Graham Porter Construction, Inc.

How many solar installs has Graham Porter Construction, Inc. done in California, and which license number is on its installs?

Graham Porter Construction, Inc. has 133 residential solar installs interconnected in California, active in the records from 2011 through 2024 (Oct 7, 2011 to Oct 18, 2024), most of them in Merced County (98), San Joaquin County (24) and Madera County (5). CSLB lists license 961892 (PORTER GRAHAM CONSTRUCTION INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Jun 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
133
Last 24 months
1
Total capacity
1,171.7 kW DC
Median system size
8 kW DC
With battery storage
0.0% all time; 0.0% last 24 months
Third-party owned
0.0% of 133 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
2 installs, latest Oct 18, 2024
Ownership types recorded
none recorded
First install
Oct 7, 2011
Latest install
Oct 18, 2024
Counties
6
Utilities
PGE 133
CSLB license
961892

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2011 to 2026

YearInstalls interconnectedWith battery storage
201120
201220
201350
201450
2015260
2016260
2017260
2018240
2019130
202000
202100
202210
202310
202420
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

2 of its 133 interconnected installs (1.5% of the 133 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Oct 18, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.06649.6%not counted
NEM 2.06548.9%0 (0.0%)
Net Billing Tariff21.5%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Graham Porter Construction, Inc.’s installs. No residential system in the file lists a third-party owner name that matches Graham Porter Construction, Inc. exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 1 of Graham Porter Construction, Inc.’s 1 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used modules recorded as REC.

In the last 24 months, 1 of Graham Porter Construction, Inc.’s 1 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1, 100.0%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC1not in top list
Inverter makerEnphase19

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 132 of 133 installs, inverters on 133. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
961892PORTER GRAHAM CONSTRUCTION INC (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorJun 8, 2011Jun 30, 2027123

License numbers are the ones the utilities recorded on the interconnection applications (123 of 133 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 961892. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Merced98
San Joaquin24
Madera5
Tuolumne3
Fresno2
Monterey1

Top cities

CityInstalls
Atwater48
Merced42
Stockton17
Chowchilla5
Los Banos3
Manteca3
Fresno2
Lathrop2
Sonora2
Winton2
La Grange1
Le Grand1
Linden1
Livingston1
Lodi1

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Graham Porter Construction, Inc.113
Graham Porter Construction, Inc12
Graham Porter Construction4
GRAHAM PORTER CONSTRUCTION INC2
Graham Porter Construction Inc.2

Common questions

Where does Graham Porter Construction, Inc. install solar?

Its installs are spread across 6 counties. The most are in Merced County (98 installs), followed by San Joaquin County (24).

How often does Graham Porter Construction, Inc. install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 1).

How many Graham Porter Construction, Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

2 of its 133 interconnected installs (1.5% of the 133 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.