Rancho Electric

How many solar installs has Rancho Electric done in California, and which license number is on its installs?

Rancho Electric has 42 residential solar installs interconnected in California, active in the records from 2011 through 2026 (May 5, 2011 to Mar 16, 2026), most of them in Glenn County (33), Tehama County (5) and Butte County (3). CSLB lists license 276359 (RANCHO ELECTRIC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Mar 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
42
Last 24 months
5
Total capacity
354.8 kW DC
Median system size
8.2 kW DC
With battery storage
2.4% all time; 20.0% last 24 months
Third-party owned
4.8% of 42 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
1 installs, latest Jan 23, 2025
Ownership types recorded
other 2
First install
May 5, 2011
Latest install
Mar 16, 2026
Counties
4
Utilities
PGE 42
CSLB license
276359

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2011 to 2026

YearInstalls interconnectedWith battery storage
201120
201210
201320
201430
201530
2016110
201700
201800
201920
202040
202160
202210
202320
202410
202531
2026 (through Aug 31, 2026)10

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

1 of its 42 interconnected installs (2.4% of the 42 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The latest Net Billing Tariff install was approved Jan 23, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.02252.4%not counted
NEM 2.01945.2%0 (0.0%)
Net Billing Tariff12.4%1 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 2 of Rancho Electric’s installs the utility recorded a third-party ownership type: PPA 0, lease 0, prepaid lease 0, other 2. No residential system in the file lists a third-party owner name that matches Rancho Electric exactly.

Third-party owner named on its installsInstalls
Roger & Linda Cox1
Val Otterson1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 5 of Rancho Electric’s 5 installs name a module maker in the “Generator Manufacturer” fields, and most of those (4, 80.0%) used modules recorded as Qcells.

In the last 24 months, 5 of Rancho Electric’s 5 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (5, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 1 of Rancho Electric’s 5 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as Enphase.

1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells413
LONGi1not in top list
Inverter makerEnphase532
Battery makerEnphase11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 39 of 42 installs, inverters on 42. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
276359RANCHO ELECTRIC (Corporation)CLEARC-10 Electrical ContractorMay 19, 1972Mar 31, 202737

License numbers are the ones the utilities recorded on the interconnection applications (37 of 42 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 276359. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Glenn33
Tehama5
Butte3
Colusa1

Top cities

CityInstalls
Orland18
Willows9
Glenn7
Paradise2
Red Bluff2
Artois1
Chico1
Colusa1
Corning1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Rancho Electric23
RANCHO ELECTRIC19

Common questions

Where does Rancho Electric install solar?

Its installs are spread across 4 counties. The most are in Glenn County (33 installs), followed by Tehama County (5).

How often does Rancho Electric install batteries with solar?

2.4% of its interconnected solar installs include battery storage across all years, and 20.0% in the last 24 months (1 of 5).

How many Rancho Electric installs are under NEM 3.0 (the Net Billing Tariff)?

1 of its 42 interconnected installs (2.4% of the 42 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.