Solar installers in Madera, California
Most installs here are in Madera County.
Who installs the most solar in Madera?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Madera are Sunrun (557), GAF Energy (486) and DICK DONALD P AIR CONDITIONING INC (354). They account for 1,397 of the 3,248 residential solar installs interconnected there in that window.
In all, 13,726 homes in Madera have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 138 installers with installs in this window. 43 installs in the window were self-installed or had no installer recorded.
| 1 | Sunrun | 557 | 1,848 |
| 2 | GAF Energy | 486 | 486 |
| 3 | DICK DONALD P AIR CONDITIONING INC | 354 | 1,044 |
| 4 | Leonard's Roofing, Inc. | 292 | 842 |
| 5 | Citadel Roofing and Solar | 177 | 575 |
| 6 | LIFESTYLE SOLAR INC | 164 | 360 |
| 7 | SOLAR NEGOTIATORS | 131 | 430 |
| 8 | Empower Electric Solar | 129 | 314 |
| 9 | Complete Solar | 127 | 153 |
| 10 | FREEDOM FOREVER LLC | 90 | 301 |
| 11 | SunPower | 63 | 1,090 |
| 12 | BRIGHT OPS | 51 | 62 |
| 13 | Tesla Energy Operations (formerly SolarCity) | 49 | 919 |
| 14 | LIFESTYLE SOLAR ELECTRIC | 42 | 42 |
| 15 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 36 | 59 |
| 16 | BRIGHTHOUSE LLC | 35 | 37 |
| 17 | Trinity Power | 35 | 71 |
| 18 | V3 Electric | 27 | 29 |
| 19 | SUNNOVA ENERGY CORPORATION | 24 | 26 |
| 20 | TRUE SOLAR & ELECTRIC INC | 16 | 51 |
| 21 | BETTER EARTH ELECTRIC INC | 14 | 55 |
| 22 | Evans Energy | 11 | 99 |
| 23 | GRID Alternatives | 10 | 137 |
| 24 | PACIFIC SOLAR | 10 | 33 |
| 25 | A & J SOLAR ELECTRIC INC | 9 | 15 |
Most installs, all time
| 1 | Sunrun | 1,848 | 1,848 |
| 2 | SunPower | 1,090 | 1,090 |
| 3 | DICK DONALD P AIR CONDITIONING INC | 1,044 | 1,044 |
| 4 | Tesla Energy Operations (formerly SolarCity) | 919 | 919 |
| 5 | Leonard's Roofing, Inc. | 842 | 842 |
| 6 | Citadel Roofing and Solar | 575 | 575 |
| 7 | GAF Energy | 486 | 486 |
| 8 | Vivint Solar Developer, LLC | 454 | 454 |
| 9 | SOLAR NEGOTIATORS | 430 | 430 |
| 10 | LIFESTYLE SOLAR INC | 360 | 360 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 1,779 | 48 |
| 2023 | 1,852 | 113 |
| 2024 | 1,779 | 667 |
| 2025 | 1,594 | 919 |
| 2026 (through Aug 31, 2026) | 956 | 730 |
Under the Net Billing Tariff (NEM 3.0)
2,077 of the 13,726 residential solar installs in Madera (15.1% of the 13,725 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 81.6% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Madera
| 1 | Sunrun | 714 | 712 | 99.7% |
| 2 | GAF Energy | 165 | 165 | 100.0% |
| 3 | Empower Electric Solar | 153 | 148 | 96.7% |
| 4 | SOLAR NEGOTIATORS | 137 | 136 | 99.3% |
| 5 | BRIGHT OPS | 61 | 48 | 78.7% |
| 6 | Tesla Energy Operations (formerly SolarCity) | 58 | 21 | 36.2% |
| 7 | FREEDOM FOREVER LLC | 45 | 45 | 100.0% |
| 8 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 37 | 37 | 100.0% |
| 9 | LIFESTYLE SOLAR INC | 37 | 3 | 8.1% |
| 10 | BRIGHTHOUSE LLC | 33 | 32 | 97.0% |
| 11 | GRID Alternatives | 31 | 5 | 16.1% |
| 12 | BETTER EARTH ELECTRIC INC | 28 | 28 | 100.0% |
| 13 | DICK DONALD P AIR CONDITIONING INC | 28 | 4 | 14.3% |
| 14 | TRUE SOLAR & ELECTRIC INC | 26 | 0 | 0.0% |
| 15 | Bright Planet Solar | 22 | 2 | 9.1% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Equipment recorded
In the last 24 months, 3,099 of Madera’s 3,248 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1,639, 52.9%) used modules recorded as Qcells.
In the last 24 months, 3,248 of Madera’s 3,248 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1,688, 52.0%) used inverters recorded as Enphase.
In the last 24 months, 1,598 of Madera’s 3,248 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (982, 61.5%) used batteries recorded as Tesla.
2,036 of 2,535 battery-paired PG&E and SCE installs (80.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 1,639 | 3,356 |
| JA Solar | 513 | 983 | |
| LONGi | 453 | 1,538 | |
| Trina Solar | 114 | 436 | |
| Elin Energy | 101 | not in top list | |
| Inverter maker | Enphase | 1,688 | 6,057 |
| Tesla | 1,252 | 1,547 | |
| SolarEdge | 596 | 3,792 | |
| FranklinWH | 145 | not in top list | |
| SunPower | 66 | 1,405 | |
| Battery maker | Tesla | 982 | 1,125 |
| Enphase | 305 | 398 | |
| FranklinWH | 139 | 142 | |
| SolarEdge | 105 | 151 | |
| Lunar Energy | 32 | 32 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 12,530 of 13,726 installs, inverters on 13,726. See the methodology and the equipment index.
ZIP codes in Madera
ZIP codes with their own page where the utilities recorded Madera on at least 10% of the ZIP’s installs, through Aug 31, 2026.
SGIP battery storage projects in Madera
The SGIP report lists 124 battery storage projects with the city Madera, 64 with the status Paid ($461,615 in current incentive allocations, 770 kWh).
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 64 | 770 | $461,615 |
| PBI in Process | 5 | 6,178 | $1,694,658 |
| Reserved | 13 | 350 | $291,564 |
| Pending Reservation | 1 | 15 | $16,765 |
| Cancelled | 38 | 1,370 | $875,141 |
| RRF Rejected | 3 | 52 | $7,804 |
Installers named on the most SGIP storage projects in Madera
13 of the 124 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
SolarAPP+ automated permitting
Madera is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, ST, MPU, MBD. The list gives no start date.
Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.
At a glance
- Residential solar installs
- 13,726
- Last 24 months
- 3,248
- Capacity
- 90.9 MW DC
- Median system size
- 5.4 kW DC
- With battery storage
- 18.5% all time; 60.7% last 24 months
- Third-party owned
- 32.8% where reported
- Ownership types recorded
- PPA 3,325, lease 1,065, prepaid lease 12, other 95
- Median battery size
- 13.5 kWh
- Earliest install in data
- Aug 1, 2001
Common questions
How many homes in Madera have solar?
13,726 residential solar systems in Madera were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 3,248 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Madera?
138 installer names have at least one install interconnected in Madera in the last 24 months, and 497 appear in the full record.
How common are batteries with new solar in Madera?
18.5% of the solar installs interconnected in Madera include battery storage across all years, and 60.7% in the last 24 months (1,971 of 3,248).
How many solar installs in Madera are under NEM 3.0?
2,077 of the 13,726 residential solar installs in Madera (15.1% of the 13,725 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 81.6% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.