NEXT ELECTRIC

How many solar installs has NEXT ELECTRIC done in California, and which license number is on its installs?

NEXT ELECTRIC has 882 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Oct 14, 2019 to Aug 31, 2026), most of them in Santa Clara County (182), San Mateo County (154) and Contra Costa County (151). CSLB lists license 1016284 (NEXT ELECTRIC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-17, expires Jul 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
882
Last 24 months
330
Total capacity
6,493.7 kW DC
Median system size
6.8 kW DC
With battery storage
43.8% all time; 95.5% last 24 months
Third-party owned
0.3% of 882 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
357 installs, latest Aug 31, 2026
Ownership types recorded
PPA 2, lease 1
Median battery size
13.5 kWh (190 installs list a capacity)
First install
Oct 14, 2019
Latest install
Aug 31, 2026
Counties
31
Utilities
PGE 857, SCE 25
CSLB license
1016284

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
2019120
2020800
2021435
202210211
202326325
20247349
2025110106
2026 (through Aug 31, 2026)199190

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

357 of its 882 interconnected installs (40.5% of the 882 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 97.2% of those include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.010.1%not counted
NEM 2.052459.4%38 (7.3%)
Net Billing Tariff35740.5%347 (97.2%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 3 of NEXT ELECTRIC’s installs the utility recorded a third-party ownership type: PPA 2, lease 1, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches NEXT ELECTRIC exactly.

Third-party owner named on its installsInstalls
Lightreach1
SunPower Capital LLC1
Sunrun Inc.1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 327 of NEXT ELECTRIC’s 330 installs name a module maker in the “Generator Manufacturer” fields, and most of those (213, 65.1%) used modules recorded as Hyundai.

In the last 24 months, 330 of NEXT ELECTRIC’s 330 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (212, 64.2%) used inverters recorded as Tesla.

In the last 24 months, 260 of NEXT ELECTRIC’s 330 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (157, 60.4%) used batteries recorded as Tesla.

326 of 386 battery-paired PG&E and SCE installs (84.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHyundai213219
REC34147
Panasonic19104
Qcells18211
SEG Solar15not in top list
Inverter makerTesla212243
Enphase132559
SMA315
SolarEdge220
SunPower2101
Battery makerTesla157184
Enphase103134

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 863 of 882 installs, inverters on 882. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1016284NEXT ELECTRIC (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-17Jul 19, 2016Jul 31, 2028881

License numbers are the ones the utilities recorded on the interconnection applications (881 of 882 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1016284. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list NEXT ELECTRIC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20192020202120222023202420252026Total
City and County of San Francisco101628411788116121881
unincorporated Marin County1016284001000001

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Santa Clara182
San Mateo154
Contra Costa151
Alameda147
San Francisco83
Solano55
San Joaquin18
Sonoma15
Orange12
Marin7
Los Angeles6
Napa6
Merced5
Monterey5
San Bernardino5
Mendocino4
Nevada4
Yolo4
Lake3
Santa Cruz3
Fresno2
Yuba2
Colusa1
Kern1
Riverside1
Sacramento1
Santa Barbara1
Shasta1
Stanislaus1
Sutter1
Tehama1

Top cities

CityInstalls
San Jose96
San Francisco83
Oakland38
Fremont36
Sunnyvale22
Redwood City21
Fairfield19
Hayward19
Concord18
Milpitas17
Richmond17
Vallejo17
Antioch16
Belmont15
San Mateo15

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
NEXT ELECTRIC881
Next Electric1

Common questions

Where does NEXT ELECTRIC install solar?

Its installs are spread across 31 counties. The most are in Santa Clara County (182 installs), followed by San Mateo County (154).

How often does NEXT ELECTRIC install batteries with solar?

43.8% of its interconnected solar installs include battery storage across all years, and 95.5% in the last 24 months (315 of 330).

How many NEXT ELECTRIC installs are under NEM 3.0 (the Net Billing Tariff)?

357 of its 882 interconnected installs (40.5% of the 882 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 97.2% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.