BRIGHT ENERGY GROUP LLC has 444 residential solar installs interconnected in California, active in the records from 2023 through 2026 (Sep 22, 2023 to Aug 26, 2026), most of them in Alameda County (82), Contra Costa County (66) and Santa Clara County (61). The license number recorded on most of its installs, 1080822, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
444
Last 24 months
381
Total capacity
3,688.1 kW DC
Median system size
7.5 kW DC
With battery storage
92.3% all time; 96.6% last 24 months
Third-party owned
49.5% of 444 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
435 installs, latest Aug 26, 2026
Ownership types recorded
PPA 210, lease 8, other 2
Median battery size
13.5 kWh (325 installs list a capacity)
First install
Sep 22, 2023
Latest install
Aug 26, 2026
Counties
30
Utilities
PGE 418, SCE 26
CSLB license
1080822

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2023 to 2026

YearInstalls interconnectedWith battery storage
202320
202410987
2025251246
2026 (through Aug 31, 2026)8277

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

435 of its 444 interconnected installs (98.0% of the 444 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 92.4% of those include battery storage. The latest Net Billing Tariff install was approved Aug 26, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.040.9%not counted
NEM 2.051.1%5 (100.0%)
Net Billing Tariff43598.0%402 (92.4%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 220 of BRIGHT ENERGY GROUP LLC’s installs the utility recorded a third-party ownership type: PPA 210, lease 8, prepaid lease 0, other 2. Across all installers, 2 residential systems list a third-party owner name that matches BRIGHT ENERGY GROUP LLC exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Enfin201
AXIA SOLAR CORP11
Goodleap2
Mosaic2
Bright Energy Group1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 363 of BRIGHT ENERGY GROUP LLC’s 381 installs name a module maker in the “Generator Manufacturer” fields, and most of those (271, 74.7%) used modules recorded as Qcells.

In the last 24 months, 381 of BRIGHT ENERGY GROUP LLC’s 381 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (263, 69.0%) used inverters recorded as Tesla.

In the last 24 months, 269 of BRIGHT ENERGY GROUP LLC’s 381 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (223, 82.9%) used batteries recorded as Tesla.

302 of 410 battery-paired PG&E and SCE installs (73.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells271289
Hyundai6161
SunPower1942
Waaree923
REC713
Inverter makerTesla263263
Enphase66112
Qcells6271
SunPower1642
FranklinWH715
Battery makerTesla223223
Enphase2933
SunPower1031
FranklinWH715
Lunar Energy1not in top list

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 426 of 444 installs, inverters on 444. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names BRIGHT ENERGY GROUP LLC as developer on 16 battery storage projects and as installer on 14 (12 name it as both), 18 projects in all with 279 kWh of storage. 10 have the status Paid, with $76,612 in current incentive allocations. Applications were received from Mar 6, 2023 to Dec 15, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid10150$76,612
Reserved359$46,059
Cancelled570$66,287

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage10136$20,1856$11,340
Equity Resiliency6116$109,0814$65,272
Residential Solar and Storage Equity - AB 209 Non-POU226$59,6920$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1080822Not found in the CSLB License Master file pulled Nov 4, 2026443

License numbers are the ones the utilities recorded on the interconnection applications (443 of 444 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list BRIGHT ENERGY GROUP LLC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20212022202320242025Total
City and County of San Francisco10808224321919
unincorporated San Diego County1080822000112

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Alameda82
Contra Costa66
Santa Clara61
San Mateo56
Sonoma24
Solano20
San Joaquin18
Kern14
Placer13
Marin12
Napa12
Los Angeles11
San Bernardino7
El Dorado5
San Francisco5
Yuba5
Calaveras4
Merced4
Tulare4
Amador3
Sutter3
Butte2
Fresno2
Orange2
Riverside2
Shasta2
Yolo2
Nevada1
Santa Cruz1
Tuolumne1

Top cities

CityInstalls
San Jose24
Fremont19
Santa Rosa14
Oakland13
Stockton13
Bakersfield10
Concord10
Belmont9
Hayward9
Napa9
San Ramon9
Union City9
Novato8
Redwood City8
Berkeley7

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
BRIGHT ENERGY GROUP LLC443
Bright Energy Group1

Common questions

Where does BRIGHT ENERGY GROUP LLC install solar?

Its installs are spread across 30 counties. The most are in Alameda County (82 installs), followed by Contra Costa County (66).

How often does BRIGHT ENERGY GROUP LLC install batteries with solar?

92.3% of its interconnected solar installs include battery storage across all years, and 96.6% in the last 24 months (368 of 381).

How many BRIGHT ENERGY GROUP LLC installs are under NEM 3.0 (the Net Billing Tariff)?

435 of its 444 interconnected installs (98.0% of the 444 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 92.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.