How many solar installs has BLALOCK ELECTRIC & SOLAR INC done in California, and which license number is on its installs?

BLALOCK ELECTRIC & SOLAR INC has 432 residential solar installs interconnected in California, active in the records from 2017 through 2023 (Jul 20, 2017 to Aug 13, 2023), most of them in Riverside County (254), San Bernardino County (86) and Orange County (46). CSLB lists license 915397 (BLALOCK ELECTRIC SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-39, expires Apr 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
432
Last 24 months
0
Total capacity
3,555.6 kW DC
Median system size
7.8 kW DC
With battery storage
1.6% all time; no installs in the last 24 months last 24 months
Third-party owned
7.4% of 432 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 17, lease 15
Median battery size
9.8 kWh (7 installs list a capacity)
First install
Jul 20, 2017
Latest install
Aug 13, 2023
Counties
6
Utilities
SCE 432
CSLB license
915397

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2017 to 2026

YearInstalls interconnectedWith battery storage
2017130
2018740
20191433
20201824
202130
202200
2023170
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 432 interconnected installs with a tariff recorded (432) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.0432100.0%7 (1.6%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 32 of BLALOCK ELECTRIC & SOLAR INC’s installs the utility recorded a third-party ownership type: PPA 17, lease 15, prepaid lease 0, other 0. Across all installers, 1 residential systems list a third-party owner name that matches BLALOCK ELECTRIC & SOLAR INC exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Sunnova28
Blalock Electric3
BLALOCK ELECTRIC & SOLAR INC1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 432 of BLALOCK ELECTRIC & SOLAR INC’s 432 installs name a module maker in the “Generator Manufacturer” fields, and most of those (307, 71.1%) used modules recorded as LG.

Across all years, 432 of BLALOCK ELECTRIC & SOLAR INC’s 432 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (228, 52.8%) used inverters recorded as Enphase.

Across all years, 7 of BLALOCK ELECTRIC & SOLAR INC’s 432 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (7, 100.0%) used batteries recorded as LG.

7 of 7 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLG0307
Qcells055
LONGi025
Panasonic018
SolarWorld016
Inverter makerEnphase0228
SolarEdge0196
SMA05
APsystems (Altenergy Power System)01
SunPower01
Battery makerLG07

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 432 of 432 installs, inverters on 432. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names BLALOCK ELECTRIC & SOLAR INC as developer on 52 battery storage projects and as installer on 52 (50 name it as both), 54 projects in all with 893 kWh of storage. 38 have the status Paid, with $363,276 in current incentive allocations. Applications were received from Feb 6, 2020 to Sep 22, 2026.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid38657$363,276
Reserved236$5,129
Waitlist135$64,500
Cancelled13165$63,950

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage29330$55,85218$34,863
Equity Resiliency17341$321,96815$286,158
Large-Scale Storage5165$40,0864$32,806
Residential Solar and Storage Equity - AB 20919$5,0000$0
Residential Solar and Storage Equity - AB 209 Non-POU135$64,5000$0
Residential Storage Equity113$9,4501$9,450

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
915397BLALOCK ELECTRIC SOLAR (Corporation)CLEARC-10 Electrical Contractor; C-39 Roofing ContractorMay 8, 2008Apr 30, 2027432

License numbers are the ones the utilities recorded on the interconnection applications (432 of 432 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 915397. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list BLALOCK ELECTRIC & SOLAR INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
unincorporated San Diego County9153972960706710197331812487

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Riverside254
San Bernardino86
Orange46
Los Angeles43
Ventura2
Kern1

Top cities

CityInstalls
Murrieta53
Temecula39
Menifee27
Corona15
Hemet15
Sun City14
Victorville14
Wildomar11
Hesperia10
Lake Elsinore10
Winchester10
Moreno Valley9
Fontana8
Chino Hills7
San Bernardino7

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
BLALOCK ELECTRIC & SOLAR INC430
Blalock Electric & Solar Inc1
Blalock Electric & Solar, Inc.1

Common questions

Where does BLALOCK ELECTRIC & SOLAR INC install solar?

Its installs are spread across 6 counties. The most are in Riverside County (254 installs), followed by San Bernardino County (86).

How often does BLALOCK ELECTRIC & SOLAR INC install batteries with solar?

1.6% of its interconnected solar installs include battery storage across all years.

How many BLALOCK ELECTRIC & SOLAR INC installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 432 interconnected installs with a tariff recorded (432) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.