Solar installers in Walnut Creek, California
Most installs here are in Contra Costa County.
Who installs the most solar in Walnut Creek?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Walnut Creek are Sunrun (108), Citadel Roofing and Solar (89) and Tesla Energy Operations (formerly SolarCity) (78). They account for 275 of the 765 residential solar installs interconnected there in that window.
In all, 5,699 homes in Walnut Creek have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 121 installers with installs in this window. 32 installs in the window were self-installed or had no installer recorded.
| 1 | Sunrun | 108 | 485 |
| 2 | Citadel Roofing and Solar | 89 | 155 |
| 3 | Tesla Energy Operations (formerly SolarCity) | 78 | 694 |
| 4 | GOT WATTS ELECTRIC, SOLAR & HVAC | 60 | 171 |
| 5 | BRIGHT OPS | 21 | 21 |
| 6 | Solar Technologies | 21 | 159 |
| 7 | AMBROSE SOLAR | 17 | 65 |
| 8 | FREEDOM FOREVER LLC | 15 | 57 |
| 9 | Semper Solaris Construction Inc | 15 | 72 |
| 10 | YOUR ENERGY SOLUTIONS | 15 | 176 |
| 11 | Diablo Solar Services | 13 | 208 |
| 12 | ILLUMINATE SOLAR COMPANY | 12 | 51 |
| 13 | SOL R US ELECTRICAL INC | 11 | 33 |
| 14 | Solar Optimum Inc. | 9 | 57 |
| 15 | EAST BAY POWER SYSTEMS LLC | 8 | 10 |
| 16 | Nexus Energy Systems | 8 | 20 |
| 17 | NRG Clean Power | 8 | 37 |
| 18 | V3 Electric | 8 | 21 |
| 19 | AXIA SOLAR CORP | 7 | 7 |
| 20 | Hooked On Solar | 7 | 53 |
| 21 | Sunergy | 7 | 7 |
| 22 | BRIGHT ENERGY GROUP LLC | 6 | 7 |
| 23 | POWUR HOME CONSTRUCTION | 6 | 7 |
| 24 | Synergy Power | 6 | 27 |
| 25 | All on Electric | 5 | 32 |
Most installs, all time
| 1 | Tesla Energy Operations (formerly SolarCity) | 694 | 694 |
| 2 | Sunrun | 485 | 485 |
| 3 | Diablo Solar Services | 208 | 208 |
| 4 | SunPower | 202 | 202 |
| 5 | YOUR ENERGY SOLUTIONS | 176 | 176 |
| 6 | GOT WATTS ELECTRIC, SOLAR & HVAC | 171 | 171 |
| 7 | Solar Technologies | 159 | 159 |
| 8 | Citadel Roofing and Solar | 155 | 155 |
| 9 | Quick Systems | 128 | 128 |
| 10 | West Coast Solar | 127 | 127 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 769 | 176 |
| 2023 | 704 | 129 |
| 2024 | 330 | 202 |
| 2025 | 391 | 294 |
| 2026 (through Aug 31, 2026) | 262 | 200 |
Under the Net Billing Tariff (NEM 3.0)
709 of the 5,699 residential solar installs in Walnut Creek (12.4% of the 5,699 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 91.7% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Walnut Creek
| 1 | Sunrun | 139 | 138 | 99.3% |
| 2 | Tesla Energy Operations (formerly SolarCity) | 89 | 87 | 97.8% |
| 3 | GOT WATTS ELECTRIC, SOLAR & HVAC | 62 | 56 | 90.3% |
| 4 | BRIGHT OPS | 21 | 21 | 100.0% |
| 5 | AMBROSE SOLAR | 18 | 17 | 94.4% |
| 6 | FREEDOM FOREVER LLC | 18 | 18 | 100.0% |
| 7 | NRG Clean Power | 15 | 14 | 93.3% |
| 8 | SOL R US ELECTRICAL INC | 14 | 14 | 100.0% |
| 9 | Solar Technologies | 13 | 12 | 92.3% |
| 10 | YOUR ENERGY SOLUTIONS | 13 | 13 | 100.0% |
| 11 | Citadel Roofing and Solar | 11 | 7 | 63.6% |
| 12 | Semper Solaris Construction Inc | 11 | 8 | 72.7% |
| 13 | Solar Optimum Inc. | 10 | 10 | 100.0% |
| 14 | V3 Electric | 10 | 10 | 100.0% |
| 15 | Diablo Solar Services | 9 | 8 | 88.9% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Equipment recorded
In the last 24 months, 700 of Walnut Creek’s 765 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (160, 22.9%) used modules recorded as Qcells.
In the last 24 months, 765 of Walnut Creek’s 765 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (390, 51.0%) used inverters recorded as Tesla.
In the last 24 months, 459 of Walnut Creek’s 765 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (285, 62.1%) used batteries recorded as Tesla.
1,023 of 1,217 battery-paired PG&E and SCE installs (84.1%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 160 | 808 |
| JA Solar | 155 | 270 | |
| REC | 129 | 561 | |
| Hyundai | 56 | not in top list | |
| SunPower | 46 | 771 | |
| Inverter maker | Tesla | 390 | 835 |
| Enphase | 308 | 2,069 | |
| SolarEdge | 92 | 1,675 | |
| FranklinWH | 26 | not in top list | |
| SunPower | 26 | 580 | |
| Battery maker | Tesla | 285 | 637 |
| Enphase | 81 | 157 | |
| SolarEdge | 34 | 39 | |
| FranklinWH | 25 | 33 | |
| Lunar Energy | 17 | 17 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 5,337 of 5,699 installs, inverters on 5,699. See the methodology and the equipment index.
ZIP codes in Walnut Creek
ZIP codes with their own page where the utilities recorded Walnut Creek on at least 10% of the ZIP’s installs, through Aug 31, 2026.
SGIP battery storage projects in Walnut Creek
The SGIP report lists 285 battery storage projects with the city Walnut Creek, 172 with the status Paid ($811,705 in current incentive allocations, 3,347 kWh).
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 172 | 3,347 | $811,705 |
| Reserved | 9 | 135 | $161,886 |
| Pending Reservation | 1 | 15 | $19,800 |
| Cancelled | 82 | 3,268 | $1,477,281 |
| RRF Rejected | 21 | 313 | $47,630 |
Installers named on the most SGIP storage projects in Walnut Creek
| Installer | Projects | Paid |
|---|---|---|
| Semper Solaris Construction Inc | 56 | 39 |
| SunPower | 20 | 10 |
| Hooked On Solar | 16 | 13 |
| Sunrun | 16 | 9 |
| Citadel Roofing and Solar | 15 | 11 |
| JAJ Roofing dba Citadel Roofing & Solar | 15 | 11 |
| SOLAR 4 AMERICA | 15 | 7 |
| PetersenDean | 12 | 6 |
| Solar Optimum Inc. | 11 | 8 |
| AMBROSE SOLAR | 10 | 6 |
12 of the 285 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
SolarAPP+ automated permitting
Walnut Creek is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST. The list gives no start date.
Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.
At a glance
- Residential solar installs
- 5,699
- Last 24 months
- 765
- Capacity
- 39.1 MW DC
- Median system size
- 6.3 kW DC
- With battery storage
- 21.4% all time; 74.9% last 24 months
- Third-party owned
- 12.6% where reported
- Ownership types recorded
- PPA 618, lease 79, prepaid lease 5, other 14
- Median battery size
- 13.5 kWh
- Earliest install in data
- Mar 13, 2002
Common questions
How many homes in Walnut Creek have solar?
5,699 residential solar systems in Walnut Creek were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 765 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Walnut Creek?
121 installer names have at least one install interconnected in Walnut Creek in the last 24 months, and 504 appear in the full record.
How common are batteries with new solar in Walnut Creek?
21.4% of the solar installs interconnected in Walnut Creek include battery storage across all years, and 74.9% in the last 24 months (573 of 765).
How many solar installs in Walnut Creek are under NEM 3.0?
709 of the 5,699 residential solar installs in Walnut Creek (12.4% of the 5,699 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 91.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.