Solar installers in Hayward, California
Most installs here are in Alameda County.
Who installs the most solar in Hayward?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Hayward are Sunrun (254), BRIGHT OPS (188) and Citadel Roofing and Solar (132). They account for 574 of the 1,136 residential solar installs interconnected there in that window.
In all, 7,803 homes in Hayward have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 130 installers with installs in this window. 25 installs in the window were self-installed or had no installer recorded.
| 1 | Sunrun | 254 | 1,000 |
| 2 | BRIGHT OPS | 188 | 202 |
| 3 | Citadel Roofing and Solar | 132 | 703 |
| 4 | Tesla Energy Operations (formerly SolarCity) | 101 | 1,317 |
| 5 | FREEDOM FOREVER LLC | 34 | 167 |
| 6 | SunPower | 31 | 747 |
| 7 | Semper Solaris Construction Inc | 26 | 167 |
| 8 | AXIA SOLAR CORP | 22 | 24 |
| 9 | BETTER EARTH ELECTRIC INC | 15 | 159 |
| 10 | Empower Electric Solar | 15 | 41 |
| 11 | Solar Optimum Inc. | 11 | 63 |
| 12 | NEXT ELECTRIC | 10 | 19 |
| 13 | YOUR ENERGY SOLUTIONS | 10 | 51 |
| 14 | American Array Solar | 9 | 128 |
| 15 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 8 | 40 |
| 16 | Nexus Energy Systems | 8 | 46 |
| 17 | V3 Electric | 8 | 28 |
| 18 | GRID Alternatives | 7 | 22 |
| 19 | NRG Clean Power | 7 | 60 |
| 20 | DEMAND CONSTRUCTION | 6 | 7 |
| 21 | Infinity Energy, Inc | 6 | 52 |
| 22 | AMECO SOLAR LLC | 5 | 7 |
| 23 | BRIGHT ENERGY GROUP LLC | 5 | 9 |
| 24 | FREEDOM FOREVER NORTHERN CALIFORNIA LLC | 5 | 5 |
| 25 | INFINIUM SOLAR, INC. | 5 | 6 |
Most installs, all time
| 1 | Tesla Energy Operations (formerly SolarCity) | 1,317 | 1,317 |
| 2 | Sunrun | 1,000 | 1,000 |
| 3 | SunPower | 747 | 747 |
| 4 | Citadel Roofing and Solar | 703 | 703 |
| 5 | Vivint Solar Developer, LLC | 355 | 355 |
| 6 | BRIGHT OPS | 202 | 202 |
| 7 | FREEDOM FOREVER LLC | 167 | 167 |
| 8 | Semper Solaris Construction Inc | 167 | 167 |
| 9 | BETTER EARTH ELECTRIC INC | 159 | 159 |
| 10 | PetersenDean | 157 | 157 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 894 | 156 |
| 2023 | 1,009 | 147 |
| 2024 | 604 | 354 |
| 2025 | 612 | 486 |
| 2026 (through Aug 31, 2026) | 310 | 236 |
Under the Net Billing Tariff (NEM 3.0)
1,234 of the 7,803 residential solar installs in Hayward (15.8% of the 7,803 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 88.3% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Hayward
| 1 | Sunrun | 347 | 346 | 99.7% |
| 2 | BRIGHT OPS | 202 | 199 | 98.5% |
| 3 | Tesla Energy Operations (formerly SolarCity) | 131 | 120 | 91.6% |
| 4 | Citadel Roofing and Solar | 40 | 2 | 5.0% |
| 5 | FREEDOM FOREVER LLC | 39 | 37 | 94.9% |
| 6 | Semper Solaris Construction Inc | 27 | 20 | 74.1% |
| 7 | SunPower | 27 | 12 | 44.4% |
| 8 | BETTER EARTH ELECTRIC INC | 25 | 24 | 96.0% |
| 9 | AXIA SOLAR CORP | 24 | 22 | 91.7% |
| 10 | Empower Electric Solar | 20 | 15 | 75.0% |
| 11 | V3 Electric | 20 | 16 | 80.0% |
| 12 | American Array Solar | 17 | 14 | 82.4% |
| 13 | Solar Optimum Inc. | 16 | 14 | 87.5% |
| 14 | Bright Planet Solar | 13 | 13 | 100.0% |
| 15 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 12 | 12 | 100.0% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Equipment recorded
In the last 24 months, 1,098 of Hayward’s 1,136 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (359, 32.7%) used modules recorded as Qcells.
In the last 24 months, 1,136 of Hayward’s 1,136 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (510, 44.9%) used inverters recorded as Tesla.
In the last 24 months, 750 of Hayward’s 1,136 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (415, 55.3%) used batteries recorded as Tesla.
1,399 of 1,573 battery-paired PG&E and SCE installs (88.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 359 | 1,405 |
| JA Solar | 240 | 490 | |
| LONGi | 176 | 889 | |
| REC | 91 | 735 | |
| Trina Solar | 44 | not in top list | |
| Inverter maker | Tesla | 510 | 1,027 |
| Enphase | 377 | 2,306 | |
| SolarEdge | 263 | 2,656 | |
| Lunar Energy | 29 | not in top list | |
| Delta Electronics | 21 | 217 | |
| Battery maker | Tesla | 415 | 767 |
| SolarEdge | 168 | 215 | |
| Enphase | 107 | 173 | |
| Lunar Energy | 29 | 29 | |
| LG | 18 | 160 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 7,480 of 7,803 installs, inverters on 7,802. See the methodology and the equipment index.
ZIP codes in Hayward
ZIP codes with their own page where the utilities recorded Hayward on at least 10% of the ZIP’s installs, through Aug 31, 2026.
SGIP battery storage projects in Hayward
The SGIP report lists 296 battery storage projects with the city Hayward, 191 with the status Paid ($5,341,468 in current incentive allocations, 9,305 kWh).
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 191 | 9,305 | $5,341,468 |
| PBI in Process | 1 | 223 | $89,200 |
| Reserved | 21 | 9,974 | $3,603,183 |
| Pending Reservation | 1 | 26 | $14,134 |
| Cancelled | 68 | 15,140 | $4,933,684 |
| RRF Rejected | 14 | 5,652 | $28,358 |
Installers named on the most SGIP storage projects in Hayward
| Installer | Projects | Paid |
|---|---|---|
| Semper Solaris Construction Inc | 75 | 51 |
| Tesla | 22 | 20 |
| Sunrun | 21 | 16 |
| Hooked On Solar | 20 | 17 |
| SOLAR 4 AMERICA | 14 | 8 |
| Solar Optimum Inc. | 13 | 9 |
| SunPower | 13 | 11 |
| Tesla Energy Operations (formerly SolarCity) | 13 | 12 |
| PetersenDean | 12 | 8 |
| LA Solar Group | 10 | 7 |
26 of the 296 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
SolarAPP+ automated permitting
Hayward is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, MPU, MBD. The list gives no start date.
Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.
At a glance
- Residential solar installs
- 7,803
- Last 24 months
- 1,136
- Capacity
- 38.6 MW DC
- Median system size
- 4.3 kW DC
- With battery storage
- 20.2% all time; 74.8% last 24 months
- Third-party owned
- 25.7% where reported
- Ownership types recorded
- PPA 1,596, lease 370, prepaid lease 16, other 26
- Median battery size
- 13.5 kWh
- Earliest install in data
- Dec 17, 1999
Common questions
How many homes in Hayward have solar?
7,803 residential solar systems in Hayward were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 1,136 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Hayward?
130 installer names have at least one install interconnected in Hayward in the last 24 months, and 473 appear in the full record.
How common are batteries with new solar in Hayward?
20.2% of the solar installs interconnected in Hayward include battery storage across all years, and 74.8% in the last 24 months (850 of 1,136).
How many solar installs in Hayward are under NEM 3.0?
1,234 of the 7,803 residential solar installs in Hayward (15.8% of the 7,803 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 88.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.