Capital City Solar Electric
How many solar installs has Capital City Solar Electric done in California, and which license number is on its installs?
Capital City Solar Electric has 444 residential solar installs interconnected in California, active in the records from 2012 through 2026 (Aug 14, 2012 to Aug 17, 2026), most of them in Placer County (246), Yolo County (131) and El Dorado County (27). CSLB lists license 1018035 (CAPITAL CITY SOLAR ELECTRIC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Sep 30, 2028.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 444
- Last 24 months
- 61
- Total capacity
- 2,970.6 kW DC
- Median system size
- 6.4 kW DC
- With battery storage
- 13.5% all time; 57.4% last 24 months
- Third-party owned
- 0.9% of 444 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 55 installs, latest Aug 17, 2026
- Ownership types recorded
- lease 3, prepaid lease 1
- Median battery size
- 13.8 kWh (8 installs list a capacity)
- First install
- Aug 14, 2012
- Latest install
- Aug 17, 2026
- Counties
- 13
- Utilities
- PGE 444
- CSLB license
- 1018035
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2012 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2012 | 9 | 0 |
| 2013 | 8 | 0 |
| 2014 | 0 | 0 |
| 2015 | 0 | 0 |
| 2016 | 0 | 0 |
| 2017 | 44 | 0 |
| 2018 | 46 | 0 |
| 2019 | 19 | 0 |
| 2020 | 48 | 1 |
| 2021 | 57 | 3 |
| 2022 | 57 | 5 |
| 2023 | 80 | 10 |
| 2024 | 26 | 9 |
| 2025 | 39 | 26 |
| 2026 (through Aug 31, 2026) | 11 | 6 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
55 of its 444 interconnected installs (12.4% of the 444 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 63.6% of those include battery storage. The latest Net Billing Tariff install was approved Aug 17, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 21 | 4.7% | not counted |
| NEM 2.0 | 368 | 82.9% | 22 (6.0%) |
| Net Billing Tariff | 55 | 12.4% | 35 (63.6%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
On 4 of Capital City Solar Electric’s installs the utility recorded a third-party ownership type: PPA 0, lease 3, prepaid lease 1, other 0. No residential system in the file lists a third-party owner name that matches Capital City Solar Electric exactly.
| Third-party owner named on its installs | Installs |
|---|---|
| SunPower Capital LLC | 3 |
| TriBeam Financial, Inc. | 1 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 55 of Capital City Solar Electric’s 61 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (18, 32.7%) used modules recorded as Qcells.
In the last 24 months, 61 of Capital City Solar Electric’s 61 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (27, 44.3%) used inverters recorded as Enphase.
In the last 24 months, 31 of Capital City Solar Electric’s 61 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (19, 61.3%) used batteries recorded as Tesla.
46 of 60 battery-paired PG&E and SCE installs (76.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 18 | 76 |
| REC | 15 | 17 | |
| Canadian Solar | 9 | not in top list | |
| SunPower | 8 | 244 | |
| Mission Solar | 4 | 18 | |
| Inverter maker | Enphase | 27 | 63 |
| Tesla | 23 | 39 | |
| SolarEdge | 15 | 124 | |
| SMA | 4 | 13 | |
| SunPower | 4 | 233 | |
| Battery maker | Tesla | 19 | 27 |
| Enphase | 12 | 16 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 404 of 444 installs, inverters on 444. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 1018035 | CAPITAL CITY SOLAR ELECTRIC (Corporation) | CLEAR | C-10 Electrical Contractor | Sep 8, 2016 | Sep 30, 2028 | 427 |
License numbers are the ones the utilities recorded on the interconnection applications (427 of 444 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1018035. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Other names reported under the same license
- Capital City Solar: 354 installs, license 1018035
Counties
| County | Installs |
|---|---|
| Placer | 246 |
| Yolo | 131 |
| El Dorado | 27 |
| Sutter | 9 |
| San Joaquin | 8 |
| Solano | 6 |
| Yuba | 6 |
| Nevada | 4 |
| Contra Costa | 2 |
| Sonoma | 2 |
| Amador | 1 |
| Calaveras | 1 |
| Napa | 1 |
Top cities
| City | Installs |
|---|---|
| Lincoln | 102 |
| Rocklin | 59 |
| West Sacramento | 53 |
| Granite Bay | 44 |
| Davis | 43 |
| Woodland | 27 |
| Auburn | 20 |
| El Dorado Hills | 18 |
| Loomis | 8 |
| Stockton | 8 |
| Yuba City | 8 |
| Winters | 6 |
| Newcastle | 5 |
| Roseville | 5 |
| Colfax | 3 |
Names as recorded by the utilities
The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| CAPITAL CITY SOLAR ELECTRIC | 336 |
| Capital City Solar Electric | 108 |
Common questions
Where does Capital City Solar Electric install solar?
Its installs are spread across 13 counties. The most are in Placer County (246 installs), followed by Yolo County (131).
How often does Capital City Solar Electric install batteries with solar?
13.5% of its interconnected solar installs include battery storage across all years, and 57.4% in the last 24 months (35 of 61).
How many Capital City Solar Electric installs are under NEM 3.0 (the Net Billing Tariff)?
55 of its 444 interconnected installs (12.4% of the 444 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 63.6% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.