Blalock electric

How many solar installs has Blalock electric done in California, and which license number is on its installs?

Blalock electric has 3,722 residential solar installs interconnected in California, active in the records from 2013 through 2026 (Oct 15, 2013 to Aug 31, 2026), most of them in San Diego County (1,971), Riverside County (871) and Orange County (391). CSLB lists license 915397 (BLALOCK ELECTRIC SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-39, expires Apr 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
3,722
Last 24 months
438
Total capacity
27,322.6 kW DC
Median system size
6.5 kW DC
With battery storage
18.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 88.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
8.8% of 3,705 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
563 installs, latest Aug 31, 2026
Ownership types recorded
PPA 220, lease 77, prepaid lease 26, other 4
Median battery size
13.5 kWh (298 installs list a capacity)
First install
Oct 15, 2013
Latest install
Aug 31, 2026
Counties
7
Utilities
SDGE 2,071, SCE 1,651
CSLB license
915397

Is Blalock electric still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (207 in all).

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2013 to 2026

YearInstalls interconnectedWith battery storage
201320
2014100
2015110
2016100
201790
2018880
20192021
20202920
20216049
202279820
20231,02213
202430978
2025244112
2026 (through Aug 31, 2026)12165

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

563 of its 3,722 interconnected installs (15.1% of the 3,722 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 86.1% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0401.1%not counted
NEM 2.03,11983.8%45 (3.4%)
Net Billing Tariff56315.1%253 (86.1%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 327 of Blalock electric’s installs the utility recorded a third-party ownership type: PPA 220, lease 77, prepaid lease 26, other 4. Across all installers, 87 residential systems list a third-party owner name that matches Blalock electric exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Sunnova191
BLALOCK ELECTRIC SOLAR84
Blalock28
Sunnova Energy9
Nick Blalock4

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 427 of Blalock electric’s 438 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (123, 28.8%) used modules recorded as Panasonic.

In the last 24 months, 438 of Blalock electric’s 438 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (260, 59.4%) used inverters recorded as Tesla.

In the last 24 months, 200 of Blalock electric’s 438 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (149, 74.5%) used batteries recorded as Tesla.

283 of 298 battery-paired PG&E and SCE installs (95.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerPanasonic123906
Qcells116864
HDHYUNDAIENERGYSOLUTIONSCO.,LTD.44not in top list
JinkoSolar4351
LONGi29151
Inverter makerTesla260317
Enphase1462,411
SolarEdge26729
Panasonic11not in top list
Qcells5not in top list
Battery makerTesla149150
Enphase30104
SolarEdge1717
Panasonic47

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 3,531 of 3,722 installs, inverters on 3,722. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Blalock electric as developer on 0 battery storage projects and as installer on 2 (0 name it as both), 2 projects in all with 17 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Apr 13, 2021 to Jul 8, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled217$6,679

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Residential Solar and Storage Equity - AB 20919$5,0000$0
Small Residential Storage18$1,6790$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
915397BLALOCK ELECTRIC SOLAR (Corporation)CLEARC-10 Electrical Contractor; C-39 Roofing ContractorMay 8, 2008Apr 30, 20273,719

License numbers are the ones the utilities recorded on the interconnection applications (3,720 of 3,722 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 915397. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Blalock electric’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
unincorporated San Diego County9153972960706710197331812487

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Diego1,971
Riverside871
Orange391
San Bernardino256
Los Angeles223
Kern5
Ventura5

Top cities

CityInstalls
San Diego745
El Cajon184
Murrieta179
Temecula168
Oceanside144
Fallbrook107
Chula Vista78
Escondido72
Menifee71
Corona64
Vista61
Hemet60
San Marcos56
Carlsbad54
La Mesa52

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Blalock electric2,038
BLALOCK ELECTRIC SOLAR1,612
Blalock Electric55
BLALOCK ELECTRIC17

Common questions

Where does Blalock electric install solar?

Its installs are spread across 7 counties. The most are in San Diego County (1,971 installs), followed by Riverside County (871).

How often does Blalock electric install batteries with solar?

18.0% of its interconnected solar installs include battery storage across all years, and 88.0% in the last 24 months (206 of 234). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Blalock electric installs are under NEM 3.0 (the Net Billing Tariff)?

563 of its 3,722 interconnected installs (15.1% of the 3,722 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 86.1% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.