ALLEN ELECTRIC INC

How many solar installs has ALLEN ELECTRIC INC done in California, and which license number is on its installs?

ALLEN ELECTRIC INC has 569 residential solar installs interconnected in California, active in the records from 2012 through 2026 (Jun 12, 2012 to Aug 14, 2026), most of them in San Joaquin County (488), Stanislaus County (77) and Calaveras County (2). CSLB lists license 917826 (ALLEN ELECTRIC INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires May 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
569
Last 24 months
168
Total capacity
2,407.3 kW DC
Median system size
3.7 kW DC
With battery storage
1.8% all time; 4.8% last 24 months
Third-party owned
0.0% of 569 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
46 installs, latest Aug 14, 2026
Ownership types recorded
none recorded
First install
Jun 12, 2012
Latest install
Aug 14, 2026
Counties
5
Utilities
PGE 568, SCE 1
CSLB license
917826

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2012 to 2026

YearInstalls interconnectedWith battery storage
201210
201300
201480
201560
2016110
2017170
2018110
2019240
2020160
2021530
2022990
20231271
2024933
2025642
2026 (through Aug 31, 2026)394

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

46 of its 569 interconnected installs (8.1% of the 569 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 10.9% of those include battery storage. The latest Net Billing Tariff install was approved Aug 14, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0274.7%not counted
NEM 2.049687.2%5 (1.0%)
Net Billing Tariff468.1%5 (10.9%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on ALLEN ELECTRIC INC’s installs. No residential system in the file lists a third-party owner name that matches ALLEN ELECTRIC INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 165 of ALLEN ELECTRIC INC’s 168 installs name a module maker in the “Generator Manufacturer” fields, and most of those (115, 69.7%) used modules recorded as Mission Solar.

In the last 24 months, 168 of ALLEN ELECTRIC INC’s 168 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (167, 99.4%) used inverters recorded as APsystems (Altenergy Power System).

In the last 24 months, 7 of ALLEN ELECTRIC INC’s 168 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (7, 100.0%) used batteries recorded as FranklinWH.

9 of 10 battery-paired PG&E and SCE installs (90.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerMission Solar115130
Qcells38249
Hyundai8not in top list
Trina Solar3not in top list
Canadian Solar159
Inverter makerAPsystems (Altenergy Power System)167447
FranklinWH810
Enphase187
Battery makerFranklinWH79

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 550 of 569 installs, inverters on 569. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
917826ALLEN ELECTRIC INC (Corporation)CLEARC-10 Electrical ContractorJun 19, 2008May 31, 2027564

License numbers are the ones the utilities recorded on the interconnection applications (569 of 569 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 917826. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
San Joaquin488
Stanislaus77
Calaveras2
Los Angeles1
Merced1

Top cities

CityInstalls
Manteca410
Stockton60
Riverbank52
Oakdale25
Ripon6
Escalon4
Lathrop3
Tracy3
Copperopolis2
French Camp1
Linden1
Livingston1
San Dimas1

Names as recorded by the utilities

The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ALLEN ELECTRIC INC492
Allen Electric Inc.50
Allen Electric Inc14
ALLEN ELECTRIC INC.6
Allen Electric, Inc.6
ALLEN ELECTRIC, INC1

Common questions

Where does ALLEN ELECTRIC INC install solar?

Its installs are spread across 5 counties. The most are in San Joaquin County (488 installs), followed by Stanislaus County (77).

How often does ALLEN ELECTRIC INC install batteries with solar?

1.8% of its interconnected solar installs include battery storage across all years, and 4.8% in the last 24 months (8 of 168).

How many ALLEN ELECTRIC INC installs are under NEM 3.0 (the Net Billing Tariff)?

46 of its 569 interconnected installs (8.1% of the 569 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 10.9% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.