MY SMART HOUSE LLC

How many solar installs has MY SMART HOUSE LLC done in California, and which license number is on its installs?

MY SMART HOUSE LLC has 420 residential solar installs interconnected in California, active in the records from 2024 through 2026 (Aug 6, 2024 to Feb 16, 2026), most of them in Riverside County (276), San Diego County (61) and San Bernardino County (51). The license number recorded on most of its installs, 1095569, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
420
Last 24 months
407
Total capacity
3,137 kW DC
Median system size
6.6 kW DC
With battery storage
98.3% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 98.2% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.2% of 420 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
420 installs, latest Feb 16, 2026
Ownership types recorded
PPA 1
Median battery size
10 kWh (344 installs list a capacity)
First install
Aug 6, 2024
Latest install
Feb 16, 2026
Counties
5
Utilities
SCE 350, SDGE 70
CSLB license
1095569

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2024 to 2026

YearInstalls interconnectedWith battery storage
20248069
2025335270
2026 (through Aug 31, 2026)55

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

420 of its 420 interconnected installs (100.0% of the 420 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 98.3% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Feb 16, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.000.0%0
Net Billing Tariff420100.0%344 (98.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 1 of MY SMART HOUSE LLC’s installs the utility recorded a third-party ownership type: PPA 1, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches MY SMART HOUSE LLC exactly.

Third-party owner named on its installsInstalls
JOSE BAHENA1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 375 of MY SMART HOUSE LLC’s 407 installs name a module maker in the “Generator Manufacturer” fields, and most of those (238, 63.5%) used modules recorded as Aptos Solar.

In the last 24 months, 407 of MY SMART HOUSE LLC’s 407 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (362, 88.9%) used inverters recorded as Enphase.

In the last 24 months, 300 of MY SMART HOUSE LLC’s 407 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (298, 99.3%) used batteries recorded as Enphase.

311 of 344 battery-paired PG&E and SCE installs (90.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerAptos Solar238239
JinkoSolar9396
Elin Energy4343
EG43333
Qcells2230
Inverter makerEnphase362375
SolarEdge5757
EG44141
SMA1213
Aptos Solar77
Battery makerEnphase298308
EG411
SolarEdge11
SunPower11
Tesla1not in top list

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 387 of 420 installs, inverters on 420. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1095569Not found in the CSLB License Master file pulled Nov 4, 2026419

License numbers are the ones the utilities recorded on the interconnection applications (420 of 420 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list MY SMART HOUSE LLC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20242025Total
unincorporated San Diego County109556995261

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Riverside276
San Diego61
San Bernardino51
Orange25
Los Angeles7

Top cities

CityInstalls
Hemet35
Murrieta33
Perris31
Lake Elsinore22
Moreno Valley21
Temecula20
Corona17
Riverside17
Menifee15
San Bernardino14
San Jacinto14
Escondido13
San Diego11
Wildomar11
Ontario9

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
MY SMART HOUSE LLC420

Common questions

Where does MY SMART HOUSE LLC install solar?

Its installs are spread across 5 counties. The most are in Riverside County (276 installs), followed by San Diego County (61).

How often does MY SMART HOUSE LLC install batteries with solar?

98.3% of its interconnected solar installs include battery storage across all years, and 98.2% in the last 24 months (333 of 339). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many MY SMART HOUSE LLC installs are under NEM 3.0 (the Net Billing Tariff)?

420 of its 420 interconnected installs (100.0% of the 420 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 98.3% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.