Solar installers in Alta Loma, California

Most installs here are in San Bernardino County.

Who installs the most solar in Alta Loma?

Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Alta Loma are Sunrun (91), Tesla Energy Operations (formerly SolarCity) (47) and FREEDOM FOREVER LLC (20). They account for 158 of the 421 residential solar installs interconnected there in that window.

In all, 3,765 homes in Alta Loma have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installers ranked by interconnected installs, last 24 months

Sep 2024 through Aug 2026. Top 25 of 96 installers with installs in this window. 12 installs in the window were self-installed or had no installer recorded.

1Sunrun91354
2Tesla Energy Operations (formerly SolarCity)47408
3FREEDOM FOREVER LLC20102
4BRIGHT OPS1926
5V3 Electric1652
6LUXOR ENERGY INC1415
7SARRAZIN ENTERPRISE INC DBA ROOMS COVERS N SOLAR933
8T & G ROOFING AND SOLAR ELECTRIC COMPANY942
9Current Home833
10FREEDOM FOREVER SOUTHERN CALIFORNIA LLC88
11ORANGE COUNTY CONTRACTING SERVICES710
12Empower Electric Solar67
13Option One Solar617
14Solar Optimum Inc.623
15SolarGem Electrical636
16Aveyo55
17Semper Solaris Construction Inc565
18SolarMax Renewable Energy Provider, Inc599
19AXIA SOLAR CORP44
20KIN HOME ELECTRIC LLC44
21LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC415
22Powur PBC (Powur Home)439
23SOLEN ENERGY CONSTRUCTION CORPORATION44
24SUNLUX432
25A P ELECTRICAL311

Most installs, all time

1Tesla Energy Operations (formerly SolarCity)408408
2Sunrun354354
3Bright Planet Solar152152
4FREEDOM FOREVER LLC102102
5Vivint Solar Developer, LLC101101
6SolarMax Renewable Energy Provider, Inc9999
7Horizon Solar Power8989
8SunPower8282
9Semper Solaris Construction Inc6565
10V3 Electric5252

Installs by year

YearInstalls interconnectedWith battery storage
202242955
202355272
2024228146
2025227213
2026 (through Aug 31, 2026)134127

Under the Net Billing Tariff (NEM 3.0)

535 of the 3,765 residential solar installs in Alta Loma (14.2% of the 3,765 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 86.7% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Installers ranked by Net Billing Tariff installs in Alta Loma

1Sunrun11811799.2%
2Tesla Energy Operations (formerly SolarCity)484185.4%
3FREEDOM FOREVER LLC272696.3%
4BRIGHT OPS262388.5%
5Bright Planet Solar25520.0%
6V3 Electric1717100.0%
7LUXOR ENERGY INC151280.0%
8LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC13646.2%
9T & G ROOFING AND SOLAR ELECTRIC COMPANY1111100.0%
10Current Home99100.0%
11FREEDOM FOREVER SOUTHERN CALIFORNIA LLC88100.0%
12Solar Optimum Inc.88100.0%
13ORANGE COUNTY CONTRACTING SERVICES77100.0%
14SARRAZIN ENTERPRISE INC DBA ROOMS COVERS N SOLAR7685.7%
15Semper Solaris Construction Inc7685.7%

Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.

Equipment recorded

In the last 24 months, 420 of Alta Loma’s 421 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (149, 35.5%) used modules recorded as Qcells.

In the last 24 months, 421 of Alta Loma’s 421 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (202, 48.0%) used inverters recorded as Tesla.

In the last 24 months, 382 of Alta Loma’s 421 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (253, 66.2%) used batteries recorded as Tesla.

692 of 717 battery-paired PG&E and SCE installs (96.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells149733
LONGi73256
JA Solar38135
REC27165
Canadian Solar20197
Inverter makerTesla202270
Enphase1011,216
SolarEdge1011,184
ABB7233
Qcells7not in top list
Battery makerTesla253396
Enphase54112
SolarEdge4975
FranklinWH1015
PointGuard Energy Inc.44

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 2,915 of 3,765 installs, inverters on 3,764. See the methodology and the equipment index.

ZIP codes in Alta Loma

ZIP codes with their own page where the utilities recorded Alta Loma on at least 10% of the ZIP’s installs, through Aug 31, 2026.

917012,3212,719329
917371,4431,897211

SGIP battery storage projects in Alta Loma

The SGIP report lists 68 battery storage projects with the city Alta Loma, 42 with the status Paid ($371,707 in current incentive allocations, 746 kWh).

Status as publishedProjectsStorage kWhCurrent incentive
Paid42746$371,707
Reserved449$32,780
Waitlist228$71,989
Cancelled174,404$81,274
RRF Rejected329$5,104

Installers named on the most SGIP storage projects in Alta Loma

InstallerProjectsPaid
LA Solar Group108
CALIFORNIA ENERGY SAVERS64
Semper Solaris Construction Inc53
SolarMax Renewable Energy Provider, Inc53
GAMBERO ELECTRICAL33
PetersenDean32
Solar Optimum Inc.31
SunPower33
Tesla32
V3 Electric31

3 of the 68 projects name no installer with a page in this index, so they are counted above but not in this list.

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

All SGIP battery projects, and SGIP battery incentive money by county.

At a glance

Residential solar installs
3,765
Last 24 months
421
Capacity
30.1 MW DC
Median system size
7.4 kW DC
With battery storage
19.0% all time; 93.3% last 24 months
Third-party owned
37.8% where reported
Ownership types recorded
PPA 884, lease 345, prepaid lease 5, other 70
Median battery size
13.5 kWh
Earliest install in data
Oct 18, 2001

Common questions

How many homes in Alta Loma have solar?

3,765 residential solar systems in Alta Loma were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 421 of them in the last 24 months. Homes on municipal utilities are not included.

How many solar installers work in Alta Loma?

96 installer names have at least one install interconnected in Alta Loma in the last 24 months, and 523 appear in the full record.

How common are batteries with new solar in Alta Loma?

19.0% of the solar installs interconnected in Alta Loma include battery storage across all years, and 93.3% in the last 24 months (393 of 421).

How many solar installs in Alta Loma are under NEM 3.0?

535 of the 3,765 residential solar installs in Alta Loma (14.2% of the 3,765 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 86.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.