Solar installers in Woodland, California
Most installs here are in Yolo County.
Who installs the most solar in Woodland?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Woodland are Sunrun (269), SonRay Construction Inc. (90) and GAF Energy (43). They account for 402 of the 876 residential solar installs interconnected there in that window.
In all, 7,386 homes in Woodland have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 90 installers with installs in this window. 16 installs in the window were self-installed or had no installer recorded.
| 1 | Sunrun | 269 | 995 |
| 2 | SonRay Construction Inc. | 90 | 401 |
| 3 | GAF Energy | 43 | 43 |
| 4 | SOLARA HOME ENERGY LLC | 40 | 52 |
| 5 | FREEDOM FOREVER LLC | 36 | 115 |
| 6 | Tesla Energy Operations (formerly SolarCity) | 33 | 576 |
| 7 | BETTER EARTH ELECTRIC INC | 23 | 46 |
| 8 | ECLIPSE SOLAR & CONSTRUCTION | 19 | 59 |
| 9 | V3 Electric | 19 | 147 |
| 10 | AMBROSE SOLAR | 18 | 86 |
| 11 | BRIGHT OPS | 18 | 23 |
| 12 | NORTH VALLEY LLC | 18 | 118 |
| 13 | SENGA ENERGY LLC | 18 | 34 |
| 14 | Westhaven Inc | 14 | 108 |
| 15 | Citadel Roofing and Solar | 12 | 61 |
| 16 | CONTINUUM | 9 | 9 |
| 17 | West Coast Solar | 9 | 70 |
| 18 | SOLAR AND ROOF DIRECT | 8 | 8 |
| 19 | All About Solar | 7 | 232 |
| 20 | POWER UP SOLUTIONS LLC | 7 | 7 |
| 21 | Empower Electric Solar | 6 | 62 |
| 22 | PRIME HOME SOLUTIONS | 6 | 18 |
| 23 | WOODLAND ELECTRICAL ENTERPRISES INC | 6 | 8 |
| 24 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 5 | 28 |
| 25 | FREEDOM FOREVER NORTHERN CALIFORNIA LLC | 5 | 5 |
Most installs, all time
| 1 | Sunrun | 995 | 995 |
| 2 | Leonard's Roofing, Inc. | 592 | 592 |
| 3 | Tesla Energy Operations (formerly SolarCity) | 576 | 576 |
| 4 | Vivint Solar Developer, LLC | 571 | 571 |
| 5 | SunPower | 451 | 451 |
| 6 | SonRay Construction Inc. | 401 | 401 |
| 7 | All About Solar | 232 | 232 |
| 8 | Bright Planet Solar | 182 | 182 |
| 9 | V3 Electric | 147 | 147 |
| 10 | NORTH VALLEY LLC | 118 | 118 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 651 | 46 |
| 2023 | 957 | 102 |
| 2024 | 607 | 236 |
| 2025 | 460 | 346 |
| 2026 (through Aug 31, 2026) | 242 | 203 |
Under the Net Billing Tariff (NEM 3.0)
913 of the 7,386 residential solar installs in Woodland (12.4% of the 7,386 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 87.8% of those include battery storage. The latest was approved Aug 28, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Woodland
| 1 | Sunrun | 338 | 336 | 99.4% |
| 2 | Tesla Energy Operations (formerly SolarCity) | 42 | 38 | 90.5% |
| 3 | FREEDOM FOREVER LLC | 39 | 38 | 97.4% |
| 4 | Empower Electric Solar | 38 | 29 | 76.3% |
| 5 | NORTH VALLEY LLC | 38 | 38 | 100.0% |
| 6 | GAF Energy | 33 | 32 | 97.0% |
| 7 | BETTER EARTH ELECTRIC INC | 26 | 26 | 100.0% |
| 8 | V3 Electric | 24 | 22 | 91.7% |
| 9 | BRIGHT OPS | 23 | 22 | 95.7% |
| 10 | ECLIPSE SOLAR & CONSTRUCTION | 18 | 13 | 72.2% |
| 11 | SENGA ENERGY LLC | 15 | 14 | 93.3% |
| 12 | Westhaven Inc | 13 | 13 | 100.0% |
| 13 | All About Solar | 12 | 4 | 33.3% |
| 14 | AMBROSE SOLAR | 12 | 12 | 100.0% |
| 15 | Bright Planet Solar | 10 | 3 | 30.0% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Equipment recorded
In the last 24 months, 796 of Woodland’s 876 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (302, 37.9%) used modules recorded as Qcells.
In the last 24 months, 876 of Woodland’s 876 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (427, 48.7%) used inverters recorded as Tesla.
In the last 24 months, 479 of Woodland’s 876 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (288, 60.1%) used batteries recorded as Tesla.
773 of 1,012 battery-paired PG&E and SCE installs (76.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 302 | 1,397 |
| JA Solar | 122 | 291 | |
| Silfab | 102 | not in top list | |
| LONGi | 68 | 386 | |
| Canadian Solar | 64 | 430 | |
| Inverter maker | Tesla | 427 | 596 |
| Enphase | 402 | 3,414 | |
| SolarEdge | 140 | 2,066 | |
| FranklinWH | 19 | not in top list | |
| SunPower | 19 | 638 | |
| Battery maker | Tesla | 288 | 384 |
| Enphase | 95 | 164 | |
| SolarEdge | 50 | 89 | |
| FranklinWH | 18 | 22 | |
| PointGuard Energy Inc. | 11 | 11 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 6,724 of 7,386 installs, inverters on 7,386. See the methodology and the equipment index.
ZIP codes in Woodland
ZIP codes with their own page where the utilities recorded Woodland on at least 10% of the ZIP’s installs, through Aug 31, 2026.
SGIP battery storage projects in Woodland
The SGIP report lists 104 battery storage projects with the city Woodland, 63 with the status Paid ($514,809 in current incentive allocations, 1,605 kWh).
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 63 | 1,605 | $514,809 |
| PBI in Process | 2 | 2,007 | $500,875 |
| Reserved | 7 | 100 | $174,758 |
| Pending Reservation | 1 | 26 | $54,995 |
| Cancelled | 24 | 6,133 | $4,970,413 |
| RRF Rejected | 7 | 99 | $16,567 |
Installers named on the most SGIP storage projects in Woodland
13 of the 104 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
SolarAPP+ automated permitting
Woodland is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, MPU, MBD. The list gives no start date.
Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.
At a glance
- Residential solar installs
- 7,386
- Last 24 months
- 876
- Capacity
- 43.7 MW DC
- Median system size
- 5.1 kW DC
- With battery storage
- 13.7% all time; 73.3% last 24 months
- Third-party owned
- 39.9% where reported
- Ownership types recorded
- PPA 2,605, lease 310, prepaid lease 9, other 23
- Median battery size
- 13.5 kWh
- Earliest install in data
- Dec 23, 2002
Common questions
How many homes in Woodland have solar?
7,386 residential solar systems in Woodland were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 876 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Woodland?
90 installer names have at least one install interconnected in Woodland in the last 24 months, and 414 appear in the full record.
How common are batteries with new solar in Woodland?
13.7% of the solar installs interconnected in Woodland include battery storage across all years, and 73.3% in the last 24 months (642 of 876).
How many solar installs in Woodland are under NEM 3.0?
913 of the 7,386 residential solar installs in Woodland (12.4% of the 7,386 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 87.8% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.