Solar installers in Napa County, California

Who installs the most solar in Napa County?

Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Napa County are Sunrun (308), BRIGHT OPS (115) and Citadel Roofing and Solar (105). They account for 528 of the 1,456 residential solar installs interconnected there in that window.

In all, 9,276 homes in Napa County have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installers ranked by interconnected installs, last 24 months

Sep 2024 through Aug 2026. Top 25 of 162 installers with installs in this window. 28 installs in the window were self-installed or had no installer recorded.

1Sunrun3081,139
2BRIGHT OPS115127
3Citadel Roofing and Solar105266
4Tesla Energy Operations (formerly SolarCity)701,031
5V3 Electric55251
6AMBROSE SOLAR53265
7MASTER ROOFING SOLUTIONS LLC4848
8Green Stock Solar47397
9Northern Pacific Power Systems, Inc.40143
10FREEDOM FOREVER LLC38161
11NORTH VALLEY LLC2856
12Semper Solaris Construction Inc25122
13SUNNOVA ENERGY CORPORATION1919
14Complete Solar1842
15SunPower15400
16VITAL ENERGY SOLUTIONS LLC1516
17SolarCraft Services1499
18ROCKIN ROOFERS1350
19NRG Clean Power1246
20SUNTEGRITY SOLAR1234
21AXIA SOLAR CORP1111
22ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING1166
23LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC1111
24Nexus Energy Systems1140
25High Definition Solar10141

Most installs, all time

1Sunrun1,1391,139
2Tesla Energy Operations (formerly SolarCity)1,0311,031
3SunPower400400
4Green Stock Solar397397
5Citadel Roofing and Solar266266
6AMBROSE SOLAR265265
7V3 Electric251251
8Vivint Solar Developer, LLC249249
9FREEDOM FOREVER LLC161161
10Northern Pacific Power Systems, Inc.143143

Installs by year

YearInstalls interconnectedWith battery storage
20221,149271
20231,213249
2024663402
2025745530
2026 (through Aug 31, 2026)505336

Under the Net Billing Tariff (NEM 3.0)

1,443 of the 9,276 residential solar installs in Napa County (15.6% of the 9,276 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 85.0% of those include battery storage. The latest was approved Aug 27, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Installers ranked by Net Billing Tariff installs in Napa County

1Sunrun38333487.2%
2BRIGHT OPS12712598.4%
3Tesla Energy Operations (formerly SolarCity)928693.5%
4V3 Electric737095.9%
5AMBROSE SOLAR555396.4%
6Citadel Roofing and Solar462554.3%
7FREEDOM FOREVER LLC414097.6%
8Northern Pacific Power Systems, Inc.4141100.0%
9NORTH VALLEY LLC4040100.0%
10Semper Solaris Construction Inc211781.0%
11SunPower201785.0%
12MASTER ROOFING SOLUTIONS LLC1900.0%
13Green Stock Solar16212.5%
14ROCKIN ROOFERS161593.8%
15SolarCraft Services1616100.0%

Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.

Cities in Napa County

CityAll-time installs
Napa6,059
American Canyon1,761
Saint Helena639
Calistoga400
Angwin142
Yountville116
Pope Valley59
Rutherford24
Deer Park20
Oakville16
Lake Berryessa10
Sonoma7
Healdsburg2
Kensington1
Ross1
Walnut Creek1

ZIP codes in Napa County

ZIP codes with their own page where the utilities recorded Napa County on at least 10% of the ZIP’s installs, through Aug 31, 2026.

945584,7444,744759
945031,7601,766276
945591,3201,320196
9457463863888
9451540144267
9450814314322
9459911611622
9456759595
9457325254

Equipment recorded

In the last 24 months, 1,375 of Napa County’s 1,456 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (443, 32.2%) used modules recorded as Qcells.

In the last 24 months, 1,456 of Napa County’s 1,456 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (668, 45.9%) used inverters recorded as Tesla.

In the last 24 months, 863 of Napa County’s 1,456 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (520, 60.3%) used batteries recorded as Tesla.

1,989 of 2,316 battery-paired PG&E and SCE installs (85.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells4431,730
JA Solar278520
REC194946
Canadian Solar127625
LONGi72535
Inverter makerTesla6681,433
Enphase5813,615
SolarEdge2672,730
FranklinWH45not in top list
SunPower20533
Battery makerTesla5201,140
Enphase144288
SolarEdge109138
FranklinWH4257
Lunar Energy1919

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 8,597 of 9,276 installs, inverters on 9,276. See the methodology and the equipment index.

SGIP battery storage projects in Napa County

The SGIP public project report downloaded Nov 16, 2026 lists 549 battery storage projects in Napa County with the status Paid, carrying $8,720,684 in current incentive allocations and 15,229 kWh of storage. Across every status it lists 932 storage projects there, 308 of them cancelled and 75 at another stage.

Status as publishedProjectsStorage kWhCurrent incentive
Paid54915,229$8,720,684
PBI in Process86,327$3,544,558
Reserved39651$830,552
Pending Reservation377$137,192
Cancelled30827,092$14,649,093
RRF Rejected25310$50,681

Installers named on the most SGIP storage projects in Napa County

InstallerProjectsPaid
Semper Solaris Construction Inc160104
Hooked On Solar10261
JAJ Roofing dba Citadel Roofing & Solar6559
Citadel Roofing and Solar6458
Sunrun6029
AMBROSE SOLAR5244
SunPower5230
Infinity Energy, Inc3423
Northern Pacific Power Systems, Inc.3424
Tesla3021

52 of the 932 projects name no installer with a page in this index, so they are counted above but not in this list.

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

All SGIP battery projects, and SGIP battery incentive money by county.

Electric utilities serving Napa County (EIA)

EIA’s 2025 Service Territory file lists 1 utility serving Napa County. 1 filed net metering rows; their counts below cover each utility’s whole California service area, not only this county.

Utility (EIA name)Ownership (EIA)PV installationsResidentialPV capacity MWUnitPV-paired batteries
Pacific Gas & Electric Co.Investor Owned949,590924,8549,449.31AC178,468

From EIA’s Form EIA-861 2025 data files (downloaded Nov 16, 2026). EIA describes the net metering file this way: “The data contain cumulative installation count and capacity of generators that are net metered by technology, state, sector, and balancing authority.” Counts are utility-reported as of December 31, 2025, for each utility’s whole California service area. Unit is the capacity unit the utility reported, AC or DC; EIA’s utility rows are “reported as collected,” so DC and AC figures are not converted here. Blank cells are cells EIA printed as a period. EIA’s file notes: “All Technologies does not include batteries.”

All California utilities in EIA’s net metering data.

Solar contractor licenses in Napa County

5 C-46 Solar licenses in the CSLB License Master file downloaded Nov 4, 2026 (latest LastUpdate date in the file: Nov 4, 2026) list Napa County as the county: 4 with the business type Corporation, Limited Liability, Partnership or JointVenture and 1 Sole Owner. 2 C-10 Electrical licenses in Napa County carry license numbers the utilities recorded on 10 or more residential solar records.

Solar contractor licenses in Napa County, with status, bond and workers’ compensation fields as CSLB publishes them. Sole Owner licenses are counted but not named.

At a glance

Residential solar installs
9,276
Last 24 months
1,456
Capacity
65.2 MW DC
Median system size
5.7 kW DC
With battery storage
25.0% all time; 69.9% last 24 months
Third-party owned
20.2% where reported
Ownership types recorded
PPA 1,591, lease 239, prepaid lease 14, other 33
Median battery size
13.5 kWh
Earliest install in data
Sep 1, 1996

Common questions

How many homes in Napa County have solar?

9,276 residential solar systems in Napa County were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 1,456 of them in the last 24 months. Homes on municipal utilities are not included.

How many solar installers work in Napa County?

162 installer names have at least one install interconnected in Napa County in the last 24 months, and 703 appear in the full record.

How common are batteries with new solar in Napa County?

25.0% of the solar installs interconnected in Napa County include battery storage across all years, and 69.9% in the last 24 months (1,018 of 1,456).

How many solar installs in Napa County are under NEM 3.0?

1,443 of the 9,276 residential solar installs in Napa County (15.6% of the 9,276 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 85.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.