HOME FRONT CONTRACTORS INC has 136 residential solar installs interconnected in California, active in the records from 2022 through 2026 (Dec 26, 2022 to Aug 14, 2026), most of them in San Joaquin County (32), Alameda County (30) and Santa Clara County (25). CSLB lists license 1080820 (HOME FRONT CONTRACTORS INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Sep 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
136
Last 24 months
65
Total capacity
887.3 kW DC
Median system size
6 kW DC
With battery storage
38.2% all time; 49.2% last 24 months
Third-party owned
0.0% of 136 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
74 installs, latest Aug 14, 2026
Ownership types recorded
none recorded
Median battery size
15 kWh (3 installs list a capacity)
First install
Dec 26, 2022
Latest install
Aug 14, 2026
Counties
14
Utilities
PGE 134, SCE 2
CSLB license
1080820

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2022 to 2026

YearInstalls interconnectedWith battery storage
202210
2023472
20243729
20252413
2026 (through Aug 31, 2026)278

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

74 of its 136 interconnected installs (54.4% of the 136 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 70.3% of those include battery storage. The latest Net Billing Tariff install was approved Aug 14, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.06245.6%0 (0.0%)
Net Billing Tariff7454.4%52 (70.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on HOME FRONT CONTRACTORS INC’s installs. No residential system in the file lists a third-party owner name that matches HOME FRONT CONTRACTORS INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 65 of HOME FRONT CONTRACTORS INC’s 65 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (24, 36.9%) used modules recorded as Qcells.

In the last 24 months, 65 of HOME FRONT CONTRACTORS INC’s 65 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (58, 89.2%) used inverters recorded as Enphase.

In the last 24 months, 32 of HOME FRONT CONTRACTORS INC’s 65 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (31, 96.9%) used batteries recorded as Enphase.

52 of 52 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells2438
Hyundai1616
Znshine88
United Renewable Energy751
LONGi4not in top list
Inverter makerEnphase58129
APsystems (Altenergy Power System)45
SMA11
SunPower14
Tesla11
Battery makerEnphase3151
Tesla11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 132 of 136 installs, inverters on 136. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1080820HOME FRONT CONTRACTORS INC (Corporation)CLEARB General Building ContractorSep 7, 2021Sep 30, 2027136

License numbers are the ones the utilities recorded on the interconnection applications (136 of 136 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1080820. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
San Joaquin32
Alameda30
Santa Clara25
Contra Costa22
San Mateo7
Yolo6
Solano4
Marin3
San Francisco2
Colusa1
Merced1
Orange1
San Benito1
San Bernardino1

Top cities

CityInstalls
San Jose15
Tracy11
Manteca9
Stockton7
Pleasanton6
Berkeley4
Brentwood4
Emeryville4
Lathrop4
Oakland4
San Leandro4
Sunnyvale4
Alamo3
Castro Valley3
Danville3

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
HOME FRONT CONTRACTORS INC135
Home Front Contractors Inc1

Common questions

Where does HOME FRONT CONTRACTORS INC install solar?

Its installs are spread across 14 counties. The most are in San Joaquin County (32 installs), followed by Alameda County (30).

How often does HOME FRONT CONTRACTORS INC install batteries with solar?

38.2% of its interconnected solar installs include battery storage across all years, and 49.2% in the last 24 months (32 of 65).

How many HOME FRONT CONTRACTORS INC installs are under NEM 3.0 (the Net Billing Tariff)?

74 of its 136 interconnected installs (54.4% of the 136 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 70.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources