APG Solar
How many solar installs has APG Solar done in California, and which license number is on its installs?
APG Solar has 490 residential solar installs interconnected in California, active in the records from 2011 through 2026 (Feb 2, 2011 to Aug 10, 2026), most of them in Merced County (404), Mariposa County (26) and Madera County (16). CSLB lists license 859901 (APG SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-46, D-21, expires May 31, 2028.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 490
- Last 24 months
- 45
- Total capacity
- 4,215.6 kW DC
- Median system size
- 7.8 kW DC
- With battery storage
- 6.5% all time; 62.2% last 24 months
- Third-party owned
- 0.2% of 490 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 43 installs, latest Aug 10, 2026
- Ownership types recorded
- PPA 1
- Median battery size
- 9.6 kWh (1 installs list a capacity)
- First install
- Feb 2, 2011
- Latest install
- Aug 10, 2026
- Counties
- 10
- Utilities
- PGE 490
- CSLB license
- 859901
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2011 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2011 | 9 | 0 |
| 2012 | 35 | 0 |
| 2013 | 37 | 0 |
| 2014 | 25 | 0 |
| 2015 | 2 | 0 |
| 2016 | 0 | 0 |
| 2017 | 3 | 0 |
| 2018 | 1 | 0 |
| 2019 | 28 | 0 |
| 2020 | 70 | 0 |
| 2021 | 64 | 0 |
| 2022 | 57 | 0 |
| 2023 | 95 | 0 |
| 2024 | 28 | 9 |
| 2025 | 22 | 17 |
| 2026 (through Aug 31, 2026) | 14 | 6 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
43 of its 490 interconnected installs (8.8% of the 490 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 69.8% of those include battery storage. The latest Net Billing Tariff install was approved Aug 10, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 110 | 22.4% | not counted |
| NEM 2.0 | 337 | 68.8% | 1 (0.3%) |
| Net Billing Tariff | 43 | 8.8% | 30 (69.8%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
On 1 of APG Solar’s installs the utility recorded a third-party ownership type: PPA 1, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches APG Solar exactly.
| Third-party owner named on its installs | Installs |
|---|---|
| HDM Renewables | 1 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 43 of APG Solar’s 45 installs name a module maker in the “Generator Manufacturer” fields, and most of those (23, 53.5%) used modules recorded as Mission Solar.
In the last 24 months, 45 of APG Solar’s 45 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (32, 71.1%) used inverters recorded as Enphase.
In the last 24 months, 25 of APG Solar’s 45 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (25, 100.0%) used batteries recorded as Enphase.
27 of 32 battery-paired PG&E and SCE installs (84.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Mission Solar | 23 | 149 |
| Hyundai | 9 | not in top list | |
| Qcells | 5 | 126 | |
| REC | 4 | not in top list | |
| SEG Solar | 2 | not in top list | |
| Inverter maker | Enphase | 32 | 77 |
| GoodWe Technologies Co., Ltd. | 10 | 48 | |
| SMA | 2 | 346 | |
| SolarEdge | 1 | not in top list | |
| Tigo Energy, Inc | 1 | not in top list | |
| Battery maker | Enphase | 25 | 27 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 462 of 490 installs, inverters on 490. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 859901 | APG SOLAR (Corporation) | CLEAR | B General Building Contractor; C-10 Electrical Contractor; C-46 Solar Contractor; D-21 | Jun 2, 2005 | May 31, 2028 | 411 |
License numbers are the ones the utilities recorded on the interconnection applications (412 of 490 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 859901. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Other names reported under the same license
- Alternative Power Generation: 317 installs, license 859901
Counties
| County | Installs |
|---|---|
| Merced | 404 |
| Mariposa | 26 |
| Madera | 16 |
| San Joaquin | 14 |
| Stanislaus | 13 |
| Fresno | 9 |
| Calaveras | 3 |
| Alameda | 2 |
| Tuolumne | 2 |
| Contra Costa | 1 |
Top cities
| City | Installs |
|---|---|
| Merced | 224 |
| Atwater | 123 |
| Winton | 19 |
| Mariposa | 17 |
| Chowchilla | 12 |
| Le Grand | 12 |
| Livingston | 10 |
| Oakdale | 7 |
| Catheys Valley | 5 |
| Fresno | 5 |
| Los Banos | 5 |
| Manteca | 5 |
| Tracy | 5 |
| Gustine | 4 |
| La Grange | 4 |
Names as recorded by the utilities
The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| APG SOLAR | 354 |
| APG Solar | 114 |
| apg solar | 22 |
Common questions
Where does APG Solar install solar?
Its installs are spread across 10 counties. The most are in Merced County (404 installs), followed by Mariposa County (26).
How often does APG Solar install batteries with solar?
6.5% of its interconnected solar installs include battery storage across all years, and 62.2% in the last 24 months (28 of 45).
How many APG Solar installs are under NEM 3.0 (the Net Billing Tariff)?
43 of its 490 interconnected installs (8.8% of the 490 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 69.8% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.