SUPREME SOLAR & ELECTRIC has 140 residential solar installs interconnected in California, active in the records from 2024 through 2026 (Apr 25, 2024 to Aug 19, 2026), most of them in Fresno County (105), Merced County (13) and Madera County (12). CSLB lists license 1076925 (SUPREME SOLAR & ELECTRIC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Jun 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
140
Last 24 months
125
Total capacity
1,314 kW DC
Median system size
9.3 kW DC
With battery storage
95.7% all time; 96.0% last 24 months
Third-party owned
0.0% of 140 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
137 installs, latest Aug 19, 2026
Ownership types recorded
none recorded
Median battery size
20.4 kWh (128 installs list a capacity)
First install
Apr 25, 2024
Latest install
Aug 19, 2026
Counties
8
Utilities
PGE 140
CSLB license
1076925

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2024 to 2026

YearInstalls interconnectedWith battery storage
20243332
20257976
2026 (through Aug 31, 2026)2826

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

137 of its 140 interconnected installs (97.9% of the 140 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 97.1% of those include battery storage. The latest Net Billing Tariff install was approved Aug 19, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.032.1%1 (33.3%)
Net Billing Tariff13797.9%133 (97.1%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on SUPREME SOLAR & ELECTRIC’s installs. No residential system in the file lists a third-party owner name that matches SUPREME SOLAR & ELECTRIC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 124 of SUPREME SOLAR & ELECTRIC’s 125 installs name a module maker in the “Generator Manufacturer” fields, and most of those (65, 52.4%) used modules recorded as JinkoSolar.

In the last 24 months, 125 of SUPREME SOLAR & ELECTRIC’s 125 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (50, 40.0%) used inverters recorded as Tesla.

In the last 24 months, 58 of SUPREME SOLAR & ELECTRIC’s 125 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (34, 58.6%) used batteries recorded as Tesla.

67 of 134 battery-paired PG&E and SCE installs (50.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerJinkoSolar6576
NINGBO DEYE ESS Technology CO., LTD3333
SEG Solar2626
LONGi2121
Qcells1420
Inverter makerTesla5050
NeoVolta Inc.3434
SolarEdge2127
Qcells1217
Enphase69
Battery makerTesla3434
SolarEdge1824
Enphase25
Lion Energy11
NeoVolta Inc.11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 139 of 140 installs, inverters on 140. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names SUPREME SOLAR & ELECTRIC as developer on 0 battery storage projects and as installer on 7 (0 name it as both), 7 projects in all with 157 kWh of storage. 3 have the status Paid, with $20,263 in current incentive allocations. Applications were received from Feb 28, 2023 to Jul 20, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid370$20,263
Reserved118$31,892
Cancelled370$34,589

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency370$44,4301$13,315
Small Residential Storage370$10,4222$6,948
Residential Solar and Storage Equity - AB 209 Non-POU118$31,8920$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1076925SUPREME SOLAR & ELECTRIC (Limited Liability)CLEARC-10 Electrical Contractor; C-46 Solar ContractorJun 15, 2021Jun 30, 2027140

License numbers are the ones the utilities recorded on the interconnection applications (140 of 140 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1076925. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list SUPREME SOLAR & ELECTRIC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2024Total
unincorporated San Diego County107692511

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Fresno105
Merced13
Madera12
Kings4
Kern2
Tulare2
Santa Barbara1
Santa Cruz1

Top cities

CityInstalls
Fresno60
Clovis23
Madera8
Merced6
Sanger5
Lemoore4
Chowchilla3
Fowler3
Kingsburg3
Planada3
Selma3
Atwater2
Bakersfield2
Los Banos2
Parlier2

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SUPREME SOLAR & ELECTRIC140

Common questions

Where does SUPREME SOLAR & ELECTRIC install solar?

Its installs are spread across 8 counties. The most are in Fresno County (105 installs), followed by Merced County (13).

How often does SUPREME SOLAR & ELECTRIC install batteries with solar?

95.7% of its interconnected solar installs include battery storage across all years, and 96.0% in the last 24 months (120 of 125).

How many SUPREME SOLAR & ELECTRIC installs are under NEM 3.0 (the Net Billing Tariff)?

137 of its 140 interconnected installs (97.9% of the 140 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 97.1% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.