Solar installers in Sacramento County, California
Who installs the most solar in Sacramento County?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Sacramento County are Sunrun (7), BRIGHT OPS (3) and FREEDOM FOREVER LLC (3). They account for 13 of the 37 residential solar installs interconnected there in that window.
In all, 333 homes in Sacramento County have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 23 of 23 installers with installs in this window. 1 installs in the window were self-installed or had no installer recorded.
Most installs, all time
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 28 | 10 |
| 2023 | 41 | 9 |
| 2024 | 28 | 23 |
| 2025 | 20 | 14 |
| 2026 (through Aug 31, 2026) | 9 | 8 |
Under the Net Billing Tariff (NEM 3.0)
56 of the 333 residential solar installs in Sacramento County (16.8% of the 333 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 83.9% of those include battery storage. The latest was approved Jul 1, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Sacramento County
| 1 | Sunrun | 21 | 21 | 100.0% |
| 2 | BRIGHT OPS | 5 | 5 | 100.0% |
| 3 | FREEDOM FOREVER LLC | 5 | 3 | 60.0% |
| 4 | AMBROSE SOLAR | 2 | 2 | 100.0% |
| 5 | FIVE STAR SOLAR | 2 | 2 | 100.0% |
| 6 | SunPower | 2 | 2 | 100.0% |
| 7 | V3 Electric | 2 | 2 | 100.0% |
| 8 | A P ELECTRICAL | 1 | 1 | 100.0% |
| 9 | AMERISUN | 1 | 0 | 0.0% |
| 10 | Aztec Solar Inc | 1 | 1 | 100.0% |
| 11 | Complete Solar | 1 | 0 | 0.0% |
| 12 | CONTINUUM | 1 | 1 | 100.0% |
| 13 | JHP ELECTRIC INC | 1 | 1 | 100.0% |
| 14 | LEVION CONSTRUCTION LLC | 1 | 0 | 0.0% |
| 15 | NEXT ELECTRIC | 1 | 1 | 100.0% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Cities in Sacramento County
| City | All-time installs |
|---|---|
| Walnut Grove | 114 |
| Isleton | 89 |
| Galt | 52 |
| Elverta | 50 |
| Ryde | 7 |
| Sacramento | 6 |
| Davis | 4 |
| Rio Vista | 4 |
| Courtland | 3 |
| Cameron Park | 1 |
| Danville | 1 |
| El Dorado | 1 |
| Roseville | 1 |
ZIP codes in Sacramento County
ZIP codes with their own page where the utilities recorded Sacramento County on at least 10% of the ZIP’s installs, through Aug 31, 2026.
Equipment recorded
In the last 24 months, 35 of Sacramento County’s 37 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (8, 22.9%) used modules recorded as Qcells.
In the last 24 months, 37 of Sacramento County’s 37 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (15, 40.5%) used inverters recorded as Tesla.
In the last 24 months, 25 of Sacramento County’s 37 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (11, 44.0%) used batteries recorded as Tesla.
64 of 70 battery-paired PG&E and SCE installs (91.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 8 | 64 |
| JA Solar | 7 | 28 | |
| Canadian Solar | 4 | 28 | |
| REC | 4 | 23 | |
| LONGi | 3 | 22 | |
| Inverter maker | Tesla | 15 | 36 |
| Enphase | 12 | 92 | |
| SolarEdge | 9 | 119 | |
| Sol-Ark | 2 | not in top list | |
| Delta Electronics | 1 | not in top list | |
| Battery maker | Tesla | 11 | 31 |
| Enphase | 7 | 10 | |
| SolarEdge | 5 | 12 | |
| FranklinWH | 1 | 1 | |
| PointGuard Energy Inc. | 1 | 1 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 319 of 333 installs, inverters on 333. See the methodology and the equipment index.
SGIP battery storage projects in Sacramento County
The SGIP public project report downloaded Nov 16, 2026 lists 580 battery storage projects in Sacramento County with the status Paid, carrying $3,783,773 in current incentive allocations and 12,195 kWh of storage. Across every status it lists 1,916 storage projects there, 296 of them cancelled and 1,040 at another stage.
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 580 | 12,195 | $3,783,773 |
| Reserved | 787 | 12,260 | $18,956,597 |
| Pending Reservation | 113 | 1,661 | $2,992,826 |
| Waitlist | 106 | 1,520 | $2,089,991 |
| Cancelled | 296 | 10,457 | $20,750,154 |
| RRF Rejected | 34 | 451 | $68,272 |
Installers named on the most SGIP storage projects in Sacramento County
| Installer | Projects | Paid |
|---|---|---|
| ES SOLAR LLC | 809 | 321 |
| HAVEN ENERGY SERVICES INC | 458 | 12 |
| SOLAR 4 AMERICA | 81 | 37 |
| PetersenDean | 80 | 36 |
| SOLCORE INC | 48 | 0 |
| SPARTAN HOME SERVICES | 47 | 10 |
| Sunrun | 47 | 12 |
| Semper Solaris Construction Inc | 42 | 21 |
| GRID Alternatives | 34 | 0 |
| Infinity Energy, Inc | 28 | 23 |
147 of the 1,916 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
Electric utilities serving Sacramento County (EIA)
EIA’s 2025 Service Territory file lists 3 utilities serving Sacramento County. 2 filed net metering rows; their counts below cover each utility’s whole California service area, not only this county.
| Utility (EIA name) | Ownership (EIA) | PV installations | Residential | PV capacity MW | Unit | PV-paired batteries |
|---|---|---|---|---|---|---|
| Pacific Gas & Electric Co. | Investor Owned | 949,590 | 924,854 | 9,449.31 | AC | 178,468 |
| Sacramento Municipal Util Dist | Political Subdivision | 64,626 | 62,657 | 423.393 | AC | 3,281 |
Also listed for this county, with no utility-level net metering row in the 2025 file: WAPA-- Western Area Power Administration.
From EIA’s Form EIA-861 2025 data files (downloaded Nov 16, 2026). EIA describes the net metering file this way: “The data contain cumulative installation count and capacity of generators that are net metered by technology, state, sector, and balancing authority.” Counts are utility-reported as of December 31, 2025, for each utility’s whole California service area. Unit is the capacity unit the utility reported, AC or DC; EIA’s utility rows are “reported as collected,” so DC and AC figures are not converted here. Blank cells are cells EIA printed as a period. EIA’s file notes: “All Technologies does not include batteries.”
SolarAPP+ automated permitting
Sacramento County is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST. The list gives no start date.
Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.
Solar contractor licenses in Sacramento County
55 C-46 Solar licenses in the CSLB License Master file downloaded Nov 4, 2026 (latest LastUpdate date in the file: Nov 4, 2026) list Sacramento County as the county: 42 with the business type Corporation, Limited Liability, Partnership or JointVenture and 13 Sole Owner. 30 C-10 Electrical licenses in Sacramento County carry license numbers the utilities recorded on 10 or more residential solar records.
Solar contractor licenses in Sacramento County, with status, bond and workers’ compensation fields as CSLB publishes them. Sole Owner licenses are counted but not named.
Solar permit data in Sacramento County
2 permit datasets in Sacramento County are published as open data that this index can read. Each counts permits issued by the agency named, with its own filter, so the rows are not added together. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.
| Area covered | Agency | Solar permits, 2025 | Battery permits, 2025 | Full table |
|---|---|---|---|---|
| City of Sacramento | City of Sacramento Community Development Department | 481 | 355 | Below |
| unincorporated Sacramento County | Sacramento County | 647 | 289 | Below |
Solar permits issued in the City of Sacramento
From The City of Sacramento Community Development Department’s open data: Building Permits Issued, archive and current-year layers, City of Sacramento open data. Counted by calendar year of the Status_Date field. Solar: Work_Desc contains SOLAR or PHOTOVOLTAIC, or Category = 'Solar System'; Type = 'Residential'; Sub_Type is 'Web-Minor' or 'Minor' (permits for existing homes); descriptions that begin with a 0 kW or null solar size are left out. Battery: Type = 'Residential' and Work_Desc lists a nonzero PV storage size or mentions BATTER, ENERGY STORAGE or POWERWALL. Checked Nov 16, 2026.
| Year | Solar permits | Battery permits |
|---|---|---|
| 2018 | 1,156 | 14 |
| 2019 | 1,093 | 18 |
| 2020 | 1,133 | 31 |
| 2021 | 1,000 | 31 |
| 2022 | 936 | 39 |
| 2023 | 575 | 76 |
| 2024 | 406 | 71 |
| 2025 | 481 | 355 |
| 2026 (through Nov 16, 2026) | 576 | 897 |
A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected. Sacramento homes are served by SMUD, which does not report to California DG Stats, so the city’s permits are the public record of rooftop solar there on this site. New homes, which California requires to include solar, are filed as new-building and production permits and are not in the solar count. The layer names the contractor but no license number, so permits are not linked to installers.
Solar permits issued in unincorporated Sacramento County
From Sacramento County’s open data: Permits, Sacramento County ArcGIS layer listed on data.saccounty.gov. Counted by calendar year of the ISSUED_DATE field. Solar: Application_Type = 'Residential' and either PermitCategory = 'SolarApp', or PermitCategory = 'MISR' (miscellaneous residential) with a WorkDescription that names a photovoltaic or solar PV system, rooftop solar or solar panels, or mentions solar with kW or modules; descriptions about removing and reinstalling, adding to existing solar, pool or water heating, or 'no solar' are left out. Battery: those solar permits whose WorkDescription mentions BATTER, ENERGY STORAGE or POWERWALL (any case). Latest solar permit issue date in the data: Nov 14, 2026. Checked Nov 16, 2026.
| Year | Solar permits | Battery permits |
|---|---|---|
| 2021 | 908 | 115 |
| 2022 | 811 | 145 |
| 2023 | 587 | 104 |
| 2024 | 396 | 104 |
| 2025 | 647 | 289 |
| 2026 (through Nov 16, 2026) | 740 | 326 |
By month, December 2024 to November 2026
| Month issued | Solar permits | With a battery |
|---|---|---|
| December 2024 | 29 | 8 |
| January 2025 | 40 | 14 |
| February 2025 | 22 | 4 |
| March 2025 | 145 | 56 |
| April 2025 | 36 | 12 |
| May 2025 | 39 | 13 |
| June 2025 | 32 | 16 |
| July 2025 | 32 | 18 |
| August 2025 | 51 | 32 |
| September 2025 | 55 | 30 |
| October 2025 | 49 | 29 |
| November 2025 | 69 | 27 |
| December 2025 | 77 | 38 |
| January 2026 | 33 | 18 |
| February 2026 | 18 | 13 |
| March 2026 | 37 | 14 |
| April 2026 | 34 | 21 |
| May 2026 | 38 | 19 |
| June 2026 | 113 | 35 |
| July 2026 | 115 | 27 |
| August 2026 | 102 | 55 |
| September 2026 | 134 | 48 |
| October 2026 | 78 | 49 |
| November 2026 (through Nov 16, 2026) | 38 | 27 |
A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected. Sacramento County issues building permits for the unincorporated county. Cities such as Sacramento, Elk Grove, Citrus Heights, Folsom and Rancho Cordova issue their own; the City of Sacramento’s are shown separately. Most of the county is served by SMUD, which does not report to California DG Stats. The layer’s issue dates begin in 2021, so earlier years are not shown. New homes, filed as new-building and production permits, are not in the solar count. The layer names a contractor on most permits but no license number, so permits are not linked to installers.
At a glance
- Residential solar installs
- 333
- Last 24 months
- 37
- Capacity
- 2,827.9 kW DC
- Median system size
- 7 kW DC
- With battery storage
- 21.0% all time; 81.1% last 24 months
- Third-party owned
- 24.6% where reported
- Ownership types recorded
- PPA 69, lease 12, other 1
- Median battery size
- 9.8 kWh
- Earliest install in data
- Dec 15, 2003
Common questions
How many homes in Sacramento County have solar?
333 residential solar systems in Sacramento County were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 37 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Sacramento County?
23 installer names have at least one install interconnected in Sacramento County in the last 24 months, and 139 appear in the full record.
How common are batteries with new solar in Sacramento County?
21.0% of the solar installs interconnected in Sacramento County include battery storage across all years, and 81.1% in the last 24 months (30 of 37).
How many solar installs in Sacramento County are under NEM 3.0?
56 of the 333 residential solar installs in Sacramento County (16.8% of the 333 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 83.9% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.