Solar installers in Wildomar, California
Most installs here are in Riverside County.
Who installs the most solar in Wildomar?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Wildomar are Sunrun (284), SUNNOVA ENERGY CORPORATION (41) and SunPower (35). They account for 360 of the 664 residential solar installs interconnected there in that window.
In all, 4,294 homes in Wildomar have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 87 installers with installs in this window. 8 installs in the window were self-installed or had no installer recorded.
Most installs, all time
| 1 | Sunrun | 605 | 605 |
| 2 | SunPower | 450 | 450 |
| 3 | Tesla Energy Operations (formerly SolarCity) | 257 | 257 |
| 4 | Solcius | 183 | 183 |
| 5 | Vivint Solar Developer, LLC | 155 | 155 |
| 6 | SUNNOVA ENERGY CORPORATION | 130 | 130 |
| 7 | Horizon Solar Power | 117 | 117 |
| 8 | FREEDOM FOREVER LLC | 112 | 112 |
| 9 | Precis Solar | 104 | 104 |
| 10 | Sunpro Solar | 103 | 103 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 566 | 63 |
| 2023 | 503 | 53 |
| 2024 | 542 | 231 |
| 2025 | 330 | 223 |
| 2026 (through Aug 31, 2026) | 179 | 143 |
Under the Net Billing Tariff (NEM 3.0)
784 of the 4,294 residential solar installs in Wildomar (18.3% of the 4,294 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 74.2% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Wildomar
| 1 | Sunrun | 269 | 169 | 62.8% |
| 2 | SUNNOVA ENERGY CORPORATION | 101 | 89 | 88.1% |
| 3 | BRIGHT OPS | 39 | 38 | 97.4% |
| 4 | Current Home | 28 | 28 | 100.0% |
| 5 | Tesla Energy Operations (formerly SolarCity) | 27 | 24 | 88.9% |
| 6 | SunPower | 26 | 5 | 19.2% |
| 7 | LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC | 22 | 21 | 95.5% |
| 8 | EXO Energy | 21 | 9 | 42.9% |
| 9 | FREEDOM FOREVER LLC | 18 | 16 | 88.9% |
| 10 | Bright Planet Solar | 14 | 2 | 14.3% |
| 11 | Blalock electric | 12 | 11 | 91.7% |
| 12 | V3 Electric | 12 | 11 | 91.7% |
| 13 | Complete Solar | 11 | 6 | 54.5% |
| 14 | MY SMART HOUSE LLC | 11 | 11 | 100.0% |
| 15 | Empower Electric Solar | 10 | 10 | 100.0% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Equipment recorded
In the last 24 months, 662 of Wildomar’s 664 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (327, 49.4%) used modules recorded as Qcells.
In the last 24 months, 664 of Wildomar’s 664 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (321, 48.3%) used inverters recorded as Enphase.
In the last 24 months, 429 of Wildomar’s 664 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (262, 61.1%) used batteries recorded as Tesla.
745 of 781 battery-paired PG&E and SCE installs (95.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 327 | 1,074 |
| JA Solar | 111 | 237 | |
| LONGi | 78 | 312 | |
| Trina Solar | 31 | not in top list | |
| Silfab | 30 | not in top list | |
| Inverter maker | Enphase | 321 | 1,589 |
| Tesla | 224 | 299 | |
| SolarEdge | 150 | 1,383 | |
| SunPower | 13 | 437 | |
| Delta Electronics | 11 | 78 | |
| Battery maker | Tesla | 262 | 367 |
| Enphase | 63 | 105 | |
| FranklinWH | 58 | 109 | |
| SolarEdge | 37 | 58 | |
| LG | 4 | 85 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 3,589 of 4,294 installs, inverters on 4,294. See the methodology and the equipment index.
ZIP codes in Wildomar
ZIP codes with their own page where the utilities recorded Wildomar on at least 10% of the ZIP’s installs, through Aug 31, 2026.
| 92595 | 4,167 | 4,185 | 569 |
SGIP battery storage projects in Wildomar
The SGIP report lists 161 battery storage projects with the city Wildomar, 76 with the status Paid ($1,044,230 in current incentive allocations, 1,383 kWh).
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 76 | 1,383 | $1,044,230 |
| Reserved | 14 | 221 | $222,856 |
| Pending Reservation | 4 | 56 | $76,282 |
| Waitlist | 8 | 116 | $149,505 |
| Cancelled | 58 | 1,247 | $1,421,017 |
| RRF Rejected | 1 | 9 | $1,354 |
Installers named on the most SGIP storage projects in Wildomar
| Installer | Projects | Paid |
|---|---|---|
| Sunrun | 40 | 16 |
| APOLLO HOME POWER LLC | 17 | 7 |
| Semper Solaris Construction Inc | 12 | 9 |
| SolarMax Renewable Energy Provider, Inc | 11 | 7 |
| HAVEN ENERGY SERVICES INC | 10 | 6 |
| Solar Pros Inc. | 10 | 0 |
| SunPower | 6 | 2 |
| Infinity Energy, Inc | 4 | 3 |
| Sunpro Solar | 4 | 3 |
| EXO Energy | 3 | 1 |
9 of the 161 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
At a glance
- Residential solar installs
- 4,294
- Last 24 months
- 664
- Capacity
- 29.8 MW DC
- Median system size
- 6.3 kW DC
- With battery storage
- 18.2% all time; 66.4% last 24 months
- Third-party owned
- 47.4% where reported
- Ownership types recorded
- PPA 1,362, lease 389, prepaid lease 2, other 144
- Median battery size
- 13.5 kWh
- Earliest install in data
- Dec 19, 2001
Common questions
How many homes in Wildomar have solar?
4,294 residential solar systems in Wildomar were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 664 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Wildomar?
87 installer names have at least one install interconnected in Wildomar in the last 24 months, and 393 appear in the full record.
How common are batteries with new solar in Wildomar?
18.2% of the solar installs interconnected in Wildomar include battery storage across all years, and 66.4% in the last 24 months (441 of 664).
How many solar installs in Wildomar are under NEM 3.0?
784 of the 4,294 residential solar installs in Wildomar (18.3% of the 4,294 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 74.2% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.