PRIME HOME SOLUTIONS has 516 residential solar installs interconnected in California, active in the records from 2021 through 2026 (Jul 13, 2021 to Aug 27, 2026), most of them in Placer County (142), Solano County (98) and Yolo County (48). CSLB lists license 1075385 (PRIME HOME SOLUTIONS INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-20, expires May 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
516
Last 24 months
127
Total capacity
4,509 kW DC
Median system size
7.8 kW DC
With battery storage
27.7% all time; 92.1% last 24 months
Third-party owned
0.0% of 516 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
130 installs, latest Aug 27, 2026
Ownership types recorded
none recorded
Median battery size
18 kWh (24 installs list a capacity)
First install
Jul 13, 2021
Latest install
Aug 27, 2026
Counties
26
Utilities
PGE 513, SCE 3
CSLB license
1075385

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
2021110
20221412
202321511
20243523
20255249
2026 (through Aug 31, 2026)6258

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

130 of its 516 interconnected installs (25.2% of the 516 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 96.2% of those include battery storage. The latest Net Billing Tariff install was approved Aug 27, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.010.2%not counted
NEM 2.038574.6%17 (4.4%)
Net Billing Tariff13025.2%125 (96.2%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on PRIME HOME SOLUTIONS’s installs. No residential system in the file lists a third-party owner name that matches PRIME HOME SOLUTIONS exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 124 of PRIME HOME SOLUTIONS’ 127 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (49, 39.5%) used modules recorded as Suzhou Talesun Solar Technologies.

In the last 24 months, 127 of PRIME HOME SOLUTIONS’ 127 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (91, 71.7%) used inverters recorded as PointGuard Energy Inc..

In the last 24 months, 115 of PRIME HOME SOLUTIONS’ 127 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (90, 78.3%) used batteries recorded as PointGuard Energy Inc..

137 of 143 battery-paired PG&E and SCE installs (95.8%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSuzhou Talesun Solar Technologies4958
G-Star Pte Ltd4545
SOLAREVER TECNOLOGIA DE AMERICA SA DE CV1518
Canadian Solar77
Qcells7351
Inverter makerPointGuard Energy Inc.9191
Sigenergy2222
Enphase16276
SolarEdge3132
SMA2not in top list
Battery makerPointGuard Energy Inc.9090
Sigenergy1919
Enphase525
Tesla11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 487 of 516 installs, inverters on 516. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names PRIME HOME SOLUTIONS as developer on 8 battery storage projects and as installer on 8 (8 name it as both), 8 projects in all with 97 kWh of storage. 2 have the status Paid, with $21,650 in current incentive allocations. Applications were received from Jan 14, 2024 to Dec 30, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid228$21,650
Reserved336$56,993
Cancelled332$17,953

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Residential Solar and Storage Equity - AB 209 Non-POU333$70,3891$19,373
Small Residential Storage340$5,9811$2,276
Non-Residential Storage Equity224$20,2260$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1075385PRIME HOME SOLUTIONS INC (Corporation)CLEARB General Building Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning ContractorMay 3, 2021May 31, 2027515

License numbers are the ones the utilities recorded on the interconnection applications (516 of 516 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1075385. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Placer142
Solano98
Yolo48
El Dorado45
Sutter24
Amador20
Contra Costa20
Nevada18
Butte17
San Joaquin16
Yuba13
Alameda12
Santa Clara11
Napa8
Sonoma6
Colusa3
Lake3
Tulare3
Glenn2
Calaveras1
Kern1
Mendocino1
Merced1
Sacramento1
San Mateo1
Tehama1

Top cities

CityInstalls
Rocklin55
Fairfield29
Lincoln27
Vacaville25
Vallejo20
Davis18
Woodland18
Auburn17
El Dorado Hills16
Granite Bay16
Yuba City15
Grass Valley12
Loomis10
Suisun City9
West Sacramento9

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
PRIME HOME SOLUTIONS402
PRIME HOME SOLUTIONS INC105
Prime Home Solutions9

Common questions

Where does PRIME HOME SOLUTIONS install solar?

Its installs are spread across 26 counties. The most are in Placer County (142 installs), followed by Solano County (98).

How often does PRIME HOME SOLUTIONS install batteries with solar?

27.7% of its interconnected solar installs include battery storage across all years, and 92.1% in the last 24 months (117 of 127).

How many PRIME HOME SOLUTIONS installs are under NEM 3.0 (the Net Billing Tariff)?

130 of its 516 interconnected installs (25.2% of the 516 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 96.2% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.