Solar installers in Ventura, California

Most installs here are in Ventura County.

Who installs the most solar in Ventura?

Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Ventura are Sunrun (356), SunPower (112) and Tesla Energy Operations (formerly SolarCity) (68). They account for 536 of the 1,001 residential solar installs interconnected there in that window.

In all, 5,303 homes in Ventura have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installers ranked by interconnected installs, last 24 months

Sep 2024 through Aug 2026. Top 25 of 114 installers with installs in this window. 8 installs in the window were self-installed or had no installer recorded.

1Sunrun356921
2SunPower112300
3Tesla Energy Operations (formerly SolarCity)68472
4SESPE POWER SOLUTIONS41150
5CALIFORNIA SOLAR ELECTRIC SYSTEMS INC34137
6COASTAL SOLAR3397
7PORTICADE ENERGY LLC2727
8WAYNE PENDREY CONSTRUCTION INC DBA THE SOLAR CONTRACTOR2355
9R C ELECTRIC1439
10FREEDOM FOREVER LLC1198
11NRG Clean Power1137
12Solar Optimum Inc.1169
13ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING1078
14WICKS99
15Alternative Energy Solutions88
16Complete Solar817
17PES ENERGY88
18Photon Brothers88
19SHELTER ROOFING & SOLAR CONSTRUCTION823
20AXIA SOLAR CORP67
21CALIFORNIA SOLAR & ELECTRIC INC67
22CARTER SERVICES INC66
23A P ELECTRICAL514
24Brighten Solar Construction517
25CALI-CO CONTRACTORS LLC55

Most installs, all time

1Sunrun921921
2Vivint Solar Developer, LLC714714
3Tesla Energy Operations (formerly SolarCity)472472
4SunPower300300
5SESPE POWER SOLUTIONS150150
6CALIFORNIA SOLAR ELECTRIC SYSTEMS INC137137
7Kota Construction LLC122122
8FREEDOM FOREVER LLC9898
9COASTAL SOLAR9797
10Coastal Constructors, Inc.8484

Installs by year

YearInstalls interconnectedWith battery storage
2022605173
2023863219
2024364209
2025510341
2026 (through Aug 31, 2026)396303

Under the Net Billing Tariff (NEM 3.0)

959 of the 5,303 residential solar installs in Ventura (18.1% of the 5,303 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 78.6% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Installers ranked by Net Billing Tariff installs in Ventura

1Sunrun37125869.5%
2Tesla Energy Operations (formerly SolarCity)807998.8%
3SESPE POWER SOLUTIONS424197.6%
4SunPower36616.7%
5PORTICADE ENERGY LLC2727100.0%
6COASTAL SOLAR262492.3%
7FREEDOM FOREVER LLC242395.8%
8CALIFORNIA SOLAR ELECTRIC SYSTEMS INC211990.5%
9WAYNE PENDREY CONSTRUCTION INC DBA THE SOLAR CONTRACTOR191578.9%
10ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING1818100.0%
11NRG Clean Power131292.3%
12Solar Optimum Inc.13969.2%
13PES ENERGY88100.0%
14Photon Brothers88100.0%
15Powur PBC (Powur Home)8562.5%

Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.

Equipment recorded

In the last 24 months, 985 of Ventura’s 1,001 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (399, 40.5%) used modules recorded as Qcells.

In the last 24 months, 1,001 of Ventura’s 1,001 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (469, 46.9%) used inverters recorded as Enphase.

In the last 24 months, 700 of Ventura’s 1,001 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (482, 68.9%) used batteries recorded as Tesla.

1,461 of 1,547 battery-paired PG&E and SCE installs (94.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells3991,188
JA Solar116286
Silfab99190
REC81387
LONGi61212
Inverter makerEnphase4691,909
Tesla374462
SolarEdge1361,754
SunPower16375
SMA13244
Battery makerTesla482914
Enphase106213
FranklinWH5966
SolarEdge3968
Lunar Energy88

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 4,346 of 5,303 installs, inverters on 5,302. See the methodology and the equipment index.

ZIP codes in Ventura

ZIP codes with their own page where the utilities recorded Ventura on at least 10% of the ZIP’s installs, through Aug 31, 2026.

930032,4262,427498
930041,9051,905317
93001970970187

SGIP battery storage projects in Ventura

The SGIP report lists 497 battery storage projects with the city Ventura, 318 with the status Paid ($2,313,559 in current incentive allocations, 5,757 kWh).

Status as publishedProjectsStorage kWhCurrent incentive
Paid3185,757$2,313,559
PBI in Process42,790$2,193,710
Reserved405,138$3,323,690
Pending Reservation8233$652,324
Waitlist3131$240,462
Cancelled11535,584$19,846,026
RRF Rejected9123$21,240

Installers named on the most SGIP storage projects in Ventura

InstallerProjectsPaid
SWELL SERVICES INC DBA SWELL CONTRACTORS11398
Coastal Constructors, Inc.3817
SESPE POWER SOLUTIONS3824
Sunrun3417
California Solar Electric2721
Solar Optimum Inc.2621
Semper Solaris Construction Inc2421
Tesla2318
COASTAL SOLAR1912
LA Solar Group1510

32 of the 497 projects name no installer with a page in this index, so they are counted above but not in this list.

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

All SGIP battery projects, and SGIP battery incentive money by county.

At a glance

Residential solar installs
5,303
Last 24 months
1,001
Capacity
28.9 MW DC
Median system size
4.8 kW DC
With battery storage
29.2% all time; 71.2% last 24 months
Third-party owned
30.1% where reported
Ownership types recorded
PPA 1,179, lease 210, prepaid lease 8, other 31
Median battery size
13.5 kWh
Earliest install in data
Oct 5, 1999

Common questions

How many homes in Ventura have solar?

5,303 residential solar systems in Ventura were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 1,001 of them in the last 24 months. Homes on municipal utilities are not included.

How many solar installers work in Ventura?

114 installer names have at least one install interconnected in Ventura in the last 24 months, and 393 appear in the full record.

How common are batteries with new solar in Ventura?

29.2% of the solar installs interconnected in Ventura include battery storage across all years, and 71.2% in the last 24 months (713 of 1,001).

How many solar installs in Ventura are under NEM 3.0?

959 of the 5,303 residential solar installs in Ventura (18.1% of the 5,303 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 78.6% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.