How many solar installs has PREMIER SOLAR ENERGY INC done in California, and which license number is on its installs?

PREMIER SOLAR ENERGY INC has 973 residential solar installs interconnected in California, active in the records from 2020 through 2026 (Jun 28, 2020 to Apr 16, 2026), most of them in Butte County (475), Tehama County (172) and Glenn County (99). The license number recorded on most of its installs, 1064526, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
973
Last 24 months
57
Total capacity
8,014.6 kW DC
Median system size
7.7 kW DC
With battery storage
24.3% all time; 84.2% last 24 months
Third-party owned
0.3% of 973 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
145 installs, latest Dec 22, 2025
Ownership types recorded
PPA 3
Median battery size
5 kWh (13 installs list a capacity)
First install
Jun 28, 2020
Latest install
Apr 16, 2026
Counties
20
Utilities
PGE 973
CSLB license
1064526

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2020 to 2026

YearInstalls interconnectedWith battery storage
2020464
202116024
202225124
202336154
2024128110
20252520
2026 (through Aug 31, 2026)20

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

145 of its 973 interconnected installs (14.9% of the 973 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 93.8% of those include battery storage. The latest Net Billing Tariff install was approved Dec 22, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.010.1%not counted
NEM 2.082785.0%99 (12.0%)
Net Billing Tariff14514.9%136 (93.8%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 3 of PREMIER SOLAR ENERGY INC’s installs the utility recorded a third-party ownership type: PPA 3, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches PREMIER SOLAR ENERGY INC exactly.

Third-party owner named on its installsInstalls
Everbright2
Goodleap1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 51 of PREMIER SOLAR ENERGY INC’s 57 installs name a module maker in the “Generator Manufacturer” fields, and most of those (38, 74.5%) used modules recorded as Mission Solar.

In the last 24 months, 57 of PREMIER SOLAR ENERGY INC’s 57 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (52, 91.2%) used inverters recorded as Enphase.

In the last 24 months, 41 of PREMIER SOLAR ENERGY INC’s 57 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (35, 85.4%) used batteries recorded as Enphase.

196 of 236 battery-paired PG&E and SCE installs (83.1%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerMission Solar38107
Canadian Solar8221
JA Solar2251
Hyundai1not in top list
Qcells194
Inverter makerEnphase52964
Tesla7131
FranklinWH1not in top list
Fronius1not in top list
SolarEdge110
Battery makerEnphase3589
Tesla5106
FranklinWH11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 863 of 973 installs, inverters on 973. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1064526Not found in the CSLB License Master file pulled Nov 4, 2026972

License numbers are the ones the utilities recorded on the interconnection applications (973 of 973 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list PREMIER SOLAR ENERGY INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2021Total
City and County of San Francisco106452622

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Butte475
Tehama172
Glenn99
Colusa92
Shasta50
Sutter35
Yuba14
Placer8
Nevada6
San Joaquin5
Santa Clara3
Sonoma3
Alameda2
Humboldt2
Mendocino2
Lake1
Marin1
Plumas1
San Francisco1
Tuolumne1

Top cities

CityInstalls
Chico223
Paradise129
Oroville86
Corning81
Orland69
Red Bluff55
Colusa50
Williams39
Willows26
Anderson21
Cottonwood20
Yuba City19
Magalia14
Live Oak12
Durham10

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
PREMIER SOLAR ENERGY INC968
PREMIER SOLAR ENERGY5

Common questions

Where does PREMIER SOLAR ENERGY INC install solar?

Its installs are spread across 20 counties. The most are in Butte County (475 installs), followed by Tehama County (172).

How often does PREMIER SOLAR ENERGY INC install batteries with solar?

24.3% of its interconnected solar installs include battery storage across all years, and 84.2% in the last 24 months (48 of 57).

How many PREMIER SOLAR ENERGY INC installs are under NEM 3.0 (the Net Billing Tariff)?

145 of its 973 interconnected installs (14.9% of the 973 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 93.8% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.