SIG SOLAR, S.I.G.

How many solar installs has SIG SOLAR, S.I.G. done in California, and which license number is on its installs?

SIG SOLAR, S.I.G. has 2,200 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Oct 2, 2019 to Aug 28, 2026), most of them in Stanislaus County (618), Tuolumne County (543) and San Joaquin County (440). CSLB lists license 997639 (SIG SOLAR, S.I.G.) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Oct 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
2,200
Last 24 months
375
Total capacity
21,291.2 kW DC
Median system size
8.9 kW DC
With battery storage
25.0% all time; 90.4% last 24 months
Third-party owned
4.6% of 2,200 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
498 installs, latest Aug 28, 2026
Ownership types recorded
PPA 88, lease 6, other 7
Median battery size
11.5 kWh (221 installs list a capacity)
First install
Oct 2, 2019
Latest install
Aug 28, 2026
Counties
25
Utilities
PGE 2,200
CSLB license
997639

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
2019950
20202930
202134212
202244239
202349643
2024233186
2025196173
2026 (through Aug 31, 2026)10397

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

498 of its 2,200 interconnected installs (22.6% of the 2,200 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 91.2% of those include battery storage. The latest Net Billing Tariff install was approved Aug 28, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.080.4%not counted
NEM 2.01,69477.0%88 (5.2%)
Net Billing Tariff49822.6%454 (91.2%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 101 of SIG SOLAR, S.I.G.’s installs the utility recorded a third-party ownership type: PPA 88, lease 6, prepaid lease 0, other 7. No residential system in the file lists a third-party owner name that matches SIG SOLAR, S.I.G. exactly.

Third-party owner named on its installsInstalls
EVERBRIGHT56
GOODLEAP17
SUNNOVA10
SOLKRAFT8
Concert Finance3

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 365 of SIG SOLAR, S.I.G.’s 375 installs name a module maker in the “Generator Manufacturer” fields, and most of those (340, 93.2%) used modules recorded as Silfab.

In the last 24 months, 375 of SIG SOLAR, S.I.G.’s 375 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (195, 52.0%) used inverters recorded as Tesla.

In the last 24 months, 316 of SIG SOLAR, S.I.G.’s 375 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (182, 57.6%) used batteries recorded as Tesla.

521 of 550 battery-paired PG&E and SCE installs (94.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSilfab3401,327
Qcells25460
LG6268
BP Solar4not in top list
REC3not in top list
Inverter makerTesla195211
Enphase1671,802
FranklinWH87177
EcoFlow2525
SMA8not in top list
Battery makerTesla182197
FranklinWH85175
EcoFlow2525
Enphase24112

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 2,096 of 2,200 installs, inverters on 2,200. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
997639SIG SOLAR, S.I.G. (Corporation)CLEARC-10 Electrical Contractor; C-46 Solar ContractorOct 16, 2014Oct 31, 20282,200

License numbers are the ones the utilities recorded on the interconnection applications (2,200 of 2,200 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 997639. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Stanislaus618
Tuolumne543
San Joaquin440
Calaveras297
Merced90
El Dorado36
Contra Costa33
Mariposa27
Alameda20
Fresno19
Santa Clara18
Madera10
Placer10
Amador9
San Benito8
Solano7
San Luis Obispo3
San Mateo3
Sonoma2
Yolo2
Kern1
Mendocino1
Monterey1
Napa1
Santa Cruz1

Top cities

CityInstalls
Oakdale518
Sonora337
Stockton117
Manteca111
Escalon94
Riverbank83
Copperopolis79
Jamestown71
Angels Camp58
Valley Springs57
Ripon41
Tuolumne36
Atwater31
Tracy30
Murphys29

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SIG SOLAR, S.I.G.1,780
"SIG SOLAR, S.I.G."420

Common questions

Where does SIG SOLAR, S.I.G. install solar?

Its installs are spread across 25 counties. The most are in Stanislaus County (618 installs), followed by Tuolumne County (543).

How often does SIG SOLAR, S.I.G. install batteries with solar?

25.0% of its interconnected solar installs include battery storage across all years, and 90.4% in the last 24 months (339 of 375).

How many SIG SOLAR, S.I.G. installs are under NEM 3.0 (the Net Billing Tariff)?

498 of its 2,200 interconnected installs (22.6% of the 2,200 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 91.2% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.