SolarGem Electrical

How many solar installs has SolarGem Electrical done in California, and which license number is on its installs?

SolarGem Electrical has 410 residential solar installs interconnected in California, active in the records from 2014 through 2026 (May 13, 2014 to Aug 19, 2026), most of them in San Bernardino County (201), Los Angeles County (92) and Riverside County (67). CSLB lists license 929565 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Mar 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
410
Last 24 months
56
Total capacity
3,503.4 kW DC
Median system size
8 kW DC
With battery storage
18.8% all time; 67.9% last 24 months
Third-party owned
0.3% of 382 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
75 installs, latest Aug 13, 2026
Ownership types recorded
PPA 1
Median battery size
15 kWh (77 installs list a capacity)
First install
May 13, 2014
Latest install
Aug 19, 2026
Counties
4
Utilities
SCE 410
CSLB license
929565

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
2014140
2015390
2016280
2017290
2018330
2019272
2020253
2021417
2022476
20235710
20242420
20253426
2026 (through Aug 31, 2026)123

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

75 of its 410 interconnected installs (18.3% of the 410 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 69.3% of those include battery storage. The latest Net Billing Tariff install was approved Aug 13, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.010124.6%not counted
NEM 2.023457.1%25 (10.7%)
Net Billing Tariff7518.3%52 (69.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of SolarGem Electrical’s installs the utility recorded a third-party ownership type: PPA 1, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches SolarGem Electrical exactly.

Third-party owner named on its installsInstalls
SolarCity1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 55 of SolarGem Electrical’s 56 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (25, 45.5%) used modules recorded as United Renewable Energy.

In the last 24 months, 56 of SolarGem Electrical’s 56 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (31, 55.4%) used inverters recorded as Enphase.

In the last 24 months, 37 of SolarGem Electrical’s 56 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (20, 54.1%) used batteries recorded as Generac.

69 of 77 battery-paired PG&E and SCE installs (89.6%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerUnited Renewable Energy2525
Aptos Solar19not in top list
Canadian Solar5105
Qcells2not in top list
Fox ESS1not in top list
Inverter makerEnphase31154
Generac2238
Foxess1not in top list
Hoymiles1not in top list
SolarEdge1172
Battery makerGenerac2051
FranklinWH1515
Enphase11
Tesla1not in top list

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 374 of 410 installs, inverters on 410. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names SolarGem Electrical as developer on 20 battery storage projects and as installer on 20 (20 name it as both), 20 projects in all with 340 kWh of storage. 13 have the status Paid, with $130,032 in current incentive allocations. Applications were received from Nov 17, 2017 to Nov 14, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid13222$130,032
Cancelled449$23,529
RRF Rejected369$8,009

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency8138$122,9387$107,938
Small Residential Storage767$15,6644$7,135
Large-Scale Storage266$14,9592$14,959
Not stated369$8,0090$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
929565Sole owner license (name not shown)CLEARC-10 Electrical ContractorMar 5, 2009Mar 31, 2027406

License numbers are the ones the utilities recorded on the interconnection applications (407 of 410 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 929565. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list SolarGem Electrical’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2019Total
unincorporated San Diego County92956511

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Bernardino201
Los Angeles92
Riverside67
Orange50

Top cities

CityInstalls
Alta Loma36
Rancho Cucamonga32
Upland30
Fontana24
Glendora15
Claremont14
Redlands13
Riverside12
San Bernardino12
Santa Ana12
Ontario9
Corona8
Fullerton8
Hemet8
La Verne8

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SOLARGEM ELECTRICAL304
SolarGem Electrical106

Common questions

Where does SolarGem Electrical install solar?

Its installs are spread across 4 counties. The most are in San Bernardino County (201 installs), followed by Los Angeles County (92).

How often does SolarGem Electrical install batteries with solar?

18.8% of its interconnected solar installs include battery storage across all years, and 67.9% in the last 24 months (38 of 56).

How many SolarGem Electrical installs are under NEM 3.0 (the Net Billing Tariff)?

75 of its 410 interconnected installs (18.3% of the 410 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 69.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.