Sierra Pacific Home & Comfort

How many solar installs has Sierra Pacific Home & Comfort done in California, and which license number is on its installs?

Sierra Pacific Home & Comfort has 1,573 residential solar installs interconnected in California, active in the records from 2002 through 2026 (Dec 23, 2002 to May 29, 2026), most of them in Placer County (678), El Dorado County (301) and Yolo County (205). CSLB lists license 453302 (SIERRA PACIFIC HOME & COMFORT INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-20, C-36, C-46, C-53, expires Mar 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
1,573
Last 24 months
52
Total capacity
10,197.7 kW DC
Median system size
5.9 kW DC
With battery storage
3.6% all time; 75.0% last 24 months
Third-party owned
0.0% of 1,573 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
36 installs, latest May 29, 2026
Ownership types recorded
none recorded
Median battery size
18 kWh (53 installs list a capacity)
First install
Dec 23, 2002
Latest install
May 29, 2026
Counties
18
Utilities
PGE 1,573
CSLB license
453302

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2002 to 2026

YearInstalls interconnectedWith battery storage
200210
2003100
2004230
2005230
2006380
2007590
2008430
2009500
20101490
2011730
2012600
2013960
20141500
20152400
20161220
2017160
2018130
2019400
2020882
20211025
2022588
2023581
20242312
20252719
2026 (through Aug 31, 2026)119

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

36 of its 1,573 interconnected installs (2.3% of the 1,573 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 91.7% of those include battery storage. The latest Net Billing Tariff install was approved May 29, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.01,14072.5%not counted
NEM 2.039725.2%21 (5.3%)
Net Billing Tariff362.3%33 (91.7%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Sierra Pacific Home & Comfort’s installs. No residential system in the file lists a third-party owner name that matches Sierra Pacific Home & Comfort exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 44 of Sierra Pacific Home & Comfort’s 52 installs name a module maker in the “Generator Manufacturer” fields, and most of those (32, 72.7%) used modules recorded as Hyundai.

In the last 24 months, 52 of Sierra Pacific Home & Comfort’s 52 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (33, 63.5%) used inverters recorded as Generac.

In the last 24 months, 33 of Sierra Pacific Home & Comfort’s 52 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (26, 78.8%) used batteries recorded as Generac.

45 of 56 battery-paired PG&E and SCE installs (80.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHyundai32not in top list
Panasonic8187
Qcells2not in top list
Kyocera1492
LG1106
Inverter makerGenerac3397
SolarEdge11792
Tesla9not in top list
Enphase427
SMA2609
Battery makerGenerac2634
Tesla77

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 1,517 of 1,573 installs, inverters on 1,573. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Sierra Pacific Home & Comfort as developer on 6 battery storage projects and as installer on 4 (4 name it as both), 6 projects in all with 104 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from May 1, 2017 to Aug 11, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled6104$48,761

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage569$18,7610$0
Equity Resiliency135$30,0000$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
453302SIERRA PACIFIC HOME & COMFORT INC (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-36; C-46 Solar Contractor; C-53Mar 12, 1984Mar 31, 2028891

License numbers are the ones the utilities recorded on the interconnection applications (893 of 1,573 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 453302. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Placer678
El Dorado301
Yolo205
San Joaquin145
Solano98
Amador30
Sutter29
Yuba25
Calaveras23
Nevada14
Stanislaus8
Sacramento7
Colusa3
Sonoma2
Tuolumne2
Alameda1
Fresno1
Merced1

Top cities

CityInstalls
Lincoln225
Rocklin188
El Dorado Hills158
Granite Bay86
Davis81
Auburn73
Stockton67
Woodland63
Vacaville57
West Sacramento45
Shingle Springs41
Loomis39
Cameron Park34
Placerville26
Manteca23

Names as recorded by the utilities

The utilities recorded this installer under 17 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Sierra Pacific Home & Comfort695
SIERRA PACIFIC HOME & COMFORT INC383
Sierra Pacific Home & Comfort Inc.342
Sierra Pacific home and Comfort100
Sierra Pacific Home & Comfort Inc14
Sierra Pacific Home and Comfort12
Sierra pacific Home & Comfort5
SIERRA PACIFIC HOME & COMFORT5
Sierra Pacific Home & Comfort, Inc4
Sierra Pacific Home & Comfort, Inc.3
Sierra Pacific Home& Comfort3
Sierra Pacific Home and Comfort Inc.2
Sierra Pacific Home & Comfort , Inc.1
Sierra Pacific Home & comfort Inc.1
SIERRA PACIFIC HOME & COMFORT, INC.1
Sierra Pacific Home &Comfort1
Sierra Pacific Home and Comfort Inc1

Common questions

Where does Sierra Pacific Home & Comfort install solar?

Its installs are spread across 18 counties. The most are in Placer County (678 installs), followed by El Dorado County (301).

How often does Sierra Pacific Home & Comfort install batteries with solar?

3.6% of its interconnected solar installs include battery storage across all years, and 75.0% in the last 24 months (39 of 52).

How many Sierra Pacific Home & Comfort installs are under NEM 3.0 (the Net Billing Tariff)?

36 of its 1,573 interconnected installs (2.3% of the 1,573 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 91.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.