Sunpro Solar

How many solar installs has Sunpro Solar done in California, and which license number is on its installs?

Sunpro Solar has 1,839 residential solar installs interconnected in California, active in the records from 2009 through 2024 (Oct 20, 2009 to Sep 19, 2024), most of them in Riverside County (888), San Diego County (569) and Orange County (214). The license number recorded on most of its installs, 830451, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
1,839
Last 24 months
2
Total capacity
12,975.3 kW DC
Median system size
6.3 kW DC
With battery storage
3.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
24.8% of 1,615 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
30 installs, latest Sep 19, 2024
Ownership types recorded
PPA 82, lease 306, other 13
Median battery size
14.4 kWh (36 installs list a capacity)
First install
Oct 20, 2009
Latest install
Sep 19, 2024
Counties
12
Utilities
SCE 1,166, SDGE 649, PGE 24
CSLB license
830451, 1080382

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2009 to 2026

YearInstalls interconnectedWith battery storage
200930
2010190
2011410
20121350
20131890
20141810
20151760
20161200
2017790
20181000
20191290
20208811
20218624
20222351
20232290
2024290
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

30 of its 1,839 interconnected installs (1.6% of the 1,839 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Sep 19, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.089648.7%not counted
NEM 2.091349.6%34 (9.7%)
Net Billing Tariff301.6%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 401 of Sunpro Solar’s installs the utility recorded a third-party ownership type: PPA 82, lease 306, prepaid lease 0, other 13. Across all installers, 4 residential systems list a third-party owner name that matches Sunpro Solar exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
SunPower SolarProgram I, LLC105
SunPower Corporation, Systems91
SunPower Capital, LLC88
Sunrun44
Kilowatt Systems, LLC29

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 2 of Sunpro Solar’s 2 installs name a module maker in the “Generator Manufacturer” fields, and most of those (2, 100.0%) used modules recorded as Qcells.

In the last 24 months, 2 of Sunpro Solar’s 2 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (2, 100.0%) used inverters recorded as Enphase.

In the last 24 months, none of Sunpro Solar’s 2 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

4 of 36 battery-paired PG&E and SCE installs (11.1%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells240
Inverter makerEnphase2618
Battery makerEnphase02
Battery01
Tesla01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 1,186 of 1,839 installs, inverters on 1,830. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Sunpro Solar as developer on 99 battery storage projects and as installer on 314 (95 name it as both), 318 projects in all with 4,448 kWh of storage. 120 have the status Paid, with $849,150 in current incentive allocations. Applications were received from Dec 12, 2017 to Feb 28, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid1201,885$849,150
Pending Reservation349$7,280
Cancelled1131,601$517,272
RRF Rejected82913$135,676

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage1992,383$423,22994$217,267
Equity Resiliency29890$885,70123$608,182
Large-Scale Storage8262$64,7723$23,701
Not stated82913$135,6760$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
830451Not found in the CSLB License Master file pulled Nov 4, 20261,280
1080382Not found in the CSLB License Master file pulled Nov 4, 2026500

License numbers are the ones the utilities recorded on the interconnection applications (1,783 of 1,839 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list Sunpro Solar’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2018201920202021Total
unincorporated San Diego County8304519103426

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Riverside888
San Diego569
Orange214
San Bernardino93
Los Angeles50
Fresno11
Merced4
Kern3
Madera3
Kings2
San Luis Obispo1
Tulare1

Top cities

CityInstalls
Murrieta220
San Diego169
Temecula132
Wildomar103
Menifee78
Corona76
Chula Vista52
Oceanside43
Lake Elsinore41
Escondido40
Hemet40
Fallbrook32
Canyon Lake30
Carlsbad27
San Marcos27

Names as recorded by the utilities

The utilities recorded this installer under 7 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Sunpro Solar685
SUNPRO SOLAR INC463
SUNPRO SOLAR434
Sunpro Solar Inc.215
SUNPRO SOLAR, INC27
Sunpro Solar Inc10
SunPro Solar Inc.5

Common questions

Where does Sunpro Solar install solar?

Its installs are spread across 12 counties. The most are in Riverside County (888 installs), followed by San Diego County (569).

How often does Sunpro Solar install batteries with solar?

3.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Sunpro Solar installs are under NEM 3.0 (the Net Billing Tariff)?

30 of its 1,839 interconnected installs (1.6% of the 1,839 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.