Solar installers in Manteca, California

Most installs here are in San Joaquin County.

Who installs the most solar in Manteca?

Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Manteca are Sunrun (948), Citadel Roofing and Solar (333) and SOLARA HOME ENERGY LLC (316). They account for 1,597 of the 3,100 residential solar installs interconnected there in that window.

In all, 14,837 homes in Manteca have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installers ranked by interconnected installs, last 24 months

Sep 2024 through Aug 2026. Top 25 of 119 installers with installs in this window. 8 installs in the window were self-installed or had no installer recorded.

1Sunrun9482,661
2Citadel Roofing and Solar333400
3SOLARA HOME ENERGY LLC316336
4Complete Solar163256
5ALLEN ELECTRIC INC128410
6SunPower1272,171
7CALIFORNIA SOLAR PROS INC117117
8Tesla Energy Operations (formerly SolarCity)981,684
9GAF Energy8788
10SonRay Construction Inc.83145
11MARS BUILDER SOLUTIONS7373
12BRIGHT OPS7082
13V3 Electric57112
14FREEDOM FOREVER LLC38246
15SENGA ENERGY LLC3879
16GRID Alternatives28132
17SIG SOLAR, S.I.G.28111
18Empower Electric Solar23179
19Semper Solaris Construction Inc20108
20AXIA SOLAR CORP1818
21POWER UP SOLUTIONS LLC1717
22FIVE STAR SOLAR1563
23American Array Solar13185
24BETTER EARTH ELECTRIC INC1255
25LYTEGEN1212

Most installs, all time

1Sunrun2,6612,661
2SunPower2,1712,171
3Tesla Energy Operations (formerly SolarCity)1,6841,684
4Vivint Solar Developer, LLC821821
5ALLEN ELECTRIC INC410410
6Citadel Roofing and Solar400400
7SOLARA HOME ENERGY LLC336336
8Bright Planet Solar273273
9Complete Solar256256
10FREEDOM FOREVER LLC246246

Installs by year

YearInstalls interconnectedWith battery storage
20221,841134
20231,726166
20241,284638
20251,730938
2026 (through Aug 31, 2026)836484

Under the Net Billing Tariff (NEM 3.0)

1,794 of the 14,837 residential solar installs in Manteca (12.1% of the 14,836 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 81.7% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Installers ranked by Net Billing Tariff installs in Manteca

1Sunrun64761995.7%
2Tesla Energy Operations (formerly SolarCity)13311788.0%
3BRIGHT OPS807492.5%
4Citadel Roofing and Solar691521.7%
5V3 Electric615996.7%
6SOLARA HOME ENERGY LLC553360.0%
7FREEDOM FOREVER LLC545194.4%
8GRID Alternatives462247.8%
9MARS BUILDER SOLUTIONS381026.3%
10SIG SOLAR, S.I.G.353291.4%
11Empower Electric Solar333193.9%
12SunPower312477.4%
13Semper Solaris Construction Inc302480.0%
14SENGA ENERGY LLC2626100.0%
15BETTER EARTH ELECTRIC INC242395.8%

Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.

Equipment recorded

In the last 24 months, 2,939 of Manteca’s 3,100 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (1,319, 44.9%) used modules recorded as Qcells.

In the last 24 months, 3,100 of Manteca’s 3,100 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1,911, 61.6%) used inverters recorded as Enphase.

In the last 24 months, 1,330 of Manteca’s 3,100 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (735, 55.3%) used batteries recorded as Tesla.

2,033 of 2,516 battery-paired PG&E and SCE installs (80.8%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells1,3193,240
JA Solar530897
LONGi3051,281
Silfab236565
Mission Solar180not in top list
Inverter makerEnphase1,9115,406
Tesla9931,466
SolarEdge3874,269
FranklinWH197not in top list
APsystems (Altenergy Power System)130not in top list
Battery makerTesla7351,023
Enphase240383
FranklinWH195214
SolarEdge97179
SunPower4198

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 13,612 of 14,837 installs, inverters on 14,836. See the methodology and the equipment index.

ZIP codes in Manteca

ZIP codes with their own page where the utilities recorded Manteca on at least 10% of the ZIP’s installs, through Aug 31, 2026.

953379,1099,1102,363
953365,6935,694737

SGIP battery storage projects in Manteca

The SGIP report lists 234 battery storage projects with the city Manteca, 130 with the status Paid ($676,296 in current incentive allocations, 1,833 kWh).

Status as publishedProjectsStorage kWhCurrent incentive
Paid1301,833$676,296
PBI in Process21,020$222,222
Reserved205,223$2,717,063
Pending Reservation113$14,520
Cancelled6712,176$4,468,892
RRF Rejected14129$21,295

Installers named on the most SGIP storage projects in Manteca

InstallerProjectsPaid
Semper Solaris Construction Inc3926
GRID Alternatives3221
Sunrun1917
SOLAR 4 AMERICA159
SunPower1512
PetersenDean149
Future Energy Corporation107
Vivint Solar Developer, LLC90
Infinity Energy, Inc85
1st Light Energy Inc63

13 of the 234 projects name no installer with a page in this index, so they are counted above but not in this list.

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

All SGIP battery projects, and SGIP battery incentive money by county.

At a glance

Residential solar installs
14,837
Last 24 months
3,100
Capacity
88.2 MW DC
Median system size
5.2 kW DC
With battery storage
17.0% all time; 53.6% last 24 months
Third-party owned
32.0% where reported
Ownership types recorded
PPA 3,460, lease 1,137, prepaid lease 24, other 122
Median battery size
13.5 kWh
Earliest install in data
Dec 30, 2002

Common questions

How many homes in Manteca have solar?

14,837 residential solar systems in Manteca were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 3,100 of them in the last 24 months. Homes on municipal utilities are not included.

How many solar installers work in Manteca?

119 installer names have at least one install interconnected in Manteca in the last 24 months, and 548 appear in the full record.

How common are batteries with new solar in Manteca?

17.0% of the solar installs interconnected in Manteca include battery storage across all years, and 53.6% in the last 24 months (1,662 of 3,100).

How many solar installs in Manteca are under NEM 3.0?

1,794 of the 14,837 residential solar installs in Manteca (12.1% of the 14,836 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 81.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.