WESTERN VALLEY DEVELOPMENT INC

How many solar installs has WESTERN VALLEY DEVELOPMENT INC done in California, and which license number is on its installs?

WESTERN VALLEY DEVELOPMENT INC has 374 residential solar installs interconnected in California, active in the records from 2022 through 2026 (May 18, 2022 to May 1, 2026), most of them in Tuolumne County (126), San Joaquin County (98) and Stanislaus County (70). CSLB lists license 777720 (RADIUS ENERGY) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Apr 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
374
Last 24 months
35
Total capacity
3,144.3 kW DC
Median system size
7.7 kW DC
With battery storage
13.9% all time; 40.0% last 24 months
Third-party owned
0.0% of 374 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
117 installs, latest May 1, 2026
Ownership types recorded
none recorded
Median battery size
9.9 kWh (10 installs list a capacity)
First install
May 18, 2022
Latest install
May 1, 2026
Counties
15
Utilities
PGE 373, SCE 1
CSLB license
777720

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2022 to 2026

YearInstalls interconnectedWith battery storage
2022731
20231824
20249636
20252211
2026 (through Aug 31, 2026)10

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

117 of its 374 interconnected installs (31.3% of the 374 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 41.0% of those include battery storage. The latest Net Billing Tariff install was approved May 1, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.025768.7%4 (1.6%)
Net Billing Tariff11731.3%48 (41.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on WESTERN VALLEY DEVELOPMENT INC’s installs. No residential system in the file lists a third-party owner name that matches WESTERN VALLEY DEVELOPMENT INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 35 of WESTERN VALLEY DEVELOPMENT INC’s 35 installs name a module maker in the “Generator Manufacturer” fields, and most of those (24, 68.6%) used modules recorded as Qcells.

In the last 24 months, 35 of WESTERN VALLEY DEVELOPMENT INC’s 35 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (20, 57.1%) used inverters recorded as Tigo Energy, Inc.

In the last 24 months, 14 of WESTERN VALLEY DEVELOPMENT INC’s 35 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (11, 78.6%) used batteries recorded as FranklinWH.

47 of 52 battery-paired PG&E and SCE installs (90.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells2479
SunPower88
Hyundai3248
Inverter makerTigo Energy, Inc20275
FranklinWH1138
SunPower7not in top list
Enphase410
Tesla3not in top list
Battery makerFranklinWH1140
Tesla33

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 358 of 374 installs, inverters on 374. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names WESTERN VALLEY DEVELOPMENT INC as developer on 0 battery storage projects and as installer on 1 (0 name it as both), 1 projects in all with 14 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Nov 21, 2024 to Nov 21, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled114$2,040

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage114$2,0400$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
777720RADIUS ENERGY (Corporation)CLEARB General Building ContractorApr 20, 2000Apr 30, 2028373

License numbers are the ones the utilities recorded on the interconnection applications (373 of 374 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 777720. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Tuolumne126
San Joaquin98
Stanislaus70
Merced25
Calaveras13
Alameda11
Amador11
Contra Costa9
Fresno3
Mariposa3
Kings1
Marin1
Nevada1
Santa Clara1
Yuba1

Top cities

CityInstalls
Oakdale61
Sonora61
Manteca26
Stockton25
Tracy22
Tuolumne19
Jamestown14
Soulsbyville13
Merced11
Twain Harte10
Riverbank9
Atwater7
Escalon6
Jackson6
Columbia4

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
WESTERN VALLEY DEVELOPMENT INC373
Western Valley Development Inc1

Common questions

Where does WESTERN VALLEY DEVELOPMENT INC install solar?

Its installs are spread across 15 counties. The most are in Tuolumne County (126 installs), followed by San Joaquin County (98).

How often does WESTERN VALLEY DEVELOPMENT INC install batteries with solar?

13.9% of its interconnected solar installs include battery storage across all years, and 40.0% in the last 24 months (14 of 35).

How many WESTERN VALLEY DEVELOPMENT INC installs are under NEM 3.0 (the Net Billing Tariff)?

117 of its 374 interconnected installs (31.3% of the 374 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 41.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.