Solar installers in Hayward, California

Most installs here are in Alameda County.

Who installs the most solar in Hayward?

Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Hayward are Sunrun (254), BRIGHT OPS (188) and Citadel Roofing and Solar (132). They account for 574 of the 1,136 residential solar installs interconnected there in that window.

In all, 7,803 homes in Hayward have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installers ranked by interconnected installs, last 24 months

Sep 2024 through Aug 2026. Top 25 of 130 installers with installs in this window. 25 installs in the window were self-installed or had no installer recorded.

1Sunrun2541,000
2BRIGHT OPS188202
3Citadel Roofing and Solar132703
4Tesla Energy Operations (formerly SolarCity)1011,317
5FREEDOM FOREVER LLC34167
6SunPower31747
7Semper Solaris Construction Inc26167
8AXIA SOLAR CORP2224
9BETTER EARTH ELECTRIC INC15159
10Empower Electric Solar1541
11Solar Optimum Inc.1163
12NEXT ELECTRIC1019
13YOUR ENERGY SOLUTIONS1051
14American Array Solar9128
15ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING840
16Nexus Energy Systems846
17V3 Electric828
18GRID Alternatives722
19NRG Clean Power760
20DEMAND CONSTRUCTION67
21Infinity Energy, Inc652
22AMECO SOLAR LLC57
23BRIGHT ENERGY GROUP LLC59
24FREEDOM FOREVER NORTHERN CALIFORNIA LLC55
25INFINIUM SOLAR, INC.56

Most installs, all time

1Tesla Energy Operations (formerly SolarCity)1,3171,317
2Sunrun1,0001,000
3SunPower747747
4Citadel Roofing and Solar703703
5Vivint Solar Developer, LLC355355
6BRIGHT OPS202202
7FREEDOM FOREVER LLC167167
8Semper Solaris Construction Inc167167
9BETTER EARTH ELECTRIC INC159159
10PetersenDean157157

Installs by year

YearInstalls interconnectedWith battery storage
2022894156
20231,009147
2024604354
2025612486
2026 (through Aug 31, 2026)310236

Under the Net Billing Tariff (NEM 3.0)

1,234 of the 7,803 residential solar installs in Hayward (15.8% of the 7,803 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 88.3% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Installers ranked by Net Billing Tariff installs in Hayward

1Sunrun34734699.7%
2BRIGHT OPS20219998.5%
3Tesla Energy Operations (formerly SolarCity)13112091.6%
4Citadel Roofing and Solar4025.0%
5FREEDOM FOREVER LLC393794.9%
6Semper Solaris Construction Inc272074.1%
7SunPower271244.4%
8BETTER EARTH ELECTRIC INC252496.0%
9AXIA SOLAR CORP242291.7%
10Empower Electric Solar201575.0%
11V3 Electric201680.0%
12American Array Solar171482.4%
13Solar Optimum Inc.161487.5%
14Bright Planet Solar1313100.0%
15ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING1212100.0%

Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.

Equipment recorded

In the last 24 months, 1,098 of Hayward’s 1,136 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (359, 32.7%) used modules recorded as Qcells.

In the last 24 months, 1,136 of Hayward’s 1,136 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (510, 44.9%) used inverters recorded as Tesla.

In the last 24 months, 750 of Hayward’s 1,136 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (415, 55.3%) used batteries recorded as Tesla.

1,399 of 1,573 battery-paired PG&E and SCE installs (88.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells3591,405
JA Solar240490
LONGi176889
REC91735
Trina Solar44not in top list
Inverter makerTesla5101,027
Enphase3772,306
SolarEdge2632,656
Lunar Energy29not in top list
Delta Electronics21217
Battery makerTesla415767
SolarEdge168215
Enphase107173
Lunar Energy2929
LG18160

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 7,480 of 7,803 installs, inverters on 7,802. See the methodology and the equipment index.

ZIP codes in Hayward

ZIP codes with their own page where the utilities recorded Hayward on at least 10% of the ZIP’s installs, through Aug 31, 2026.

945443,1963,196490
945411,8561,858272
945451,4891,489235
945421,2441,244138

SGIP battery storage projects in Hayward

The SGIP report lists 296 battery storage projects with the city Hayward, 191 with the status Paid ($5,341,468 in current incentive allocations, 9,305 kWh).

Status as publishedProjectsStorage kWhCurrent incentive
Paid1919,305$5,341,468
PBI in Process1223$89,200
Reserved219,974$3,603,183
Pending Reservation126$14,134
Cancelled6815,140$4,933,684
RRF Rejected145,652$28,358

Installers named on the most SGIP storage projects in Hayward

InstallerProjectsPaid
Semper Solaris Construction Inc7551
Tesla2220
Sunrun2116
Hooked On Solar2017
SOLAR 4 AMERICA148
Solar Optimum Inc.139
SunPower1311
Tesla Energy Operations (formerly SolarCity)1312
PetersenDean128
LA Solar Group107

26 of the 296 projects name no installer with a page in this index, so they are counted above but not in this list.

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

All SGIP battery projects, and SGIP battery incentive money by county.

SolarAPP+ automated permitting

Hayward is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, MPU, MBD. The list gives no start date.

Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.

At a glance

Residential solar installs
7,803
Last 24 months
1,136
Capacity
38.6 MW DC
Median system size
4.3 kW DC
With battery storage
20.2% all time; 74.8% last 24 months
Third-party owned
25.7% where reported
Ownership types recorded
PPA 1,596, lease 370, prepaid lease 16, other 26
Median battery size
13.5 kWh
Earliest install in data
Dec 17, 1999

Common questions

How many homes in Hayward have solar?

7,803 residential solar systems in Hayward were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 1,136 of them in the last 24 months. Homes on municipal utilities are not included.

How many solar installers work in Hayward?

130 installer names have at least one install interconnected in Hayward in the last 24 months, and 473 appear in the full record.

How common are batteries with new solar in Hayward?

20.2% of the solar installs interconnected in Hayward include battery storage across all years, and 74.8% in the last 24 months (850 of 1,136).

How many solar installs in Hayward are under NEM 3.0?

1,234 of the 7,803 residential solar installs in Hayward (15.8% of the 7,803 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 88.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.