Solar installers in Redlands, California
Most installs here are in San Bernardino County.
Who installs the most solar in Redlands?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Redlands are Sunrun (180), SOLARA HOME ENERGY LLC (83) and Tesla Energy Operations (formerly SolarCity) (58). They account for 321 of the 898 residential solar installs interconnected there in that window.
In all, 5,952 homes in Redlands have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 137 installers with installs in this window. 18 installs in the window were self-installed or had no installer recorded.
Most installs, all time
| 1 | Sunrun | 598 | 598 |
| 2 | Tesla Energy Operations (formerly SolarCity) | 404 | 404 |
| 3 | SunPower | 377 | 377 |
| 4 | SUNPOWER BY SEA BRIGHT SOLAR | 312 | 312 |
| 5 | Vivint Solar Developer, LLC | 264 | 264 |
| 6 | SUNNOVA ENERGY CORPORATION | 206 | 206 |
| 7 | Horizon Solar Power | 197 | 197 |
| 8 | SolarMax Renewable Energy Provider, Inc | 179 | 179 |
| 9 | SunStreet Energy Group LLC | 146 | 146 |
| 10 | FREEDOM FOREVER LLC | 116 | 116 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 761 | 115 |
| 2023 | 793 | 152 |
| 2024 | 420 | 249 |
| 2025 | 448 | 298 |
| 2026 (through Aug 31, 2026) | 319 | 234 |
Under the Net Billing Tariff (NEM 3.0)
1,143 of the 5,952 residential solar installs in Redlands (19.2% of the 5,952 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 67.2% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Redlands
| 1 | Sunrun | 218 | 216 | 99.1% |
| 2 | SunPower | 104 | 6 | 5.8% |
| 3 | SOLARA HOME ENERGY LLC | 83 | 0 | 0.0% |
| 4 | V3 Electric | 68 | 67 | 98.5% |
| 5 | Tesla Energy Operations (formerly SolarCity) | 62 | 57 | 91.9% |
| 6 | MARS BUILDER SOLUTIONS | 51 | 0 | 0.0% |
| 7 | BRIGHT OPS | 35 | 35 | 100.0% |
| 8 | BURGESONS HEATING AND AIR CONDITIONING INC | 35 | 32 | 91.4% |
| 9 | FREEDOM FOREVER LLC | 30 | 29 | 96.7% |
| 10 | SUNPOWER BY SEA BRIGHT SOLAR | 30 | 26 | 86.7% |
| 11 | CALIFORNIA PREMIER SOLAR CONSTRUCTION | 23 | 0 | 0.0% |
| 12 | Current Home | 20 | 20 | 100.0% |
| 13 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 18 | 17 | 94.4% |
| 14 | SolarMax Renewable Energy Provider, Inc | 17 | 16 | 94.1% |
| 15 | Bright Planet Solar | 16 | 7 | 43.8% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Equipment recorded
In the last 24 months, 894 of Redlands’ 898 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (366, 40.9%) used modules recorded as Qcells.
In the last 24 months, 898 of Redlands’ 898 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (471, 52.4%) used inverters recorded as Enphase.
In the last 24 months, 615 of Redlands’ 898 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (375, 61.0%) used batteries recorded as Tesla.
1,120 of 1,186 battery-paired PG&E and SCE installs (94.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 366 | 1,380 |
| Canadian Solar | 127 | 389 | |
| JA Solar | 84 | 220 | |
| LONGi | 80 | 321 | |
| Silfab | 42 | not in top list | |
| Inverter maker | Enphase | 471 | 2,447 |
| Tesla | 300 | 392 | |
| SolarEdge | 125 | 1,686 | |
| SMA | 14 | 320 | |
| Qcells | 11 | not in top list | |
| Battery maker | Tesla | 375 | 574 |
| Enphase | 146 | 235 | |
| SolarEdge | 62 | 118 | |
| FranklinWH | 17 | 25 | |
| LG | 6 | 126 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 4,833 of 5,952 installs, inverters on 5,950. See the methodology and the equipment index.
ZIP codes in Redlands
ZIP codes with their own page where the utilities recorded Redlands on at least 10% of the ZIP’s installs, through Aug 31, 2026.
SGIP battery storage projects in Redlands
The SGIP report lists 253 battery storage projects with the city Redlands, 146 with the status Paid ($1,439,631 in current incentive allocations, 3,061 kWh).
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 146 | 3,061 | $1,439,631 |
| PBI in Process | 1 | 403 | $69,101 |
| Reserved | 18 | 260 | $292,430 |
| Waitlist | 10 | 147 | $175,775 |
| Cancelled | 71 | 11,860 | $5,267,186 |
| RRF Rejected | 7 | 5,068 | $747,458 |
Installers named on the most SGIP storage projects in Redlands
20 of the 253 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
SolarAPP+ automated permitting
Redlands is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, with the note “Open Pilot”. The list gives no start date.
Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.
At a glance
- Residential solar installs
- 5,952
- Last 24 months
- 898
- Capacity
- 43.7 MW DC
- Median system size
- 6.6 kW DC
- With battery storage
- 19.9% all time; 70.3% last 24 months
- Third-party owned
- 37.9% where reported
- Ownership types recorded
- PPA 1,595, lease 389, prepaid lease 8, other 100
- Median battery size
- 13.5 kWh
- Earliest install in data
- Oct 4, 2002
Common questions
How many homes in Redlands have solar?
5,952 residential solar systems in Redlands were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 898 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Redlands?
137 installer names have at least one install interconnected in Redlands in the last 24 months, and 584 appear in the full record.
How common are batteries with new solar in Redlands?
19.9% of the solar installs interconnected in Redlands include battery storage across all years, and 70.3% in the last 24 months (631 of 898).
How many solar installs in Redlands are under NEM 3.0?
1,143 of the 5,952 residential solar installs in Redlands (19.2% of the 5,952 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 67.2% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.