Solar installers in Tuolumne County, California

Who installs the most solar in Tuolumne County?

Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Tuolumne County are Sunrun (202), BRIGHT OPS (127) and ROOFXPERTS (125). They account for 454 of the 881 residential solar installs interconnected there in that window.

In all, 4,678 homes in Tuolumne County have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installers ranked by interconnected installs, last 24 months

Sep 2024 through Aug 2026. Top 25 of 81 installers with installs in this window. 33 installs in the window were self-installed or had no installer recorded.

1Sunrun202448
2BRIGHT OPS127127
3ROOFXPERTS125154
4SIG SOLAR, S.I.G.72543
5V3 Electric70188
6Tesla Energy Operations (formerly SolarCity)39279
7Empower Electric Solar2832
8SOLARWORX INC25451
9AXIA SOLAR CORP1414
10WESTERN VALLEY DEVELOPMENT INC12126
11FREEDOM FOREVER LLC987
12RICHARD HEATH & ASSOCIATES INC88
13RADIUS ENERGY77
14POWER UP SOLUTIONS LLC66
15SOLAR NEGOTIATORS67
16SENGA ENERGY LLC511
17ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING49
18BRYTON POWER LLC33
19Gold Electric, Inc.332
20NRG Clean Power38
21PEAK ENERGY GROUP33
22Semper Solaris Construction Inc323
23American Array Solar22
24BETTER EARTH ELECTRIC INC27
25EXO Energy23

Most installs, all time

1SIG SOLAR, S.I.G.543543
2SOLARWORX INC451451
3Sunrun448448
4Alternative Power Solutions, Inc.355355
5Tesla Energy Operations (formerly SolarCity)279279
6V3 Electric188188
7ROOFXPERTS154154
8BRIGHT OPS127127
9WESTERN VALLEY DEVELOPMENT INC126126
10SOLAR INSTALLATION GROUP, INC.9494

Installs by year

YearInstalls interconnectedWith battery storage
202257179
202367488
2024435348
2025463411
2026 (through Aug 31, 2026)256232

Under the Net Billing Tariff (NEM 3.0)

1,061 of the 4,678 residential solar installs in Tuolumne County (22.7% of the 4,678 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 92.5% of those include battery storage. The latest was approved Aug 28, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Installers ranked by Net Billing Tariff installs in Tuolumne County

1Sunrun262262100.0%
2ROOFXPERTS14914295.3%
3BRIGHT OPS12712598.4%
4SIG SOLAR, S.I.G.11110493.7%
5V3 Electric938995.7%
6Tesla Energy Operations (formerly SolarCity)434195.3%
7WESTERN VALLEY DEVELOPMENT INC392564.1%
8Empower Electric Solar272696.3%
9SOLARWORX INC18844.4%
10FREEDOM FOREVER LLC1515100.0%
11AXIA SOLAR CORP1414100.0%
12SOLAR SAVINGS DIRECT INC1010100.0%
13Semper Solaris Construction Inc8787.5%
14RADIUS ENERGY77100.0%
15SOLAR NEGOTIATORS77100.0%

Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.

Cities in Tuolumne County

CityAll-time installs
Sonora2,475
Jamestown547
Groveland449
Tuolumne354
Soulsbyville235
Twain Harte217
Columbia157
La Grange123
Mi Wuk Village60
Chinese Camp18
Coulterville6
Moccasin6
Strawberry6
Pinecrest5
Long Barn4
Cold Springs1
Tracy1

ZIP codes in Tuolumne County

ZIP codes with their own page where the utilities recorded Tuolumne County on at least 10% of the ZIP’s installs, through Aug 31, 2026.

953702,4742,474435
95327546546100
9532144945176
9537935535572
9537223523546
9538321621642
9531015815954
9532912337764
9534661618

Equipment recorded

In the last 24 months, 840 of Tuolumne County’s 881 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (240, 28.6%) used modules recorded as JA Solar.

In the last 24 months, 881 of Tuolumne County’s 881 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (430, 48.8%) used inverters recorded as Tesla.

In the last 24 months, 679 of Tuolumne County’s 881 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (347, 51.1%) used batteries recorded as Tesla.

1,117 of 1,283 battery-paired PG&E and SCE installs (87.1%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerJA Solar240358
Qcells186986
CertainTeed135363
Silfab118440
LONGi43not in top list
Inverter makerTesla430644
Enphase3381,658
SolarEdge1611,544
FranklinWH81128
Sol-Ark15not in top list
Battery makerTesla347528
Enphase157257
SolarEdge87112
FranklinWH81128
LG365

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 4,462 of 4,678 installs, inverters on 4,677. See the methodology and the equipment index.

SGIP battery storage projects in Tuolumne County

The SGIP public project report downloaded Nov 16, 2026 lists 276 battery storage projects in Tuolumne County with the status Paid, carrying $5,195,595 in current incentive allocations and 7,434 kWh of storage. Across every status it lists 536 storage projects there, 236 of them cancelled and 24 at another stage.

Status as publishedProjectsStorage kWhCurrent incentive
Paid2767,434$5,195,595
PBI in Process66,383$5,047,811
Reserved162,876$703,461
Pending Reservation240$56,447
Cancelled2369,752$6,795,807

Installers named on the most SGIP storage projects in Tuolumne County

InstallerProjectsPaid
SOLAR SAVINGS DIRECT INC6253
Infinity Energy, Inc4527
Semper Solaris Construction Inc4530
V3 Electric4436
Sunrun2612
SOLARWORX INC258
Tesla2414
Hooked On Solar2314
SOLAR INSTALLATION GROUP, INC.1812
RADIUS ENERGY1412

108 of the 536 projects name no installer with a page in this index, so they are counted above but not in this list.

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

All SGIP battery projects, and SGIP battery incentive money by county.

Electric utilities serving Tuolumne County (EIA)

EIA’s 2025 Service Territory file lists 5 utilities serving Tuolumne County. 3 filed net metering rows; their counts below cover each utility’s whole California service area, not only this county.

Utility (EIA name)Ownership (EIA)PV installationsResidentialPV capacity MWUnitPV-paired batteries
Pacific Gas & Electric Co.Investor Owned949,590924,8549,449.31AC178,468
Southern California Edison CoInvestor Owned746,002734,4526,267.868AC130,848
Turlock Irrigation DistrictPolitical Subdivision5,6135,41571.514AC0

Also listed for this county, with no utility-level net metering row in the 2025 file: Tuolumne County Pub Power Agny; WAPA-- Western Area Power Administration. For short form filers, EIA’s net metering file note says its state adjustments “include PV capacity from the short form.”

From EIA’s Form EIA-861 2025 data files (downloaded Nov 16, 2026). EIA describes the net metering file this way: “The data contain cumulative installation count and capacity of generators that are net metered by technology, state, sector, and balancing authority.” Counts are utility-reported as of December 31, 2025, for each utility’s whole California service area. Unit is the capacity unit the utility reported, AC or DC; EIA’s utility rows are “reported as collected,” so DC and AC figures are not converted here. Blank cells are cells EIA printed as a period. EIA’s file notes: “All Technologies does not include batteries.”

All California utilities in EIA’s net metering data.

Solar contractor licenses in Tuolumne County

2 C-46 Solar licenses in the CSLB License Master file downloaded Nov 4, 2026 (latest LastUpdate date in the file: Nov 4, 2026) list Tuolumne County as the county: 2 with the business type Corporation, Limited Liability, Partnership or JointVenture and 0 Sole Owner. 1 C-10 Electrical license in Tuolumne County carries a license number the utilities recorded on 10 or more residential solar records.

Solar contractor licenses in Tuolumne County, with status, bond and workers’ compensation fields as CSLB publishes them. Sole Owner licenses are counted but not named.

At a glance

Residential solar installs
4,678
Last 24 months
881
Capacity
37.8 MW DC
Median system size
7.5 kW DC
With battery storage
27.4% all time; 89.8% last 24 months
Third-party owned
21.9% where reported
Ownership types recorded
PPA 913, lease 101, prepaid lease 2, other 7
Median battery size
13.5 kWh
Earliest install in data
Sep 5, 2001

Common questions

How many homes in Tuolumne County have solar?

4,678 residential solar systems in Tuolumne County were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 881 of them in the last 24 months. Homes on municipal utilities are not included.

How many solar installers work in Tuolumne County?

81 installer names have at least one install interconnected in Tuolumne County in the last 24 months, and 358 appear in the full record.

How common are batteries with new solar in Tuolumne County?

27.4% of the solar installs interconnected in Tuolumne County include battery storage across all years, and 89.8% in the last 24 months (791 of 881).

How many solar installs in Tuolumne County are under NEM 3.0?

1,061 of the 4,678 residential solar installs in Tuolumne County (22.7% of the 4,678 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 92.5% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.