Solar installers in Walnut Creek, California

Most installs here are in Contra Costa County.

Who installs the most solar in Walnut Creek?

Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Walnut Creek are Sunrun (108), Citadel Roofing and Solar (89) and Tesla Energy Operations (formerly SolarCity) (78). They account for 275 of the 765 residential solar installs interconnected there in that window.

In all, 5,699 homes in Walnut Creek have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installers ranked by interconnected installs, last 24 months

Sep 2024 through Aug 2026. Top 25 of 121 installers with installs in this window. 32 installs in the window were self-installed or had no installer recorded.

1Sunrun108485
2Citadel Roofing and Solar89155
3Tesla Energy Operations (formerly SolarCity)78694
4GOT WATTS ELECTRIC, SOLAR & HVAC60171
5BRIGHT OPS2121
6Solar Technologies21159
7AMBROSE SOLAR1765
8FREEDOM FOREVER LLC1557
9Semper Solaris Construction Inc1572
10YOUR ENERGY SOLUTIONS15176
11Diablo Solar Services13208
12ILLUMINATE SOLAR COMPANY1251
13SOL R US ELECTRICAL INC1133
14Solar Optimum Inc.957
15EAST BAY POWER SYSTEMS LLC810
16Nexus Energy Systems820
17NRG Clean Power837
18V3 Electric821
19AXIA SOLAR CORP77
20Hooked On Solar753
21Sunergy77
22BRIGHT ENERGY GROUP LLC67
23POWUR HOME CONSTRUCTION67
24Synergy Power627
25All on Electric532

Most installs, all time

1Tesla Energy Operations (formerly SolarCity)694694
2Sunrun485485
3Diablo Solar Services208208
4SunPower202202
5YOUR ENERGY SOLUTIONS176176
6GOT WATTS ELECTRIC, SOLAR & HVAC171171
7Solar Technologies159159
8Citadel Roofing and Solar155155
9Quick Systems128128
10West Coast Solar127127

Installs by year

YearInstalls interconnectedWith battery storage
2022769176
2023704129
2024330202
2025391294
2026 (through Aug 31, 2026)262200

Under the Net Billing Tariff (NEM 3.0)

709 of the 5,699 residential solar installs in Walnut Creek (12.4% of the 5,699 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 91.7% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Installers ranked by Net Billing Tariff installs in Walnut Creek

1Sunrun13913899.3%
2Tesla Energy Operations (formerly SolarCity)898797.8%
3GOT WATTS ELECTRIC, SOLAR & HVAC625690.3%
4BRIGHT OPS2121100.0%
5AMBROSE SOLAR181794.4%
6FREEDOM FOREVER LLC1818100.0%
7NRG Clean Power151493.3%
8SOL R US ELECTRICAL INC1414100.0%
9Solar Technologies131292.3%
10YOUR ENERGY SOLUTIONS1313100.0%
11Citadel Roofing and Solar11763.6%
12Semper Solaris Construction Inc11872.7%
13Solar Optimum Inc.1010100.0%
14V3 Electric1010100.0%
15Diablo Solar Services9888.9%

Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.

Equipment recorded

In the last 24 months, 700 of Walnut Creek’s 765 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (160, 22.9%) used modules recorded as Qcells.

In the last 24 months, 765 of Walnut Creek’s 765 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (390, 51.0%) used inverters recorded as Tesla.

In the last 24 months, 459 of Walnut Creek’s 765 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (285, 62.1%) used batteries recorded as Tesla.

1,023 of 1,217 battery-paired PG&E and SCE installs (84.1%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells160808
JA Solar155270
REC129561
Hyundai56not in top list
SunPower46771
Inverter makerTesla390835
Enphase3082,069
SolarEdge921,675
FranklinWH26not in top list
SunPower26580
Battery makerTesla285637
Enphase81157
SolarEdge3439
FranklinWH2533
Lunar Energy1717

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 5,337 of 5,699 installs, inverters on 5,699. See the methodology and the equipment index.

ZIP codes in Walnut Creek

ZIP codes with their own page where the utilities recorded Walnut Creek on at least 10% of the ZIP’s installs, through Aug 31, 2026.

945982,4012,402283
945961,1591,159135
945971,1451,145237
945959921,002116

SGIP battery storage projects in Walnut Creek

The SGIP report lists 285 battery storage projects with the city Walnut Creek, 172 with the status Paid ($811,705 in current incentive allocations, 3,347 kWh).

Status as publishedProjectsStorage kWhCurrent incentive
Paid1723,347$811,705
Reserved9135$161,886
Pending Reservation115$19,800
Cancelled823,268$1,477,281
RRF Rejected21313$47,630

Installers named on the most SGIP storage projects in Walnut Creek

InstallerProjectsPaid
Semper Solaris Construction Inc5639
SunPower2010
Hooked On Solar1613
Sunrun169
Citadel Roofing and Solar1511
JAJ Roofing dba Citadel Roofing & Solar1511
SOLAR 4 AMERICA157
PetersenDean126
Solar Optimum Inc.118
AMBROSE SOLAR106

12 of the 285 projects name no installer with a page in this index, so they are counted above but not in this list.

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

All SGIP battery projects, and SGIP battery incentive money by county.

SolarAPP+ automated permitting

Walnut Creek is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST. The list gives no start date.

Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.

At a glance

Residential solar installs
5,699
Last 24 months
765
Capacity
39.1 MW DC
Median system size
6.3 kW DC
With battery storage
21.4% all time; 74.9% last 24 months
Third-party owned
12.6% where reported
Ownership types recorded
PPA 618, lease 79, prepaid lease 5, other 14
Median battery size
13.5 kWh
Earliest install in data
Mar 13, 2002

Common questions

How many homes in Walnut Creek have solar?

5,699 residential solar systems in Walnut Creek were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 765 of them in the last 24 months. Homes on municipal utilities are not included.

How many solar installers work in Walnut Creek?

121 installer names have at least one install interconnected in Walnut Creek in the last 24 months, and 504 appear in the full record.

How common are batteries with new solar in Walnut Creek?

21.4% of the solar installs interconnected in Walnut Creek include battery storage across all years, and 74.9% in the last 24 months (573 of 765).

How many solar installs in Walnut Creek are under NEM 3.0?

709 of the 5,699 residential solar installs in Walnut Creek (12.4% of the 5,699 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 91.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Sources