APG Solar

How many solar installs has APG Solar done in California, and which license number is on its installs?

APG Solar has 490 residential solar installs interconnected in California, active in the records from 2011 through 2026 (Feb 2, 2011 to Aug 10, 2026), most of them in Merced County (404), Mariposa County (26) and Madera County (16). CSLB lists license 859901 (APG SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-46, D-21, expires May 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
490
Last 24 months
45
Total capacity
4,215.6 kW DC
Median system size
7.8 kW DC
With battery storage
6.5% all time; 62.2% last 24 months
Third-party owned
0.2% of 490 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
43 installs, latest Aug 10, 2026
Ownership types recorded
PPA 1
Median battery size
9.6 kWh (1 installs list a capacity)
First install
Feb 2, 2011
Latest install
Aug 10, 2026
Counties
10
Utilities
PGE 490
CSLB license
859901

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2011 to 2026

YearInstalls interconnectedWith battery storage
201190
2012350
2013370
2014250
201520
201600
201730
201810
2019280
2020700
2021640
2022570
2023950
2024289
20252217
2026 (through Aug 31, 2026)146

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

43 of its 490 interconnected installs (8.8% of the 490 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 69.8% of those include battery storage. The latest Net Billing Tariff install was approved Aug 10, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.011022.4%not counted
NEM 2.033768.8%1 (0.3%)
Net Billing Tariff438.8%30 (69.8%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of APG Solar’s installs the utility recorded a third-party ownership type: PPA 1, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches APG Solar exactly.

Third-party owner named on its installsInstalls
HDM Renewables1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 43 of APG Solar’s 45 installs name a module maker in the “Generator Manufacturer” fields, and most of those (23, 53.5%) used modules recorded as Mission Solar.

In the last 24 months, 45 of APG Solar’s 45 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (32, 71.1%) used inverters recorded as Enphase.

In the last 24 months, 25 of APG Solar’s 45 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (25, 100.0%) used batteries recorded as Enphase.

27 of 32 battery-paired PG&E and SCE installs (84.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerMission Solar23149
Hyundai9not in top list
Qcells5126
REC4not in top list
SEG Solar2not in top list
Inverter makerEnphase3277
GoodWe Technologies Co., Ltd.1048
SMA2346
SolarEdge1not in top list
Tigo Energy, Inc1not in top list
Battery makerEnphase2527

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 462 of 490 installs, inverters on 490. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
859901APG SOLAR (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-46 Solar Contractor; D-21Jun 2, 2005May 31, 2028411

License numbers are the ones the utilities recorded on the interconnection applications (412 of 490 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 859901. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Merced404
Mariposa26
Madera16
San Joaquin14
Stanislaus13
Fresno9
Calaveras3
Alameda2
Tuolumne2
Contra Costa1

Top cities

CityInstalls
Merced224
Atwater123
Winton19
Mariposa17
Chowchilla12
Le Grand12
Livingston10
Oakdale7
Catheys Valley5
Fresno5
Los Banos5
Manteca5
Tracy5
Gustine4
La Grange4

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
APG SOLAR354
APG Solar114
apg solar22

Common questions

Where does APG Solar install solar?

Its installs are spread across 10 counties. The most are in Merced County (404 installs), followed by Mariposa County (26).

How often does APG Solar install batteries with solar?

6.5% of its interconnected solar installs include battery storage across all years, and 62.2% in the last 24 months (28 of 45).

How many APG Solar installs are under NEM 3.0 (the Net Billing Tariff)?

43 of its 490 interconnected installs (8.8% of the 490 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 69.8% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.