Solar installers in Glenn County, California
Who installs the most solar in Glenn County?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Glenn County are Sunrun (51), CORONEL SOLAR (40) and OHM SOLAR SOLUTIONS (39). They account for 130 of the 309 residential solar installs interconnected there in that window.
In all, 3,266 homes in Glenn County have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 60 installers with installs in this window. 24 installs in the window were self-installed or had no installer recorded.
Most installs, all time
| 1 | Vivint Solar Developer, LLC | 273 | 273 |
| 2 | Alternative Energy Systems, Inc. | 257 | 257 |
| 3 | FREEDOM FOREVER LLC | 250 | 250 |
| 4 | Sunrun | 176 | 176 |
| 5 | Tesla Energy Operations (formerly SolarCity) | 174 | 174 |
| 6 | OHM SOLAR SOLUTIONS | 170 | 170 |
| 7 | PREMIER SOLAR ENERGY INC | 99 | 99 |
| 8 | Revolve Solar | 82 | 82 |
| 9 | North State Solar Energy | 79 | 79 |
| 10 | Royal Aire, Inc. | 72 | 72 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 270 | 6 |
| 2023 | 423 | 23 |
| 2024 | 207 | 102 |
| 2025 | 165 | 117 |
| 2026 (through Aug 31, 2026) | 100 | 37 |
Under the Net Billing Tariff (NEM 3.0)
351 of the 3,266 residential solar installs in Glenn County (10.7% of the 3,266 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 72.9% of those include battery storage. The latest was approved Aug 28, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Glenn County
| 1 | Sunrun | 59 | 59 | 100.0% |
| 2 | OHM SOLAR SOLUTIONS | 45 | 43 | 95.6% |
| 3 | FREEDOM FOREVER LLC | 30 | 30 | 100.0% |
| 4 | CORONEL SOLAR | 29 | 0 | 0.0% |
| 5 | BRIGHT OPS | 24 | 23 | 95.8% |
| 6 | PREMIER SOLAR ENERGY INC | 13 | 12 | 92.3% |
| 7 | BETTER EARTH ELECTRIC INC | 7 | 7 | 100.0% |
| 8 | NORTH VALLEY LLC | 7 | 7 | 100.0% |
| 9 | POWER UP SOLUTIONS LLC | 7 | 5 | 71.4% |
| 10 | Royal Aire, Inc. | 6 | 6 | 100.0% |
| 11 | V3 Electric | 6 | 6 | 100.0% |
| 12 | Westhaven Inc | 6 | 6 | 100.0% |
| 13 | FEATHER RIVER AIRE AND SOLAR | 5 | 5 | 100.0% |
| 14 | FOCUS SOLAR ENERGY INC | 4 | 2 | 50.0% |
| 15 | LEVION CONSTRUCTION LLC | 4 | 0 | 0.0% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Cities in Glenn County
| City | All-time installs |
|---|---|
| Orland | 2,016 |
| Willows | 830 |
| Hamilton City | 215 |
| Glenn | 110 |
| Artois | 40 |
| Butte City | 23 |
| Elk Creek | 21 |
| Princeton | 7 |
| Delevan | 1 |
ZIP codes in Glenn County
ZIP codes with their own page where the utilities recorded Glenn County on at least 10% of the ZIP’s installs, through Aug 31, 2026.
Equipment recorded
In the last 24 months, 279 of Glenn County’s 309 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (114, 40.9%) used modules recorded as Qcells.
In the last 24 months, 309 of Glenn County’s 309 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (182, 58.9%) used inverters recorded as Enphase.
In the last 24 months, 148 of Glenn County’s 309 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (52, 35.1%) used batteries recorded as Enphase.
246 of 300 battery-paired PG&E and SCE installs (82.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 114 | 711 |
| LONGi | 38 | 195 | |
| JA Solar | 29 | not in top list | |
| Silfab | 24 | not in top list | |
| Canadian Solar | 21 | 314 | |
| Inverter maker | Enphase | 182 | 1,691 |
| Tesla | 76 | 116 | |
| SolarEdge | 75 | 833 | |
| SMA | 11 | 256 | |
| Power-One | 7 | 87 | |
| Battery maker | Enphase | 52 | 98 |
| Tesla | 47 | 75 | |
| SolarEdge | 44 | 59 | |
| LG | 3 | 6 | |
| FranklinWH | 1 | 4 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 2,982 of 3,266 installs, inverters on 3,266. See the methodology and the equipment index.
SGIP battery storage projects in Glenn County
The SGIP public project report downloaded Nov 16, 2026 lists 11 battery storage projects in Glenn County with the status Paid, carrying $260,616 in current incentive allocations and 757 kWh of storage. Across every status it lists 27 storage projects there, 10 of them cancelled and 6 at another stage.
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 11 | 757 | $260,616 |
| Reserved | 3 | 99 | $61,929 |
| Pending Reservation | 1 | 15 | $34,199 |
| Cancelled | 10 | 1,461 | $600,432 |
| RRF Rejected | 2 | 351 | $107,403 |
Installers named on the most SGIP storage projects in Glenn County
9 of the 27 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
Electric utilities serving Glenn County (EIA)
EIA’s 2025 Service Territory file lists 2 utilities serving Glenn County. 1 filed net metering rows; their counts below cover each utility’s whole California service area, not only this county.
| Utility (EIA name) | Ownership (EIA) | PV installations | Residential | PV capacity MW | Unit | PV-paired batteries |
|---|---|---|---|---|---|---|
| Pacific Gas & Electric Co. | Investor Owned | 949,590 | 924,854 | 9,449.31 | AC | 178,468 |
Also listed for this county, with no utility-level net metering row in the 2025 file: WAPA-- Western Area Power Administration.
From EIA’s Form EIA-861 2025 data files (downloaded Nov 16, 2026). EIA describes the net metering file this way: “The data contain cumulative installation count and capacity of generators that are net metered by technology, state, sector, and balancing authority.” Counts are utility-reported as of December 31, 2025, for each utility’s whole California service area. Unit is the capacity unit the utility reported, AC or DC; EIA’s utility rows are “reported as collected,” so DC and AC figures are not converted here. Blank cells are cells EIA printed as a period. EIA’s file notes: “All Technologies does not include batteries.”
Solar contractor licenses in Glenn County
2 C-46 Solar licenses in the CSLB License Master file downloaded Nov 4, 2026 (latest LastUpdate date in the file: Nov 4, 2026) list Glenn County as the county: 0 with the business type Corporation, Limited Liability, Partnership or JointVenture and 2 Sole Owner. 1 C-10 Electrical license in Glenn County carries a license number the utilities recorded on 10 or more residential solar records.
Solar contractor licenses in Glenn County, with status, bond and workers’ compensation fields as CSLB publishes them. Sole Owner licenses are counted but not named.
At a glance
- Residential solar installs
- 3,266
- Last 24 months
- 309
- Capacity
- 24.4 MW DC
- Median system size
- 6.5 kW DC
- With battery storage
- 9.2% all time; 60.2% last 24 months
- Third-party owned
- 27.0% where reported
- Ownership types recorded
- PPA 586, lease 226, other 70
- Median battery size
- 13.5 kWh
- Earliest install in data
- Nov 2, 2001
Common questions
How many homes in Glenn County have solar?
3,266 residential solar systems in Glenn County were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 309 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Glenn County?
60 installer names have at least one install interconnected in Glenn County in the last 24 months, and 255 appear in the full record.
How common are batteries with new solar in Glenn County?
9.2% of the solar installs interconnected in Glenn County include battery storage across all years, and 60.2% in the last 24 months (186 of 309).
How many solar installs in Glenn County are under NEM 3.0?
351 of the 3,266 residential solar installs in Glenn County (10.7% of the 3,266 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 72.9% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.