Solar installers in Merced, California
Most installs here are in Merced County.
Who installs the most solar in Merced?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Merced are Sunrun (410), BRIGHT OPS (88) and Empower Electric Solar (59). They account for 557 of the 934 residential solar installs interconnected there in that window.
In all, 5,656 homes in Merced have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 99 installers with installs in this window. 35 installs in the window were self-installed or had no installer recorded.
Most installs, all time
| 1 | Sunrun | 1,197 | 1,197 |
| 2 | Tesla Energy Operations (formerly SolarCity) | 511 | 511 |
| 3 | Vivint Solar Developer, LLC | 364 | 364 |
| 4 | APG Solar | 224 | 224 |
| 5 | FREEDOM FOREVER LLC | 163 | 163 |
| 6 | R. T. Maher Construction | 163 | 163 |
| 7 | Empower Electric Solar | 156 | 156 |
| 8 | Infinity Energy, Inc | 133 | 133 |
| 9 | Alternative Power Generation | 127 | 127 |
| 10 | SOLGEN ELECTRIC | 126 | 126 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 717 | 36 |
| 2023 | 700 | 73 |
| 2024 | 484 | 361 |
| 2025 | 492 | 446 |
| 2026 (through Aug 31, 2026) | 276 | 237 |
Under the Net Billing Tariff (NEM 3.0)
1,130 of the 5,656 residential solar installs in Merced (20.0% of the 5,656 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 82.7% of those include battery storage. The latest was approved Aug 27, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Merced
| 1 | Sunrun | 438 | 433 | 98.9% |
| 2 | BRIGHT OPS | 105 | 90 | 85.7% |
| 3 | Empower Electric Solar | 67 | 61 | 91.0% |
| 4 | Bright Planet Solar | 44 | 4 | 9.1% |
| 5 | FREEDOM FOREVER LLC | 33 | 29 | 87.9% |
| 6 | SENGA ENERGY LLC | 32 | 31 | 96.9% |
| 7 | APG Solar | 24 | 19 | 79.2% |
| 8 | Tesla Energy Operations (formerly SolarCity) | 23 | 21 | 91.3% |
| 9 | SOLAR NEGOTIATORS | 18 | 18 | 100.0% |
| 10 | POWER UP SOLUTIONS LLC | 17 | 16 | 94.1% |
| 11 | GRID Alternatives | 15 | 7 | 46.7% |
| 12 | PORTER GRAHAM CONSTRUCTION INC | 12 | 12 | 100.0% |
| 13 | EXO Energy | 10 | 2 | 20.0% |
| 14 | BETTER EARTH ELECTRIC INC | 9 | 8 | 88.9% |
| 15 | Citadel Roofing and Solar | 9 | 9 | 100.0% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Equipment recorded
In the last 24 months, 880 of Merced’s 934 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (253, 28.7%) used modules recorded as Qcells.
In the last 24 months, 934 of Merced’s 934 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (447, 47.9%) used inverters recorded as Tesla.
In the last 24 months, 639 of Merced’s 934 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (300, 46.9%) used batteries recorded as Tesla.
972 of 1,208 battery-paired PG&E and SCE installs (80.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 253 | 1,025 |
| JA Solar | 246 | 502 | |
| LONGi | 136 | 544 | |
| Elin Energy | 72 | not in top list | |
| REC | 39 | 699 | |
| Inverter maker | Tesla | 447 | 574 |
| SolarEdge | 264 | 2,186 | |
| Enphase | 235 | 1,547 | |
| FranklinWH | 35 | not in top list | |
| Delta Electronics | 30 | 142 | |
| Battery maker | Tesla | 300 | 404 |
| Enphase | 119 | 180 | |
| SolarEdge | 94 | 132 | |
| LG | 71 | 176 | |
| FranklinWH | 33 | 42 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 5,118 of 5,656 installs, inverters on 5,656. See the methodology and the equipment index.
ZIP codes in Merced
ZIP codes with their own page where the utilities recorded Merced on at least 10% of the ZIP’s installs, through Aug 31, 2026.
SGIP battery storage projects in Merced
The SGIP report lists 78 battery storage projects with the city Merced, 31 with the status Paid ($268,511 in current incentive allocations, 404 kWh).
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 31 | 404 | $268,511 |
| PBI in Process | 1 | 900 | $324,000 |
| Reserved | 14 | 275 | $768,981 |
| Pending Reservation | 4 | 143 | $477,318 |
| Waitlist | 1 | 13 | $14,520 |
| Cancelled | 22 | 417 | $368,732 |
| RRF Rejected | 5 | 72 | $11,685 |
Installers named on the most SGIP storage projects in Merced
10 of the 78 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
SolarAPP+ automated permitting
Merced is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, MPU. The list gives no start date.
Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.
At a glance
- Residential solar installs
- 5,656
- Last 24 months
- 934
- Capacity
- 44.5 MW DC
- Median system size
- 7.1 kW DC
- With battery storage
- 21.4% all time; 88.2% last 24 months
- Third-party owned
- 37.5% where reported
- Ownership types recorded
- PPA 1,854, lease 229, prepaid lease 4, other 33
- Median battery size
- 13.5 kWh
- Earliest install in data
- Oct 4, 2001
Common questions
How many homes in Merced have solar?
5,656 residential solar systems in Merced were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 934 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Merced?
99 installer names have at least one install interconnected in Merced in the last 24 months, and 398 appear in the full record.
How common are batteries with new solar in Merced?
21.4% of the solar installs interconnected in Merced include battery storage across all years, and 88.2% in the last 24 months (824 of 934).
How many solar installs in Merced are under NEM 3.0?
1,130 of the 5,656 residential solar installs in Merced (20.0% of the 5,656 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 82.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.