Solar installers in West Sacramento, California

Most installs here are in Yolo County.

Who installs the most solar in West Sacramento?

Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in West Sacramento are Citadel Roofing and Solar (177), Sunrun (110) and Tesla Energy Operations (formerly SolarCity) (37). They account for 324 of the 650 residential solar installs interconnected there in that window.

In all, 4,848 homes in West Sacramento have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installers ranked by interconnected installs, last 24 months

Sep 2024 through Aug 2026. Top 25 of 89 installers with installs in this window. 12 installs in the window were self-installed or had no installer recorded.

1Citadel Roofing and Solar177348
2Sunrun110479
3Tesla Energy Operations (formerly SolarCity)37498
4NORTH VALLEY LLC2181
5IE CONSTRUCTION2020
6Empower Electric Solar1560
7OHM SOLAR SOLUTIONS1516
8BRIGHT OPS1426
9AMBROSE SOLAR1358
10Westhaven Inc1351
11V3 Electric12143
12BETTER EARTH ELECTRIC INC1123
13FREEDOM FOREVER LLC961
14SENGA ENERGY LLC940
15Magic Sun Solar, Inc.763
16Capital City Solar Electric653
17FIVE STAR SOLAR624
18SOLAR AND ROOF DIRECT66
19Arvo Solar56
20AXIA SOLAR CORP55
21Aztec Solar Inc542
22FREEDOM FOREVER NORTHERN CALIFORNIA LLC55
23SOLAR SAVINGS DIRECT INC524
24Solectric582
25ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING412

Most installs, all time

1Tesla Energy Operations (formerly SolarCity)498498
2Sunrun479479
3Citadel Roofing and Solar348348
4SunPower312312
5Vivint Solar Developer, LLC182182
6V3 Electric143143
7Future Energy Corporation114114
8Hooked On Solar108108
9Bright Planet Solar103103
10PetersenDean9191

Installs by year

YearInstalls interconnectedWith battery storage
202258342
202359599
2024360211
2025370244
2026 (through Aug 31, 2026)16190

Under the Net Billing Tariff (NEM 3.0)

657 of the 4,848 residential solar installs in West Sacramento (13.6% of the 4,848 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 88.4% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Installers ranked by Net Billing Tariff installs in West Sacramento

1Sunrun151151100.0%
2Tesla Energy Operations (formerly SolarCity)545092.6%
3Empower Electric Solar343294.1%
4NORTH VALLEY LLC2929100.0%
5BRIGHT OPS262492.3%
6V3 Electric2626100.0%
7FREEDOM FOREVER LLC211990.5%
8SENGA ENERGY LLC2020100.0%
9AMBROSE SOLAR191894.7%
10Westhaven Inc181794.4%
11BETTER EARTH ELECTRIC INC151493.3%
12Citadel Roofing and Solar12650.0%
13Bright Planet Solar11654.5%
14FIVE STAR SOLAR99100.0%
15SunPower9555.6%

Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.

Equipment recorded

In the last 24 months, 617 of West Sacramento’s 650 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (197, 31.9%) used modules recorded as JA Solar.

In the last 24 months, 650 of West Sacramento’s 650 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (353, 54.3%) used inverters recorded as Enphase.

In the last 24 months, 319 of West Sacramento’s 650 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (164, 51.4%) used batteries recorded as Tesla.

617 of 750 battery-paired PG&E and SCE installs (82.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerJA Solar197312
Qcells142825
LONGi84380
REC49369
Silfab48not in top list
Inverter makerEnphase3531,823
Tesla233396
SolarEdge761,448
FranklinWH13not in top list
PointGuard Energy Inc.8not in top list
Battery makerTesla164262
Enphase90162
SolarEdge3591
FranklinWH1214
PointGuard Energy Inc.66

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 4,525 of 4,848 installs, inverters on 4,848. See the methodology and the equipment index.

ZIP codes in West Sacramento

ZIP codes with their own page where the utilities recorded West Sacramento on at least 10% of the ZIP’s installs, through Aug 31, 2026.

956913,9854,013438
95605862863212

SGIP battery storage projects in West Sacramento

The SGIP report lists 101 battery storage projects with the city West Sacramento, 60 with the status Paid ($574,186 in current incentive allocations, 1,604 kWh).

Status as publishedProjectsStorage kWhCurrent incentive
Paid601,604$574,186
PBI in Process11,000$284,089
Reserved8136$250,330
Cancelled261,975$1,223,986
RRF Rejected661$7,765

Installers named on the most SGIP storage projects in West Sacramento

InstallerProjectsPaid
Sunrun1914
Semper Solaris Construction Inc85
Hooked On Solar64
PetersenDean54
SOLAR 4 AMERICA54
SOLAR SAVINGS DIRECT INC50
Tesla Energy Operations (formerly SolarCity)53
ADT SOLAR LLC42
V3 Electric43
AMBROSE SOLAR32

11 of the 101 projects name no installer with a page in this index, so they are counted above but not in this list.

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

All SGIP battery projects, and SGIP battery incentive money by county.

SolarAPP+ automated permitting

West Sacramento is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, MPU, MBD. The list gives no start date.

Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.

At a glance

Residential solar installs
4,848
Last 24 months
650
Capacity
29.1 MW DC
Median system size
5.3 kW DC
With battery storage
15.5% all time; 62.9% last 24 months
Third-party owned
26.3% where reported
Ownership types recorded
PPA 1,005, lease 199, prepaid lease 5, other 64
Median battery size
13.5 kWh
Earliest install in data
Oct 18, 2002

Common questions

How many homes in West Sacramento have solar?

4,848 residential solar systems in West Sacramento were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 650 of them in the last 24 months. Homes on municipal utilities are not included.

How many solar installers work in West Sacramento?

89 installer names have at least one install interconnected in West Sacramento in the last 24 months, and 401 appear in the full record.

How common are batteries with new solar in West Sacramento?

15.5% of the solar installs interconnected in West Sacramento include battery storage across all years, and 62.9% in the last 24 months (409 of 650).

How many solar installs in West Sacramento are under NEM 3.0?

657 of the 4,848 residential solar installs in West Sacramento (13.6% of the 4,848 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 88.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.