Next Solar Inc

How many solar installs has Next Solar Inc done in California, and which license number is on its installs?

Next Solar Inc has 215 residential solar installs interconnected in California, active in the records from 2016 through 2026 (Nov 29, 2016 to Apr 24, 2026), most of them in Contra Costa County (40), Alameda County (38) and Solano County (30). CSLB lists license 1016284 (NEXT ELECTRIC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-17, expires Jul 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to Next Solar Inc here carry more than one CSLB license number: 1016284 on 168 (CSLB holder NEXT ELECTRIC, San Carlos) and 1025115 on 47 (CSLB holder PARAGONSUN, Irvine), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
215
Last 24 months
5
Total capacity
1,150.4 kW DC
Median system size
4.5 kW DC
With battery storage
1.8% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
1.9% of 215 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
10 installs, latest Apr 24, 2026
Ownership types recorded
other 4
Median battery size
9.8 kWh (1 installs list a capacity)
First install
Nov 29, 2016
Latest install
Apr 24, 2026
Counties
22
Utilities
PGE 149, SDGE 50, SCE 16
CSLB license
1016284, 1025115

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
201610
2017430
2018810
2019601
202040
202120
202240
202360
202492
202520
2026 (through Aug 31, 2026)30

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

10 of its 215 interconnected installs (4.7% of the 215 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 40.0% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Apr 24, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.031.4%not counted
NEM 2.020294.0%1 (0.6%)
Net Billing Tariff104.7%2 (40.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 4 of Next Solar Inc’s installs the utility recorded a third-party ownership type: PPA 0, lease 0, prepaid lease 0, other 4. Across all installers, 4 residential systems list a third-party owner name that matches Next Solar Inc exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Next Solar Inc.4

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 2 of Next Solar Inc’s 5 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (1, 50.0%) used modules recorded as Panasonic.

In the last 24 months, 5 of Next Solar Inc’s 5 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (5, 100.0%) used inverters recorded as Enphase.

In the last 24 months, none of Next Solar Inc’s 5 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

3 of 3 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerPanasonic1not in top list
REC1not in top list
Inverter makerEnphase5132
Battery makerEnphase01
LG01
Tesla01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 208 of 215 installs, inverters on 215. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1016284NEXT ELECTRIC (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-17Jul 19, 2016Jul 31, 2028168
1025115PARAGONSUN (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-46 Solar ContractorMar 23, 2017Mar 31, 202747

License numbers are the ones the utilities recorded on the interconnection applications (215 of 215 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for licenses 1016284, 1025115. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Next Solar Inc’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20192020202120222023202420252026Total
City and County of San Francisco101628411788116121881
unincorporated Marin County1016284001000001

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Contra Costa40
Alameda38
Solano30
Orange26
San Diego25
Santa Clara13
San Joaquin9
San Mateo8
San Bernardino7
Los Angeles4
Riverside3
San Francisco2
El Dorado1
Kern1
Lake1
Madera1
Merced1
Napa1
Placer1
Sacramento1
San Benito1
Ventura1

Top cities

CityInstalls
Oakland25
San Clemente17
Fairfield12
Vallejo9
Concord8
Pittsburg8
Richmond8
San Diego7
Vacaville7
Antioch6
Stockton6
Oceanside5
Hayward4
San Jose4
Sunnyvale4

Names as recorded by the utilities

The utilities recorded this installer under 8 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Next Solar Inc130
Next Solar51
NEXT SOLAR INC17
NEXT SOLAR, INC8
Next Solar Inc DBA Next Electric5
Next Solar Inc.2
Next Solar inc1
Next Solar Inc DBA1

Common questions

Where does Next Solar Inc install solar?

Its installs are spread across 22 counties. The most are in Contra Costa County (40 installs), followed by Alameda County (38).

How often does Next Solar Inc install batteries with solar?

1.8% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 1). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Next Solar Inc installs are under NEM 3.0 (the Net Billing Tariff)?

10 of its 215 interconnected installs (4.7% of the 215 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 40.0% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.