, SDGE 1
CSLB license
1111581

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2024 to 2026

YearInstalls interconnectedWith battery storage
20241716
20259186
2026 (through Aug 31, 2026)125115

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

231 of its 233 interconnected installs (99.1% of the 233 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 93.5% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 25, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.020.9%2 (100.0%)
Net Billing Tariff23199.1%215 (93.5%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 152 of SOLEN ENERGY CONSTRUCTION CORPORATION’s installs the utility recorded a third-party ownership type: PPA 129, lease 4, prepaid lease 1, other 18. No residential system in the file lists a third-party owner name that matches SOLEN ENERGY CONSTRUCTION CORPORATION exactly.

Third-party owner named on its installsInstalls
Palmetto Solar LLC DBA LightReach73
Goodleap41
Lightreach33
Fnu Ibad Ur Rehman1
HDM1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 230 of SOLEN ENERGY CONSTRUCTION CORPORATION’s 230 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (55, 23.9%) used modules recorded as JinkoSolar.

In the last 24 months, 230 of SOLEN ENERGY CONSTRUCTION CORPORATION’s 230 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (181, 78.7%) used inverters recorded as Tesla.

In the last 24 months, 215 of SOLEN ENERGY CONSTRUCTION CORPORATION’s 230 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (184, 85.6%) used batteries recorded as Tesla.

217 of 217 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerJinkoSolar5555
Qcells4444
Silfab3232
Hyundai3131
REC1616
Inverter makerTesla181181
Enphase2730
SolarEdge2525
Battery makerTesla184184
Enphase1921
SolarEdge1313

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 233 of 233 installs, inverters on 233. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names SOLEN ENERGY CONSTRUCTION CORPORATION as developer on 1 battery storage project and as installer on 1 (1 name it as both), 1 projects in all with 13 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Apr 1, 2025 to Apr 1, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled113$1,980

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage113$1,9800$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1111581SOLEN ENERGY UPGRADE CONSTRUCTION (Corporation)CLEARB General Building ContractorOct 19, 2023Oct 31, 2027233

License numbers are the ones the utilities recorded on the interconnection applications (233 of 233 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1111581. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Los Angeles106
San Bernardino49
Orange38
Riverside38
San Diego1
Ventura1

Top cities

CityInstalls
Eastvale14
Chino Hills12
Diamond Bar10
Irvine10
Hacienda Heights9
Rowland Heights8
Corona7
Walnut7
Alhambra6
Ontario6
Yorba Linda6
Fontana5
Jurupa Valley5
Rancho Cucamonga5
Alta Loma4

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SOLEN ENERGY CONSTRUCTION CORPORATION232
Solen Energy Construction Corporation1

Common questions

Where does SOLEN ENERGY CONSTRUCTION CORPORATION install solar?

Its installs are spread across 6 counties. The most are in Los Angeles County (106 installs), followed by San Bernardino County (49).

How often does SOLEN ENERGY CONSTRUCTION CORPORATION install batteries with solar?

93.5% of its interconnected solar installs include battery storage across all years, and 93.9% in the last 24 months (215 of 229). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many SOLEN ENERGY CONSTRUCTION CORPORATION installs are under NEM 3.0 (the Net Billing Tariff)?

231 of its 233 interconnected installs (99.1% of the 233 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 93.5% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.