BRIGHTHOUSE LLC
How many solar installs has BRIGHTHOUSE LLC done in California, and which license number is on its installs?
BRIGHTHOUSE LLC has 280 residential solar installs interconnected in California, active in the records from 2023 through 2026 (Jun 11, 2023 to Aug 28, 2026), most of them in Fresno County (145), Madera County (60) and Kings County (23). CSLB lists license 1099497 (BRIGHTHOUSE LLC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Dec 31, 2026.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 280
- Last 24 months
- 190
- Total capacity
- 2,167.1 kW DC
- Median system size
- 7.1 kW DC
- With battery storage
- 86.8% all time; 97.4% last 24 months
- Third-party owned
- 18.6% of 280 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 218 installs, latest Aug 28, 2026
- Ownership types recorded
- PPA 39, lease 13
- Median battery size
- 14.3 kWh (169 installs list a capacity)
- First install
- Jun 11, 2023
- Latest install
- Aug 28, 2026
- Counties
- 14
- Utilities
- PGE 264, SCE 16
- CSLB license
- 1099497
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2023 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2023 | 38 | 10 |
| 2024 | 84 | 80 |
| 2025 | 101 | 97 |
| 2026 (through Aug 31, 2026) | 57 | 56 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
218 of its 280 interconnected installs (77.9% of the 280 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 98.2% of those include battery storage. The latest Net Billing Tariff install was approved Aug 28, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 11 | 3.9% | not counted |
| NEM 2.0 | 51 | 18.2% | 18 (35.3%) |
| Net Billing Tariff | 218 | 77.9% | 214 (98.2%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
On 52 of BRIGHTHOUSE LLC’s installs the utility recorded a third-party ownership type: PPA 39, lease 13, prepaid lease 0, other 0. Across all installers, 5 residential systems list a third-party owner name that matches BRIGHTHOUSE LLC exactly (after removing case, punctuation and suffixes such as Inc or LLC).
| Third-party owner named on its installs | Installs |
|---|---|
| Everbright | 20 |
| Axess | 6 |
| Brighthouse | 5 |
| Axcess | 4 |
| GoodLeap | 3 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 180 of BRIGHTHOUSE LLC’s 190 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (76, 42.2%) used modules recorded as EG4.
In the last 24 months, 190 of BRIGHTHOUSE LLC’s 190 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (86, 45.3%) used inverters recorded as EG4.
In the last 24 months, 53 of BRIGHTHOUSE LLC’s 190 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (19, 35.8%) used batteries recorded as Enphase.
107 of 243 battery-paired PG&E and SCE installs (44.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | EG4 | 76 | 77 |
| JinkoSolar | 61 | 63 | |
| Aptos Solar | 42 | 42 | |
| Tigo Energy, Inc | 39 | 39 | |
| CertainTeed | 38 | not in top list | |
| Inverter maker | EG4 | 86 | 87 |
| Tigo Energy, Inc | 40 | 40 | |
| SolarEdge | 34 | 39 | |
| Enphase | 33 | 99 | |
| Tesla | 12 | not in top list | |
| Battery maker | Enphase | 19 | 66 |
| LG | 16 | 16 | |
| Tesla | 12 | 12 | |
| SolarEdge | 3 | 3 | |
| sonnen | 2 | 10 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 264 of 280 installs, inverters on 280. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 1099497 | BRIGHTHOUSE LLC (Limited Liability) | CLEAR | B General Building Contractor; C-10 Electrical Contractor | Dec 8, 2022 | Dec 31, 2026 | 279 |
License numbers are the ones the utilities recorded on the interconnection applications (280 of 280 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1099497. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Counties
| County | Installs |
|---|---|
| Fresno | 145 |
| Madera | 60 |
| Kings | 23 |
| Tulare | 18 |
| El Dorado | 12 |
| Kern | 8 |
| Los Angeles | 7 |
| Amador | 1 |
| Calaveras | 1 |
| Mariposa | 1 |
| Merced | 1 |
| Orange | 1 |
| Riverside | 1 |
| Yolo | 1 |
Top cities
| City | Installs |
|---|---|
| Fresno | 90 |
| Madera | 37 |
| Corcoran | 21 |
| Coarsegold | 17 |
| Coalinga | 12 |
| Clovis | 9 |
| Dinuba | 8 |
| Bakersfield | 7 |
| Orange Cove | 6 |
| Fowler | 5 |
| Shingle Springs | 5 |
| Kingsburg | 4 |
| Oakhurst | 4 |
| Parlier | 3 |
| Pomona | 3 |
Names as recorded by the utilities
The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| BRIGHTHOUSE LLC | 280 |
Common questions
Where does BRIGHTHOUSE LLC install solar?
Its installs are spread across 14 counties. The most are in Fresno County (145 installs), followed by Madera County (60).
How often does BRIGHTHOUSE LLC install batteries with solar?
86.8% of its interconnected solar installs include battery storage across all years, and 97.4% in the last 24 months (185 of 190).
How many BRIGHTHOUSE LLC installs are under NEM 3.0 (the Net Billing Tariff)?
218 of its 280 interconnected installs (77.9% of the 280 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 98.2% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.