How many solar installs has PORTICADE ENERGY LLC done in California, and which license number is on its installs?

PORTICADE ENERGY LLC has 484 residential solar installs interconnected in California, active in the records from 2023 through 2026 (Jul 14, 2023 to Aug 21, 2026), most of them in Ventura County (139), San Bernardino County (80) and Los Angeles County (62). CSLB lists license 1089987 (ACTION SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Apr 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
484
Last 24 months
481
Total capacity
3,642.8 kW DC
Median system size
6.9 kW DC
With battery storage
98.8% all time; 99.2% last 24 months
Third-party owned
90.9% of 484 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
481 installs, latest Aug 21, 2026
Ownership types recorded
PPA 440
Median battery size
9.7 kWh (438 installs list a capacity)
First install
Jul 14, 2023
Latest install
Aug 21, 2026
Counties
38
Utilities
SCE 374, PGE 110
CSLB license
1089987

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2023 to 2026

YearInstalls interconnectedWith battery storage
202310
20242422
2025326323
2026 (through Aug 31, 2026)133133

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

481 of its 484 interconnected installs (99.4% of the 484 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 99.4% of those include battery storage. The latest Net Billing Tariff install was approved Aug 21, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.030.6%0 (0.0%)
Net Billing Tariff48199.4%478 (99.4%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 440 of PORTICADE ENERGY LLC’s installs the utility recorded a third-party ownership type: PPA 440, lease 0, prepaid lease 0, other 0. Across all installers, 19 residential systems list a third-party owner name that matches PORTICADE ENERGY LLC exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Goodleap212
EnFin86
Palmetto Solar, LLC72
PALMETTO HASI HOLDINGS LLC26
Palmetto18

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 474 of PORTICADE ENERGY LLC’s 481 installs name a module maker in the “Generator Manufacturer” fields, and most of those (275, 58.0%) used modules recorded as Qcells.

In the last 24 months, 481 of PORTICADE ENERGY LLC’s 481 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (213, 44.3%) used inverters recorded as Enphase.

In the last 24 months, 469 of PORTICADE ENERGY LLC’s 481 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (198, 42.2%) used batteries recorded as Enphase.

470 of 478 battery-paired PG&E and SCE installs (98.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells275275
JinkoSolar190190
Canadian Solar1313
REC78
JA Solar44
Inverter makerEnphase213213
SolarEdge197199
Tesla9494
ABB88
SMA66
Battery makerEnphase198198
SolarEdge176176
Tesla9494
FranklinWH12
SunPower11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 477 of 484 installs, inverters on 484. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1089987ACTION SOLAR (Limited Liability)CLEARC-10 Electrical ContractorApr 13, 2022Apr 30, 2028484

License numbers are the ones the utilities recorded on the interconnection applications (484 of 484 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1089987. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list PORTICADE ENERGY LLC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2023202420252026Total
City and County of San Francisco108998700123
unincorporated San Diego County1089987159015

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Ventura139
San Bernardino80
Los Angeles62
Riverside49
Kern45
Orange16
Santa Barbara12
Fresno10
Contra Costa5
Kings5
San Joaquin5
San Luis Obispo5
Tulare5
Placer4
Sonoma4
Inyo3
Santa Clara3
Sutter3
Butte2
Lake2
Madera2
Mariposa2
Merced2
Monterey2
Napa2
Solano2
Tuolumne2
Alameda1
Colusa1
El Dorado1
Glenn1
Humboldt1
San Benito1
San Francisco1
San Mateo1
Stanislaus1
Yolo1
Yuba1

Top cities

CityInstalls
Oxnard62
Camarillo28
Ventura27
Bakersfield20
Lancaster19
Palmdale19
Ontario11
Apple Valley10
Newbury Park10
Moreno Valley8
Barstow7
Hesperia7
San Bernardino7
Victorville7
Blythe6

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
PORTICADE ENERGY LLC484

Common questions

Where does PORTICADE ENERGY LLC install solar?

Its installs are spread across 38 counties. The most are in Ventura County (139 installs), followed by San Bernardino County (80).

How often does PORTICADE ENERGY LLC install batteries with solar?

98.8% of its interconnected solar installs include battery storage across all years, and 99.2% in the last 24 months (477 of 481).

How many PORTICADE ENERGY LLC installs are under NEM 3.0 (the Net Billing Tariff)?

481 of its 484 interconnected installs (99.4% of the 484 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 99.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources