Solar installers in Lathrop, California
Most installs here are in San Joaquin County.
Who installs the most solar in Lathrop?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Lathrop are Citadel Roofing and Solar (410), Sunrun (332) and SunPower (49). They account for 791 of the 1,025 residential solar installs interconnected there in that window.
In all, 4,001 homes in Lathrop have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 51 installers with installs in this window. 2 installs in the window were self-installed or had no installer recorded.
Most installs, all time
| 1 | Sunrun | 1,140 | 1,140 |
| 2 | Tesla Energy Operations (formerly SolarCity) | 491 | 491 |
| 3 | Citadel Roofing and Solar | 412 | 412 |
| 4 | SunPower | 378 | 378 |
| 5 | Vivint Solar Developer, LLC | 363 | 363 |
| 6 | GRID Alternatives | 83 | 83 |
| 7 | American Array Solar | 74 | 74 |
| 8 | FREEDOM FOREVER LLC | 73 | 73 |
| 9 | Bright Planet Solar | 51 | 51 |
| 10 | Complete Solar | 44 | 44 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 532 | 22 |
| 2023 | 553 | 38 |
| 2024 | 445 | 123 |
| 2025 | 510 | 170 |
| 2026 (through Aug 31, 2026) | 386 | 65 |
Under the Net Billing Tariff (NEM 3.0)
681 of the 4,001 residential solar installs in Lathrop (17.0% of the 4,001 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 53.2% of those include battery storage. The latest was approved Aug 28, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Lathrop
| 1 | Citadel Roofing and Solar | 250 | 1 | 0.4% |
| 2 | Sunrun | 203 | 190 | 93.6% |
| 3 | Tesla Energy Operations (formerly SolarCity) | 36 | 27 | 75.0% |
| 4 | BRIGHT OPS | 25 | 22 | 88.0% |
| 5 | FREEDOM FOREVER LLC | 22 | 22 | 100.0% |
| 6 | GRID Alternatives | 22 | 10 | 45.5% |
| 7 | Empower Electric Solar | 15 | 9 | 60.0% |
| 8 | V3 Electric | 10 | 10 | 100.0% |
| 9 | American Array Solar | 6 | 5 | 83.3% |
| 10 | BETTER EARTH ELECTRIC INC | 5 | 5 | 100.0% |
| 11 | NORTH VALLEY LLC | 5 | 5 | 100.0% |
| 12 | POWUR HOME CONSTRUCTION | 5 | 5 | 100.0% |
| 13 | SunPower | 5 | 3 | 60.0% |
| 14 | Bright Planet Solar | 4 | 1 | 25.0% |
| 15 | SIG SOLAR, S.I.G. | 4 | 4 | 100.0% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Equipment recorded
In the last 24 months, 980 of Lathrop’s 1,025 installs name a module maker in the “Generator Manufacturer” fields, and most of those (603, 61.5%) used modules recorded as JA Solar.
In the last 24 months, 1,025 of Lathrop’s 1,025 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (685, 66.8%) used inverters recorded as Enphase.
In the last 24 months, 180 of Lathrop’s 1,025 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (105, 58.3%) used batteries recorded as Tesla.
314 of 443 battery-paired PG&E and SCE installs (70.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | JA Solar | 603 | 856 |
| Qcells | 224 | 789 | |
| Silfab | 54 | not in top list | |
| Canadian Solar | 43 | 175 | |
| LONGi | 24 | 464 | |
| Inverter maker | Enphase | 685 | 1,758 |
| SolarEdge | 213 | 1,337 | |
| Tesla | 193 | 302 | |
| SunPower | 19 | 292 | |
| FranklinWH | 10 | not in top list | |
| Battery maker | Tesla | 105 | 165 |
| SolarEdge | 32 | 55 | |
| Enphase | 24 | 49 | |
| FranklinWH | 10 | 11 | |
| LG | 3 | 22 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 3,749 of 4,001 installs, inverters on 4,001. See the methodology and the equipment index.
ZIP codes in Lathrop
ZIP codes with their own page where the utilities recorded Lathrop on at least 10% of the ZIP’s installs, through Aug 31, 2026.
| 95330 | 4,001 | 4,001 | 1,025 |
SGIP battery storage projects in Lathrop
The SGIP report lists 66 battery storage projects with the city Lathrop, 32 with the status Paid ($3,210,781 in current incentive allocations, 4,739 kWh).
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 32 | 4,739 | $3,210,781 |
| PBI in Process | 3 | 3,006 | $635,706 |
| Reserved | 8 | 111 | $190,054 |
| Cancelled | 19 | 1,274 | $944,276 |
| RRF Rejected | 4 | 52 | $7,804 |
Installers named on the most SGIP storage projects in Lathrop
8 of the 66 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
SolarAPP+ automated permitting
Lathrop is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST. The list gives no start date.
Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.
At a glance
- Residential solar installs
- 4,001
- Last 24 months
- 1,025
- Capacity
- 21.7 MW DC
- Median system size
- 4.5 kW DC
- With battery storage
- 11.1% all time; 26.4% last 24 months
- Third-party owned
- 32.6% where reported
- Ownership types recorded
- PPA 877, lease 371, prepaid lease 4, other 54
- Median battery size
- 13.5 kWh
- Earliest install in data
- Aug 18, 2004
Common questions
How many homes in Lathrop have solar?
4,001 residential solar systems in Lathrop were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 1,025 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Lathrop?
51 installer names have at least one install interconnected in Lathrop in the last 24 months, and 236 appear in the full record.
How common are batteries with new solar in Lathrop?
11.1% of the solar installs interconnected in Lathrop include battery storage across all years, and 26.4% in the last 24 months (271 of 1,025).
How many solar installs in Lathrop are under NEM 3.0?
681 of the 4,001 residential solar installs in Lathrop (17.0% of the 4,001 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 53.2% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.