Kota Construction LLC

How many solar installs has Kota Construction LLC done in California, and which license number is on its installs?

Kota Construction LLC has 6,442 residential solar installs interconnected in California, active in the records from 2020 through 2026 (Jun 9, 2020 to Jun 26, 2026), most of them in San Diego County (1,284), Contra Costa County (1,218) and Ventura County (1,010). The license number recorded on most of its installs, 1063901, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
6,442
Last 24 months
52
Total capacity
43,477.7 kW DC
Median system size
6 kW DC
With battery storage
8.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 31.1% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.1% of 6,442 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
412 installs, latest Jun 26, 2026
Ownership types recorded
PPA 4
Median battery size
13.5 kWh (260 installs list a capacity)
First install
Jun 9, 2020
Latest install
Jun 26, 2026
Counties
32
Utilities
PGE 2,955, SCE 2,123, SDGE 1,364
CSLB license
1063901

Is Kota Construction LLC still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (14 in all).

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2020 to 2026

YearInstalls interconnectedWith battery storage
20203061
20211,0134
20222,21064
20232,481136
2024395190
2025275
2026 (through Aug 31, 2026)104

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

412 of its 6,442 interconnected installs (6.4% of the 6,442 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 95.2% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Jun 26, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.06,03093.6%145 (3.0%)
Net Billing Tariff4126.4%259 (95.2%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 4 of Kota Construction LLC’s installs the utility recorded a third-party ownership type: PPA 4, lease 0, prepaid lease 0, other 0. Across all installers, 1 residential systems list a third-party owner name that matches Kota Construction LLC exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
LightReach3
KOTA CONSTRUCTION1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 50 of Kota Construction LLC’s 52 installs name a module maker in the “Generator Manufacturer” fields, and most of those (28, 56.0%) used modules recorded as Qcells.

In the last 24 months, 52 of Kota Construction LLC’s 52 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (46, 88.5%) used inverters recorded as Enphase.

In the last 24 months, 14 of Kota Construction LLC’s 52 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (6, 42.9%) used batteries recorded as FranklinWH.

379 of 404 battery-paired PG&E and SCE installs (93.8%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells282,103
REC182,359
LONGi2not in top list
Silfab2321
Hyundai1not in top list
Inverter makerEnphase465,090
FranklinWH571
SolarEdge4930
Tesla4111
SMA1not in top list
Battery makerFranklinWH6172
Enphase4167
Tesla425

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 6,126 of 6,442 installs, inverters on 6,442. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Kota Construction LLC as developer on 31 battery storage projects and as installer on 29 (29 name it as both), 31 projects in all with 477 kWh of storage. 16 have the status Paid, with $90,055 in current incentive allocations. Applications were received from Aug 4, 2021 to Mar 29, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid16241$90,055
Pending Reservation119$14,060
Cancelled10177$65,866
RRF Rejected439$6,083

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage16171$25,50511$17,114
Equity Resiliency8141$122,4374$63,149
Large-Scale Storage3126$22,0381$9,792
Not stated439$6,0830$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1063901Not found in the CSLB License Master file pulled Nov 4, 20266,441

License numbers are the ones the utilities recorded on the interconnection applications (6,442 of 6,442 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list Kota Construction LLC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20202021202220232024Total
City and County of San Francisco1063901012003
unincorporated San Diego County106390182157537146
unincorporated Marin County1063901040004

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego1,284
Contra Costa1,218
Ventura1,010
Alameda1,009
Los Angeles396
Riverside313
Orange221
San Bernardino156
Fresno126
San Mateo95
Kern94
Solano94
Santa Clara74
Tulare66
Napa55
Marin43
San Joaquin31
Madera28
Monterey27
Santa Barbara27
Sonoma23
Lake14
Placer7
San Francisco7
Kings5
Merced5
Santa Cruz4
El Dorado3
San Benito2
San Luis Obispo2
Yolo2
Sutter1

Top cities

CityInstalls
Oakland551
Oceanside272
San Diego264
Camarillo246
Concord228
Berkeley204
Thousand Oaks169
Oxnard168
Simi Valley152
Vista127
Ventura122
Carlsbad116
Pittsburg109
Hercules97
Martinez97

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
KOTA CONSTRUCTION LLC5,075
Kota Construction LLC1,363
KOTA Construction LLC3
KOTA Construction1

Common questions

Where does Kota Construction LLC install solar?

Its installs are spread across 32 counties. The most are in San Diego County (1,284 installs), followed by Contra Costa County (1,218).

How often does Kota Construction LLC install batteries with solar?

8.0% of its interconnected solar installs include battery storage across all years, and 31.1% in the last 24 months (14 of 45). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Kota Construction LLC installs are under NEM 3.0 (the Net Billing Tariff)?

412 of its 6,442 interconnected installs (6.4% of the 6,442 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 95.2% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.