Extreme Solar Solutions

How many solar installs has Extreme Solar Solutions done in California, and which license number is on its installs?

Extreme Solar Solutions has 160 residential solar installs interconnected in California, active in the records from 2015 through 2026 (Oct 27, 2015 to Aug 11, 2026), most of them in Merced County (148), Madera County (6) and Mariposa County (5). CSLB lists license 1017331 (EXTREME SOLAR SOLUTIONS) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-46, expires Aug 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
160
Last 24 months
21
Total capacity
1,497.5 kW DC
Median system size
8.5 kW DC
With battery storage
7.5% all time; 42.9% last 24 months
Third-party owned
0.0% of 160 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
30 installs, latest Aug 11, 2026
Ownership types recorded
none recorded
First install
Oct 27, 2015
Latest install
Aug 11, 2026
Counties
4
Utilities
PGE 160
CSLB license
1017331

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
201510
201650
2017120
2018160
2019170
202090
2021170
2022211
2023351
202471
202594
2026 (through Aug 31, 2026)115

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

30 of its 160 interconnected installs (18.8% of the 160 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 33.3% of those include battery storage. The latest Net Billing Tariff install was approved Aug 11, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.063.8%not counted
NEM 2.012477.5%2 (1.6%)
Net Billing Tariff3018.8%10 (33.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Extreme Solar Solutions’s installs. No residential system in the file lists a third-party owner name that matches Extreme Solar Solutions exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 20 of Extreme Solar Solutions’ 21 installs name a module maker in the “Generator Manufacturer” fields, and most of those (11, 55.0%) used modules recorded as Phono Solar Technology.

In the last 24 months, 21 of Extreme Solar Solutions’ 21 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (20, 95.2%) used inverters recorded as APsystems (Altenergy Power System).

In the last 24 months, 9 of Extreme Solar Solutions’ 21 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (9, 100.0%) used batteries recorded as FranklinWH.

11 of 12 battery-paired PG&E and SCE installs (91.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerPhono Solar Technology1123
Znshine736
Hyundai1not in top list
SunPower1not in top list
Inverter makerAPsystems (Altenergy Power System)2069
FranklinWH911
Delta Electronics1not in top list
SunPower1not in top list
Battery makerFranklinWH911

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 152 of 160 installs, inverters on 160. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1017331EXTREME SOLAR SOLUTIONS (Corporation)CLEARC-46 Solar ContractorAug 17, 2016Aug 31, 2028159

License numbers are the ones the utilities recorded on the interconnection applications (160 of 160 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1017331. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Merced148
Madera6
Mariposa5
Contra Costa1

Top cities

CityInstalls
Atwater62
Merced50
Winton12
Livingston10
Chowchilla4
Snelling4
Catheys Valley3
Le Grand3
Planada3
Dos Palos2
Mariposa2
Coarsegold1
El Cerrito1
Gustine1
Los Banos1

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
EXTREME SOLAR SOLUTIONS117
Extreme Solar Solutions42
Extreme solar solutions1

Common questions

Where does Extreme Solar Solutions install solar?

Its installs are spread across 4 counties. The most are in Merced County (148 installs), followed by Madera County (6).

How often does Extreme Solar Solutions install batteries with solar?

7.5% of its interconnected solar installs include battery storage across all years, and 42.9% in the last 24 months (9 of 21).

How many Extreme Solar Solutions installs are under NEM 3.0 (the Net Billing Tariff)?

30 of its 160 interconnected installs (18.8% of the 160 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 33.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.