PORTER GRAHAM CONSTRUCTION INC

How many solar installs has PORTER GRAHAM CONSTRUCTION INC done in California, and which license number is on its installs?

PORTER GRAHAM CONSTRUCTION INC has 161 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Oct 24, 2019 to Jul 9, 2026), most of them in Merced County (130), San Joaquin County (10) and Mariposa County (8). CSLB lists license 961892 (PORTER GRAHAM CONSTRUCTION INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Jun 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
161
Last 24 months
22
Total capacity
1,751.2 kW DC
Median system size
10.3 kW DC
With battery storage
14.3% all time; 68.2% last 24 months
Third-party owned
0.0% of 161 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
19 installs, latest Feb 26, 2026
Ownership types recorded
none recorded
Median battery size
13.5 kWh (22 installs list a capacity)
First install
Oct 24, 2019
Latest install
Jul 9, 2026
Counties
8
Utilities
PGE 161
CSLB license
961892

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
201990
2020281
2021222
2022261
2023450
2024137
20251511
2026 (through Aug 31, 2026)31

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

19 of its 161 interconnected installs (11.8% of the 161 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The latest Net Billing Tariff install was approved Feb 26, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.014288.2%4 (2.8%)
Net Billing Tariff1911.8%19 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on PORTER GRAHAM CONSTRUCTION INC’s installs. No residential system in the file lists a third-party owner name that matches PORTER GRAHAM CONSTRUCTION INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 21 of PORTER GRAHAM CONSTRUCTION INC’s 22 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (8, 38.1%) used modules recorded as REC.

In the last 24 months, 22 of PORTER GRAHAM CONSTRUCTION INC’s 22 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (14, 63.6%) used inverters recorded as Tesla.

In the last 24 months, 11 of PORTER GRAHAM CONSTRUCTION INC’s 22 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (11, 100.0%) used batteries recorded as Tesla.

18 of 23 battery-paired PG&E and SCE installs (78.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC872
Canadian Solar414
JA Solar44
Hyundai3not in top list
EG41not in top list
Inverter makerTesla1416
SMA319
SolarEdge3108
Sol-Ark1not in top list
Solis (Ginlong)1not in top list
Battery makerTesla1113

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 157 of 161 installs, inverters on 161. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
961892PORTER GRAHAM CONSTRUCTION INC (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorJun 8, 2011Jun 30, 2027161

License numbers are the ones the utilities recorded on the interconnection applications (161 of 161 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 961892. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Merced130
San Joaquin10
Mariposa8
Madera7
Stanislaus2
Tuolumne2
Calaveras1
Contra Costa1

Top cities

CityInstalls
Merced67
Atwater53
Chowchilla6
Stockton6
Mariposa5
Winton4
Snelling3
Coulterville2
Manteca2
Oakdale2
Sonora2
Catheys Valley1
Clayton1
El Nido1
Gustine1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
PORTER GRAHAM CONSTRUCTION INC161

Common questions

Where does PORTER GRAHAM CONSTRUCTION INC install solar?

Its installs are spread across 8 counties. The most are in Merced County (130 installs), followed by San Joaquin County (10).

How often does PORTER GRAHAM CONSTRUCTION INC install batteries with solar?

14.3% of its interconnected solar installs include battery storage across all years, and 68.2% in the last 24 months (15 of 22).

How many PORTER GRAHAM CONSTRUCTION INC installs are under NEM 3.0 (the Net Billing Tariff)?

19 of its 161 interconnected installs (11.8% of the 161 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.