Solar installers in Carlsbad, California

Most installs here are in San Diego County.

Who installs the most solar in Carlsbad?

Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Carlsbad are Sunrun (171), Asgard Electric (110) and Baker Electric, Inc. (66). They account for 347 of the 910 residential solar installs interconnected there in that window.

In all, 11,720 homes in Carlsbad have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installers ranked by interconnected installs, last 24 months

Sep 2024 through Aug 2026. Top 25 of 133 installers with installs in this window. 26 installs in the window were self-installed or had no installer recorded.

1Sunrun1711,068
2Asgard Electric110124
3Baker Electric, Inc.661,304
4Stellar Solar57729
5Aloha Solar Power46106
6Swell Energy4176
7Tesla Energy Operations (formerly SolarCity)37916
8SOLARA HOME ENERGY LLC2324
9Sunline Energy Inc.19206
10Semper Solaris Construction Inc17464
11Freedom Solar Co15118
12Solartech13201
13Bright Planet Solar12104
14San Diego County Solar11106
15Solar Universe San Marcos1068
16Cosmic Solar, Inc.881
17Powur PBC (Powur Home)875
18G C Electric-Solar770
19home unplugged7236
20West Coast Solar778
21PALOMAR SOLAR LTD679
22Solar Optimum Inc.662
23Eriksson597
24AXIA SOLAR CORP44
25Bitterend Ventures Inc DBA BVI SOLAR413

Most installs, all time

1Baker Electric, Inc.1,3041,304
2Sunrun1,0681,068
3Tesla Energy Operations (formerly SolarCity)916916
4Stellar Solar729729
5Semper Solaris Construction Inc464464
6SunPower420420
7Sullivan Solar Power364364
8home unplugged236236
9Sunline Energy Inc.206206
10Vivint Solar Developer, LLC204204

Installs by year

YearInstalls interconnectedWith battery storage
20221,3170
20231,6090
20244800
20254860
2026 (through Aug 31, 2026)2830

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Under the Net Billing Tariff (NEM 3.0)

1,110 of the 11,720 residential solar installs in Carlsbad (9.5% of the 11,720 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest was approved Aug 28, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Installers ranked by Net Billing Tariff installs in Carlsbad

1Sunrun2590not recorded
2Asgard Electric1100not recorded
3Baker Electric, Inc.770not recorded
4Swell Energy760not recorded
5Tesla Energy Operations (formerly SolarCity)610not recorded
6Aloha Solar Power570not recorded
7Stellar Solar550not recorded
8Semper Solaris Construction Inc260not recorded
9SOLARA HOME ENERGY LLC240not recorded
10Freedom Solar Co230not recorded
11Bright Planet Solar150not recorded
12Sunline Energy Inc.140not recorded
13Cosmic Solar, Inc.130not recorded
14Solartech120not recorded
15Kota Construction LLC110not recorded

Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.

Equipment recorded

In the last 24 months, 822 of Carlsbad’s 910 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (328, 39.9%) used modules recorded as Qcells.

In the last 24 months, 910 of Carlsbad’s 910 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (412, 45.3%) used inverters recorded as Tesla.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells3281,912
HDHYUNDAIENERGYSOLUTIONSCO.,LTD.86not in top list
Silfab71365
LONGi70not in top list
Canadian Solar61370
Inverter makerTesla412691
Enphase4054,211
SolarEdge893,551
Delta Electronics9208
PointGuardEnergyInc.6not in top list

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 10,948 of 11,720 installs, inverters on 11,433. See the methodology and the equipment index.

ZIP codes in Carlsbad

ZIP codes with their own page where the utilities recorded Carlsbad on at least 10% of the ZIP’s installs, through Aug 31, 2026.

920094,8955,962331
920082,6332,635399
920112,4152,416136
920101,7771,777108

SGIP battery storage projects in Carlsbad

The SGIP report lists 470 battery storage projects with the city Carlsbad, 329 with the status Paid ($4,185,885 in current incentive allocations, 8,896 kWh).

Status as publishedProjectsStorage kWhCurrent incentive
Paid3298,896$4,185,885
PBI in Process118,162$3,717,236
Reserved9136$197,180
Pending Reservation31,064$892,526
Waitlist113$34,624
Cancelled11011,013$5,547,487
RRF Rejected788$14,475

Installers named on the most SGIP storage projects in Carlsbad

InstallerProjectsPaid
Semper Solaris Construction Inc7649
Sullivan Solar Power4543
Sunrun4031
Solare Energy, Inc2320
Home Energy Systems, Inc.1614
Tesla Energy Operations (formerly SolarCity)1515
Sunline Energy Inc.149
HAVEN ENERGY SERVICES INC137
Tesla1312
SunPower105

132 of the 470 projects name no installer with a page in this index, so they are counted above but not in this list.

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

All SGIP battery projects, and SGIP battery incentive money by county.

SolarAPP+ automated permitting

Carlsbad is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, MPU. The list gives no start date.

Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.

At a glance

Residential solar installs
11,720
Last 24 months
910
Capacity
75.2 MW DC
Median system size
5.7 kW DC
With battery storage
not recorded (SDG&E files batteries as separate projects, not on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
15.7% where reported
Ownership types recorded
PPA 1,206, lease 303, prepaid lease 17, other 62
Earliest install in data
Jul 12, 2000

Common questions

How many homes in Carlsbad have solar?

11,720 residential solar systems in Carlsbad were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 910 of them in the last 24 months. Homes on municipal utilities are not included.

How many solar installers work in Carlsbad?

133 installer names have at least one install interconnected in Carlsbad in the last 24 months, and 600 appear in the full record.

How common are batteries with new solar in Carlsbad?

Battery storage is not recorded on the solar installs interconnected in Carlsbad: SDG&E files a battery as its own project record, not on the solar record.

How many solar installs in Carlsbad are under NEM 3.0?

1,110 of the 11,720 residential solar installs in Carlsbad (9.5% of the 11,720 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.